Operational Experience with the STAR MAPS Vertex Detector

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
STAR Heavy Flavor Tracker
STAR Heavy Flavor Tracker
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Development of an Active Pixel Sensor Vertex Detector H. Matis, F. Bieser, G. Rai, F. Retiere, S. Wurzel, H. Wieman, E. Yamamato, LBNL S. Kleinfelder,
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
L. Greiner1SLAC Test Beam 03/17/2011 STAR LBNL Leo Greiner, Eric Anderssen, Howard Matis, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Research and Development for the HFT at STAR Leo Greiner BNL DAC 03/15/2006.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL System Hardware Architecture.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
X,Sun1USTC discussion, Oct 15, 2010 STAR STAR Heavy Flavor Tracker Upgrade --Status of PXL Detector Xiangming Sun Lawrence Berkeley National Lab L. Greiner,
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
X,Sun1STAR Regional Meeting, Oct 23, 2010, SDU STAR STAR Heavy Flavor Tracker Upgrade --Status of PXL Detector Xiangming Sun( 孙向明 ) Lawrence Berkeley National.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
HFT + TOF: Heavy Flavor Physics Yifei Zhang University of Science & Technology of China Lawrence Berkeley National Lab TOF Workshop, Hangzhou, April,
PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline.
L. Greiner 1PXL Detector Progress – July 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
HFT PIXEL Detector Pre-practice CDR-1 Review 3-Sept Wieman 1.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
MAPS based vertex detector at STAR Michal Szelezniak 1 on behalf of: E. Anderssen 1, X. Dong 1, L. Greiner 1, J. Kapitan 2,S. Margetis 3, H. Matis 1, H.G.
STAR RHIC AGS users meeting, May 30, Star Inner Tracking upgrade F. Videbaek STAR collaboration for the HFT upgrade group.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Spiros Margetis (Kent State Univ.) for the STAR Collaboration STAR Heavy Flavor Tracker Bari, Italy 2014.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
1 STAR HFT Pixel Detector Howard Wieman Lawrence Berkeley National Lab.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1FEE 2014 – STAR PXL Vertex Detector STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
G. Contin | The STAR Heavy Flavor Tracker (HFT) and Upgrade Plan Quark Matter 2015 – Kobe, Japan Session : Future Experimental Facilities,
Measurement of D-meson azimuthal anisotropy in Au+Au 200GeV collisions at RHIC Michael R. Lomnitz Kent State University Lawrence Berkeley National Laboratory.
L. Greiner 1ATLAS Workshop LBL - September, 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
1 Guannan Xie Nuclear Modification Factor of D 0 Mesons in Au+Au Collisions at √s NN = 200 GeV Lawrence Berkeley National Laboratory University of Science.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Heavy Flavor Physics in STAR Flemming Videbæk Brookhaven National Laboratory For the STAR collaboration.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
L. Greiner 1Project X Physics Study, Fermilab, June 18, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
Multiple Scattering and Sensor Thickness Preserving track extrapolation accuracy to bulk of particles at low momentum requires ultra-thin sensors and mechanical.
The STAR PXL detector cooling system LBNL: Eric Anderssen, Giacomo Contin, Leo Greiner, Joe Silber, Thorsten Stezelberger, Xiangming Sun, Michal Szelezniak,
The STAR Heavy Flavor Tracker PXL detector readout electronics
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Leo Greiner, Eric Anderssen, Howard Matis,
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
ScECAL+AHCAL+TCMT Combined Beam FNAL
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

Operational Experience with the STAR MAPS Vertex Detector Leo Greiner Lawrence Berkeley National Laboratory LC Vertex Detector Workshop, Tegernsee Germany, April 30 – May 3, 2017

Outline 1st generation MAPS-based vertex detector Conclusions Detector Design PXL Project Timeline and runs Performance of the HFT Operational aspects and lessons learned Conclusions LC Vertex Detector Workshop 2017 May 1, 2017

