ILD & Test Beam DAQs session

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Data Acquisition for an LC Detector Report from the extended ECFA/DESY LC Workshops Cornell, Jul. 15 th.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
ILC Trigger & DAQ Issues - 1 ILC DAQ issues ILC DAQ issues By P. Le Dû
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
Bart Hommels Univeristy of Cambridge EUDET Annual Meeting, Ecole Polytechnique, Paris JRA3: DAQ Overview Objectives System Overview Status of.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
Rémi CORNAT (IN2P3/LLR) - CALICE electronics meeting - LAL, June 2 nd ECAL electronics Rémi CORNAT LLR (CNRS/IN2P3) -Roadmap -Mechanics -LV Power.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Vincent Boudry LLR, École polytechnique CALICE Collaboration meeting U. of Manchester 08/09/2008 Pre-results for the CERN PS tests of the eDHCAL.
CALICE Si-W ECAL (& ILD) power pulsing (cabling) C.Clerc LLR, Ecole polytechnique, Palaiseau R. Cornat P.Mora de Freitas G.Musat J.-F. Roig.
Maurice Goodrick, Bart Hommels EUDET Annual Meeting, Ecole Polytechnique, Paris EUDET DAQ and DIF DAQ overview DIF requirements and functionality.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
1 On- and near-detector DAQ work for the EUDET calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
Vincent Boudry, Ch. de la Taille LLR, École polytechnique LAL, Orsay EUDET Annual meeting DESY, 29/09/2010 CALICE DAQv2.
Vincent Boudry LLR, École polytechnique ILD WS 2010 Couvent des Cordeliers, Paris 27/01/2010 DAQ Status & Developments.
14.4. Readout systems for innovative calorimeters
Toward a DAQ for the DHCAL m³ (in Test Beams)
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
CALICE DAQ Task Force Launch meeting
Final CALICE OsC meeting: Status and summary of project
ILD status report Yasuhiro Sugimoto KEK for the ILD concept group
EUDET Elec/DAQ meeting
CALICE DAQ Developments
Technical Design for the Mu3e Detector
ILD Technical Coordination
Calicoes Calice OnlinE System Frédéric Magniette
Electronics Trigger and DAQ CERN meeting summary.
Integration of CALICE DAQ in common DAQ
AHCAL Beam Interface (BIF)
SiD Calorimeter R&D Collaboration
ALICE – First paper.
FF-LYNX (*): Fast and Flexible Electrical Links for Data Acquisition and Distribution of timing, trigger and control signals in future High Energy Physics.
AIDA DAQ needs (and other issues)
Comments on the DAQv2 advancement
CALICE Meeting Tokyo University, 26/09/2017
Status of Ecal(s) for ILD
Testbeam Timing Issues.
Working for a detector project: A message from AIDA
ILD Background WG Mark Thomson
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
Status of the Data Concentrator Card and the rest of the DAQ
Toward a costing model What next? Technology decision n Schedule
Planning for the Demonstrator
BT2017 Analysis meeting LAL, 30/11/2017
Valeria Bartsch UCL David Decotigny LLR Tao Wu RHUL
The DBD: Outline and Scope
CALICE/EUDET Electronics in 2007
ILD Ichinoseki Meeting
ILD Optimisation: towards 2012 University of Cambridge
CLIC Detector CERN Status + plans
Presentation transcript:

ILD & Test Beam DAQs session Vincent Boudry LLR, École polytechnique ILD WS 2010 27/01/2010

Charge of the meeting Many recent activities ILD LoI last spring; IDAG report last summer → ILD √ Test Beam WS in LAL in november EUDET meeting in december AIDA call for FP7 Near future Preparation of ILD DBD → Plans until 2012 Beyond the LOI Improvement ? Extend toward CLIC ? What is needed for TB (stand alone & combined) could also be seen for ILD as a " small scale repetition" Discussion Mutualisation : HW, SW, protocols, experience Test of technologies ? Vincent.Boudry@in2p3.fr

DAQ for ILD in the LOI LOI summarized in few words 109 channels & 5 Hz * ms bunch trains ⇒ triggerless operation (globally) with local auto-storage & SW filters Data, Computing < LHC Rates estimations Bgd dominated Baseline SiW ECAL + AHCAL Nom.: HCAL 8000 Hits/BX ECAL: 150 Hits/BX TPC: 400 Hits/BX VTX: 3 Hits/cm² (DHCAL: 20) Vincent.Boudry@in2p3.fr

