Façade Management Consulting

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

PRESENTATION ON TURNKEY CONSTRUCTION.
D&C PT Contractor’s Role & Responsibilities Chris M. Harris Contracts Manager, Structural Systems & PTIA Technical Committee.
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Generation Business Line
INTRODUCTION AS PROJECT MANAGEMENT COMPNAY (August 2012)
Process Engineer’s Role in Project Management Dr Abdullah Malik.
BUILD WITH US. ™ Contractors
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Effective Methods for Software and Systems Integration
Copyright © 2010 Accenture All Rights Reserved. 1 Copyright © 2010 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
Technical Control Bureau for Construction SECONED Technical Inspection Service AON Nazomermiddag 08 sept Delft.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Divisional Managers Commitment to the Diagnostic and Unit Rate Study Consultancy Services for Monitoring of Contractors/Consultants Performance And Establishment.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Chapter 8 Construction. Groundbreaking Before the construction begins, a ceremony is often held to recognize the official start of the project. This step,
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
PERSONAL & PROFESSIONAL PROJECT Prepared by : Miss Nadia-ZAID Supervised by : Mr. Smain-JAMAL.
SACPCMP CONSTRUCTION MANGEMENT SUMMIT
Local Points of Contact Webinar
Director’s Progress Review Closeout Meeting
Agenda Item 2: Catch up session 15 May 2017
Installation Procurement Package
Yukon Government 3rd Annual Industry Conference
BIM EXECUTION PLANNING PROCESS
Architecture, Civil Engineer, and Interior Designer
Technical Scope of Work
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
RIBA Plan of Work 2013.
EDR HLRF Work Packages Draft Summary
Temporary Works Co-ordination
ChE 473K Plant Design R. Bruce Eldridge.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The project's conception: A feasibility study is done
NUR 587 STUDY Education Your Life - nur587study.com.
NUR 587 Enthusiastic Studysnaptutorial.com
NUR 587 STUDY Lessons in Excellence-- nur587study.com.
Designers’ Manual Overview and Chapter Contents
Pre-contract Planning and Practice
BIM EXECUTION PLANNING PROCESS
Software Quality Engineering
Management Breakout: MREFC Budget Summary Victor L
Technical Scope of Work
Avoiding Pitfalls with Better Building Envelope Communication
Director’s Progress Review Closeout Meeting
Lesson 1- Operations Management
DTF implementation Roles and responsibilities
PROJECT DELIVERY METHODS
Vacancy – Production Coordinator (Goods In)
Projects and procurement
Executive Team Skill Assessment Worksheet
Lecture 10 PROCUREMENT Ferdinand FASSA.
Projects and procurement
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Quality Control & Assurance
Foundations for the Future
Construction Management Services April 16, 2018
RIBA Plan of Work 2013.
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

Façade Management Consulting Time, Quality, Cost

To manage And Achieve Good façade on Time. A level Above the rest . Through Façade management from Drawings to completion at site . Coordinate the missing link From Papers to site. Cost & variations' control.

Pre Tender Stage

Façade Concept Design from Architectural Drawings. Prequalify vendors & Contractors.

Develop the Wall types as per drawings & detailing. Prepare Tender Drawings, Terms & BOQ.

Façade Engineering

Conduct Wind Load Detailing of the Site. Sun path Analysis for the Façade. Radiation Analysis of the

Develop Appropriate System for the Façade. Thermal Analysis of the profiles & glass. Develop Appropriate System for the Façade. Value Engineer the product.

Post tender stage

Performance Mock-up lab Testing for the system. Shop drawings Evaluation of the Contractors. Performance Mock-up lab Testing for the system. Facade project Management systems

Cleaning & Handover Stage. Cleaning & maintaince systems detailing & Finalization. Cleaning & Handover Stage.

Facade project Management systems

Shop drawings evaluations based on site survey. Develop Site Survey Report once contractor on board. Shop drawings evaluations based on site survey. Develop Materials Procurement & Quality Control Procedure.

Prepare Bar Chart for the project Deadline. Develop a Mockup for Lab testing. Conduct Lab testing & compile its reports. Prepare Bar Chart for the project Deadline.

Visit to vendors factory for necessary inspection Plan Procurement of Raw materials. Visit to vendors factory for necessary inspection (Generate reports library). Factory Inspection of the Contractor on Random basis

Ensure skilled team is on site for efficient Executions. Manpower planning on site with Daily Targets considering the deadline . Ensure skilled team is on site for efficient Executions. Follow up & reports to ensure Timely deliveries.

Detailed Interfacing of Façade with the building structure and other Trades. Study of various Tolerances and standardization of sizes along with Civil works.

Total Quality Program to be ensured on site. Safety Measures on site. Ensure Global Codes Followed for Procurement, Fabrications & Installation.

Awareness of strength and Weakness of all the façade contractors & the Teams . Accessibility to the owner / Top management of all the Façade contracting companies and materials Venders / Processors. Experience of 30 years in Façade industry, India & Abrade.