The STAR Heavy Flavor Tracker Upgrade Extend the measurement capabilities in the heavy flavor domain, good probe to QGP: Direct topological reconstruction of charm hadrons (e.g. D0  K , c ~ 120 mm) The STAR detector @ RHIC Need to resolve displaced vertices in high multiplicity environment TPC – Time Projection Chamber (main tracking detector in STAR) HFT – Heavy Flavor Tracker SSD – Silicon Strip Detector IST – Intermediate Silicon Tracker PXL – Pixel Detector Tracking inwards with increasingly improved resolution: SV Highlight detecting short lived particles – you have heard about the physics in previous talks  = ~1 mm  = ~300 m  = ~250 m  = <30 m SSD r = 22 IST r = 14 PXL r2 = 8 r1 = 2.8 R (cm) 200 GeV Au-Au collisions @ RHIC dNch/d ~ 700 in central events HFT LC Vertex Detector Workshop 2017 May 1, 2017

PXL MAPS sensor Ultimate-2: third revision sensor developed for PXL by the PICSEL group of IPHC, Strasbourg AMS OPTO 0.35 process Binary readout of hit pixels 4 sub-arrays to help with process variation High resistivity p-epi layer Reduced charge collection time Improved radiation hardness S/N ~ 30 MIP Signal ~ 1000 e- Rolling-shutter type readout A row is selected For each column, a pixel is connected to discriminator Discriminator detects possible hit Move to next row 185.6 ms integration time ~170 mW/cm² power dissipation Pixel matrix 20.7 µm x 20.7 µm pixels 928 rows x 960 columns = ~1M pixel In-pixel amplifier In- pixel Correlated Double Sampling (CDS) Digital section End-of-column discriminators Integrated zero suppression (up to 9 hits/row) Ping-pong memory for frame readout (~1500 w) 2 LVDS data outputs @ 160 MHz LC Vertex Detector Workshop 2017 May 1, 2017

Ladder with 10 MAPS sensors (~ 2×2 cm each) PXL System Overview Basic Detector Element Ladder with 10 MAPS sensors (~ 2×2 cm each) 10 sensors / ladder 4 ladders / sector 5 sectors / half 10 sectors total Mechanical support with kinematic mounts (insertion side) carbon fiber sector tubes (~ 200 µm thick) Cantilevered support LC Vertex Detector Workshop 2017 May 1, 2017

PXL Detector Powering and Readout Chain 2 m (42 AWG TP) 11 m (24 AWG TP) Clk, config, data Clk, config, data, power Mass Termination Board (signal buffering) + latch-up protected power PXL Sector RDO motherboard w/ Xilinx Virtex-6 FPGA 100 m (fiber optic) DAQ PC with fiber link to RDO board PXL built events The readout design of the PXL system is set mostly be the sensor needs and STAR data acquisition and trigger requirements. Integrating this we come up with the following design. 60 um diameter It is even more parallel than shown in the diagram in that all of the ladder readouts are also a copy of the same firmware and we use 4 copies per sector Highly parallel system 4 ladders per sector 1 Mass Termination Board (MTB) per sector 1 sector per RDO board 10 RDO boards in the PXL system Trigger, Slow control, Configuration, etc. Existing STAR infrastructure LC Vertex Detector Workshop 2017 May 1, 2017

PXL Design Parameters 356 M pixels on ~0.16 m2 of Silicon Air cooling DCA Pointing resolution (10  24 GeV/pc) m Layers Layer 1 at 2.8 cm radius Layer 2 at 8 cm radius Pixel size 20.7 m X 20.7 m Hit resolution 3.7 m (6 m geometric) Position stability 5 m rms (20 m envelope) Material budget first layer X/X0 = 0.39% (Al conductor cable) Number of pixels 356 M Integration time (affects pileup) 185.6 s Radiation environment 20 to 90 kRad / year 2*1011 to 1012 1MeV n eq/cm2 Rapid detector replacement < 1 day 356 M pixels on ~0.16 m2 of Silicon Air cooling Sensors thinned to 50 µm LC Vertex Detector Workshop 2017 May 1, 2017

LC Vertex Detector Workshop 2017 PXL Project Timeline and runs LC Vertex Detector Workshop 2017 May 1, 2017

PXL timeline 2003 2004 2005 2006 2007 2008 2009 Analog Sensor R&D HFT proposal submitted to DOE DOE “mission need” (CD-0) DOE R&D $ 2003 2004 2005 2006 2007 2008 2009 Analog Sensor R&D digital binary R&D with IPHC Mechanics R&D DOE tech selection CDR (CD-1) pro $ DOE tech selection TDR (CD-2/3) con $ 2010 2011 2012 2013 2014 2015 2016 Physics run Physics run Physics run Engineering run Sensor refine and fab R&D + Prototype construction Construction and rework The HFT was removed from STAR after the completion of run 16 and put into storage. LC Vertex Detector Workshop 2017 May 1, 2017