DAQ After the LoI 1. Continue R&Ds on critical components to demonstrate proof of principle. 2. Define a feasible baseline design (options may also be considered). 3. Complete basic mechanical integration of the baseline design accounting for insensitive zones. 4. Develop a realistic simulation model of the baseline design, including faults and limitations. 5. Develop a push-pull mechanism working with relevant groups. 6. Develop a realistic concept of integration with the accelerator including the IR design 7. Simulate and analyse benchmark reactions, which can be updated. 8. Simulate and analyse some reactions at 1 TeV, including realistic higher energy backgrounds demonstrating the detector performance. 9. Develop an improved cost estimate. Near future Preparation of ILD DBD (~ TDR) → Plans until 2012 What is missing in the LOI ? Estimation of rates based on mode detailled set-up ASICs occupancy ASIC Pipeline length Topology Power-Pulsing in 4T field Noise & Calibration data Cost estimate Commons: ASIC communication ? Daisy chain vs I2C vs ... FE communication ? Vincent.Boudry@in2p3.fr

AIDA Successor of EUDET (→ end 2010) and DEVDET († 2009) Infrastructures required for the development of detectors for future particle physics experiments. AIDA targets user communities preparing experiments at a number of key potential future accelerators submitted in december; selection: April/May + 2-3m Negotiations + 3m formal agreemt finalisation by end 2010 A 4 year project (3 years if negotiated) 9 Work packages ⊃ joint research activities (RTD) WP3, task 2 & 3: 3D Interconnection & Shareable IP Blocks for HEP WP8 (Improvement and equipment of irradiation and beam lines) task 6.1: “common DAQ infrastructure”: coord. V. Boudry & D. Haas → toward combined TB (Pixel + Tracking + SiTr + Calos) Synchronisation of systems (HW [Clk & signals], SW) Experience from EUDET Telescope + MANY Vincent.Boudry@in2p3.fr

LCTW09: LC TB WS in LAL (3-5 nov 09) http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=3735 Plans summarized for all LC R&D Talks on DAQ integration: VTX, TPC, Calo + summary D. Decotigny, M. Killenberg, D. Haas, M. WIng → Formalisation in a text ? 1st attempt in AIDA call 1st task = evaluate the situation and needs. Can start today Summary of summary: convergence on HW & SW & data formats TLU2, Beam InterFace, ... EUDAQ, Calice : XDAQ + DOOCS + Tango, Slow Control (⊃ DB) All data storage in LCIO (⊃ RAW) ? check Frank Gaede talk this afternoon in SW session needs a philosophy Interface to the TB facility → recording of conditions Vincent.Boudry@in2p3.fr

Open questions Needed developments for each sub-system (VTX, TPC, SIT, FCALs, CALO, Muons) Expected data rates Any change wrt to LOI ? Example: is Noise included ? Improved estimations ? Needed ? Are we SURE the ASICs memory is sufficient near the beam pipe ? Vincent.Boudry@in2p3.fr

Open questions (2) Technological choices & constraints Time precision needed (clock distribution) Data Concentration topology & technology redundancy of data/config paths ? Ethernet / fibre / custom ? Power distribution & local power storage Power pulsing constraints in a 4T Field Specifications for cables & power route on PCBs Grounding & EMC (ILD & TB) External trigger distribution & handling Fault tolerance use of FPGA or ASICs in FE (DIF)? Local storage of HW configurations → PROM ? Checking of loaded config ? Busy handling (e.g. memory full) Vincent.Boudry@in2p3.fr

Open questions (3) Data format Fully specified ? Common BX identification ? (ILD, TB) Slow Control Data Price of equipment Constraints on the mechanics (vibrations, Power pulsing @ 5Hz, push-pull) Vincent.Boudry@in2p3.fr

Open questions (4) Central DAQ Reconstruction etc: not yet critical but not to be forgotten Price of Farm & storage Load balance: Switches → UDP as a data packet format ? Mapping : Geometry mapping vs. HW configuration Database(s) RAW data format storage : per event / per bunch train ? TPC integration time / recalibration Possibility of analysis for long living particle decay per sub detector ? Vincent.Boudry@in2p3.fr

Cooperation & mutualisation of sub-system equipments philosophy What should be common ? BX ID Data Readout network & protocols ? Stored Data formats ? (e.g. LCIO) What are the minimum criteria ? Vincent.Boudry@in2p3.fr