PXL data taking Experimental program: DOE approved a 3 year program focusing on D meson production. This is a relatively short program which requires that the detector produce good analyzable data from day 1. This requires significant amount of effort to install a well understood and controlled detector system of new technology and high complexity. 2013 Engineering Run (3 prototype sectors) allowed discovering and fixing: Shorts between power and GND, or LVDS outputs Mechanical interference in the driver boards on the existing design Missing power control, monitoring and overcurrent thresholds functionalities Physics Running - Collected minimum bias events in PXL acceptance: 2014 Run: ~ 1.2 Billion Au+Au @ √sNN = 200GeV 2015 Run: @ √sNN = 200GeV 2016 Run: @ √sNN = 200GeV ~ 1 Billion p+p ~ 0.6 Billion p+Au ~ 2 Billion Au+Au ~ 0.3 Billion d+Au LC Vertex Detector Workshop 2017 May 1, 2017

LC Vertex Detector Workshop 2017 PXL Performance and operational aspects LC Vertex Detector Workshop 2017 May 1, 2017

HFT Performance from 2014 data DCA pointing resolution Design requirement exceeded: 46 µm for 750 MeV/c Kaons for the 2 sectors equipped with aluminum cables on inner layer ~ 30 µm for p > 1 GeV/c From 2015: all sectors equipped with aluminum cables on the inner layer Physics of D-meson productions High significance signal Nuclear modification factor RAA Collective flow v2 First c+ signal observed in HI collisions (QM 2017)! c ~ 60 mm 46 µm D0  K  production in √sNN = 200GeV Au+Au collisions (partial event sample) LC Vertex Detector Workshop 2017 May 1, 2017

Operational Aspects What worked well and what needed extra effort (after initial setup): Mechanics – The detector halves maintained survey pixel positions after insertion and during operational heating and in the cooling airflow (10 m/s). The rapid insertion and removal mechanism worked allowing removal and replacement operation of a 2nd detector in one day. Air cooling worked very well, typical variation in sensor temperature over the runs was within 1-2 degree C. Sector vibration in the radial direction scales as: flow2 Sector vibration at full flow: 5 µm RMS Sector DC displacement scales as: Sector moves in at full flow: (Stable displacement) 25 µm - 30 µm Sector moves in when ladders powered: 3 µm - 8 µm IR image of production PXL ladders. Max ∆T is 12˚ C from ambient. PXL Kinematic mounts Composite IR image of PXL test ladders LC Vertex Detector Workshop 2017 May 1, 2017

Operational Aspects Operational latch-up protection worked well limiting LU related sensor damage to a small number of sensors in a run. (more later in talk) Operational reset for SEU on a 15 minute schedule worked well. RDO worked well allowing trigger rates up to the STAR maximum (~1kHz) TPC rate. The detector in the system context, provided the required DCA pointing resolution and matching the simulations. Run display showing PXL 4% dead at 1.1kHz trigger rate Run 14 data “Bad” inner sensors vs time DCA pointing resolution LC Vertex Detector Workshop 2017 May 1, 2017

Operational Aspects Included in “lessons learned” section What worked well and what needed extra effort (after initial setup): Sensor damage due to latch-up related events caused a low rate of damaged sensors in the detector over a run. This required that we do repairs in the off times between runs. This was mitigated by having two operational detectors available so that a complete fresh detector was available at all times. A event decoder software problem discovered after the run14 data was analyzed required the re-processing of the run 14 data to achieve the full simulated efficiency. A RDO firmware bug introduced after run 14 lowered the efficiency for run 15. This was discovered at the beginning of run16 and corrected so that the run16 data was not significantly affected. Included in “lessons learned” section LC Vertex Detector Workshop 2017 May 1, 2017

LC Vertex Detector Workshop 2017 Lessons learned LC Vertex Detector Workshop 2017 May 1, 2017

LC Vertex Detector Workshop 2017 Engineering run 2013 3 prototype sectors installed at end of 2013 run. PXL Engineering Run assembly crucial to deal with a number of unexpected issues Engineering run geometry Shorts between power and gnd, or LVDS outputs Adhesive layer extended in both dimensions to increase the portion coming out from underneath the sensors Insulating solder mask added to low mass cables, adhesive extended. Sensor IR picture Flawed ladder dissection: searching for shorts Mechanical interference in the driver boards on the existing design. The sector tube and inner ladder driver board have been redesigned to give a reasonable clearance fit Inner layer design modification: ~ 2.8 cm inner radius Inner layer design After the engineering run added functionality to the MTB: remote setting of LU threshold and ladder power supply voltage + current and voltage monitoring LC Vertex Detector Workshop 2017 May 1, 2017

Good sensors on Outer Layer LU Damage evolution Run Good sensors on Inner Layer Good sensors on Outer Layer Comment installation end of run 2014 100% 82% 95% LU damage, most of it in the first 15 days of operations 2015 99% 94% 98% 96% (93%)* * = Lost control of an outer ladder (10 good sensors off) 2016 95% (87%)+ + = Current instability on inner ladder (8 good sensors off) Good sensor = sensor with >95% active channels and uniform efficiency 2014 2015 2016 LC Vertex Detector Workshop 2017 May 1, 2017

LU damage observables (run 14) Observed increased digital operating currents for inner ladders after over-current protection events (LU threshold = 300mA over operating current) 24-03-2014 24-05-2014 Digital current on the inner ladders during the run 2014 Amps Normal operating current After the first 2 weeks of running we set the LU protection current threshold to be 120 mA above the ladder operating current and the damage rate was very significantly reduced. Sensor damage profiles Inner layer damage: 14% “Bad” inner sensors vs time LC Vertex Detector Workshop 2017 May 1, 2017 Inner layer damage: 14%

Run 14 Damage analysis The sensor development testing program tested LU on full thickness sensors and measured a cross section consistent with the measured LU recoveries recorded on the detector. The damage cross section is too low to easily measure with individual sensors based testing. Post run examination of damaged ladders showed IR “hot spots” giving the location of damage on the sensors. Hot spot showing damage to sensor #2 on run 14 ladder Hot spots were NOT randomly distributed and favored particular locations in the digital section. 6 hot spots this location 5 hot spots this location 50 um thinned silicon Temperatures from 55-100 C Hotspots tend to favor particular structures (isolated buffers with specific structure pitch) LC Vertex Detector Workshop 2017 May 1, 2017

Run 14 Damage analysis Damaged sensors were plasma etched and then examined at the damage locations with a SEM. The damage is clearly visible and appears to show melted silicon in the hot spot locations. Metal layers (stop the plasma etching) Melted silicon LC Vertex Detector Workshop 2017 May 1, 2017

Run 14 Damage analysis Testing at LBNL BASE facility with heavy ions and protons individual sensors both 50um and 700um thick and PXL ladders. Observed current limited LU of ~300 mA in all sensors. Operating current evolution. Threshold is set at ~1.2A here We were able to reproduce the damage on thinned 50um sensors with high flux protons. Despite all attempts with HI and protons, we were unable to damage 700um thick sensors. We conjecture that there are a small number of sites that have high current LUs. In the thick sensors there is enough thermal conductivity to keep the sensors from being damaged with the energy available for a LU event. (Energy from bypass capacitors) LC Vertex Detector Workshop 2017 May 1, 2017

Software/Firmware issues Reconstruction software issue - 2014 data production A bug in the reconstruction software led to an efficiency loss in the reconstructed 2014 Run data, affecting the preliminary STAR results Readout firmware issue - 2015 data, matching inefficiency A subtle bug introduced by a change in the PXL RDO firmware led to an efficiency loss in the 2015 Run data (consequence still under investigation) The extensive tests with pattern data and the performance of full detector calibrations were inadequate to find this problem A fast-offline tracking QA was put in place only after the 2015 Run A post-run investigation based on external sensor illumination with LED allowed for firmware debugging and fixing After fixing the bug, the new data reconstruction and analysis showed a significant improvement in the performance, which now matches the simulation LC Vertex Detector Workshop 2017 May 1, 2017

Conclusions The 3 year physics program of the first MAPS based vertex detector at a collider has been successfully completed and the performance of the PXL detector meets the DCA pointing resolution requirements and has enabled STAR to perform direct topological reconstruction of open charm hadrons. The operational aspects of the PXL detector design have been demonstrated to work well in the RHIC environment despite a low rate of LU induced damage to the sensors. The 2013 Engineering Run was crucial for identifying pre-production problems and allowed us to optimize the designs for the production detectors. As expected for a detector subject to beam-induced damage, the PXL construction phase continued throughout the entire detector life for yearly refurbishment and optimization. The PXL experience demonstrates the difficulty in of tuning readout firmware and reconstruction software in the limited time available in a short duration physics program. LC Vertex Detector Workshop 2017 May 1, 2017

Backup slides LC Vertex Detector Workshop 2017 May 1, 2017

Probe testing Ladders Sectors Detector-Half PXL Production, Assembly and QA Probe testing Delivered: 2 detector copies 40 additional spare ladders for refurbishment 120 high quality ladders Ladders Sectors Production processes: Sensor probe testing Ladder assembly Ladder testing Sector assembly Detector-half assembly Detector-Half LC Vertex Detector Workshop 2017 May 1, 2017

LC Vertex Detector Workshop 2017 Ladder Assembly Precision vacuum chuck fixtures to position sensors by hand Sensors are positioned with butted edges. Acrylic adhesive prevents CTE difference based damage. Weights taken at all assembly steps to track material and as QA. Hybrid cable with carbon fiber stiffener plate on back in position to glue on sensors. Sensor positioning The sensors are manually positioned with butted edges and glued to the carbon backer thanks to an adhesive layer, that prevents damages derived from differen thermal expansion charactieristics Cable reference holes for assembly FR-4 Handler Assembled ladder LC Vertex Detector Workshop 2017 May 1, 2017

From ladders to sectors… to detector halves Ladders are glued on carbon fiber sector tubes in 4 steps Pixel positions on sector are measured and related to tooling balls After touch probe measurements, sectors are tested electrically for damage from metrology Metrology picture Sector assembly fixture A detector half Sector in the metrology setup Detector half Sectors are mounted in dovetail slots on detector half Metrology is done to relate sector tooling balls to each other and to kinematic mounts  Detector half mapped LC Vertex Detector Workshop 2017 May 1, 2017

HFT DCA pointing resolution: ( 10  24/p) m PXL Position Control Sector in the metrology setup Metrology survey 3D pixel positions on sector are measured with touch probe and related to tooling balls Sector tooling ball positions related to kinematic mounts  Detector-half is fully mapped Vibration test through capacitive probe Position stability Vibration at air cooling full flow: ~5 m RMS Stable displacement at full air flow: ~30 m Stable displacement at power on: ~5 m  Global hit position resolution: ~ 6.2 m HFT DCA pointing resolution: ( 10  24/p) m LC Vertex Detector Workshop 2017 May 1, 2017

PXL Installation in STAR Kinematic mounts Novel insertion approach Inserted along rails and locked into a kinematic mount inside the support structure duplicate, truncated PXL support tube with kinematic mounts Insertion in STAR PXL inserted and cabled in STAR LC Vertex Detector Workshop 2017 May 1, 2017

PXL production timeline Delivered: 2014 Run: Primary Detector, 2 aluminum cable inner ladders, rest in copper 2015-2016 Runs: Two Detector copies, all inner ladders in aluminum Sector refurbishment: After each Run for latch-up induced damage After over-powering accident during 2015 Run installation Overall stats # Assembled ladders 146 Installed on sectors 127 Ladder tests ~2000 Primary Detector construction Spare Detector construction Al Inner Ladders + Run14 refurbishment Run15 refurbishment LC Vertex Detector Workshop 2017 May 1, 2017

PXL Parts & Material Budget Curved sensor 40-60% yield after thinning, dicing and probe testing Fully characterized before installation Thinned Sensor 50 mm 0.068% X0 Flex Cable Aluminum-Kapton two 32 mm-thick Al layers 0.128% X0 Copper version  0.232% X0 Carbon fiber supports 125 mm stiffener 250 mm sector tube 0.193% X0 Cooling Air cooling: negligible contribution Total material budget on inner layer: 0.388% X0 (0.492% X0 for the Cu conductor version) Power and signal lines Wire bond encapsulant largest contribution Acrylic adhesive to deal with different CTE HFT DCA pointing resolution: ( 10  24/p) m LC Vertex Detector Workshop 2017 May 1, 2017