University of Colorado – Boulder

Slides:



Advertisements
Similar presentations
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Advertisements

Setup/Installation/Operation of an Environmental Control Unit (ECU)
Oxygen Administration R/C MERT Medic Assistant Lesson V.
Stanley DS11 Diamond Saw.
PRESSURE TEST Hook tester up to tank inlet line. Pump tester up to 10psi (.7 bar) The line and carb should hold pressure for 1-min. Checks for leaks at.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
CAFS On-Line Orientation
4/21/2010.  Fertilizer use exploded after WWII  Plants built during the war to supply nitrogen for bombs; after war supplied ammonia for fertilizer.
Open valve 1 so that the flow is from the reservoir to the pump head. Close Valve 4 so flow is stopped. Make sure Valve 2 is open to vent.
Proper Pump Installation Practices
By Dr. Ahmed Mostafa Assist. Prof. of anesthesia and I.C.U.
Pixel Cooling System Modifications C. Newsom December 17, 2009 University of Iowa.
AccuMax Multi-Point Injection Mechanics
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
Hydronic Mechanical Controls
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
HVAC523 Basic Subsystems.
Left side compressor behind Left control box Right side compressor behind Right control box.
Automotive Algebra Maintaining the cooling system Using Algebra for a simple solution Joe Agruso,Xochitl Molina.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
July 29, Update on the HBD Gas System Modifications Robert Pisani Brookhaven National Laboratory.
Hydraulic Symbols. Piping and Tubing Symbols Normal working line Flexible working line Pilot line Drain line Enclosure outline Direction of flow.
NA62 – GTK Cooling Station 1 Main characteristics Fluid: C 6 F 14 (fluorocarbon) Operating temperature: -30 °C ÷ -10°C Temperature precision: ±1 K Temperature.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Flow Controls Controls speed by metering the air into or out of an actuator Fixed Orifice Variable Orifice.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Weekly Coordinator report July 30 th – August 6 th Murphys Law: If anything can go wrong, it will. Eric’s Observation: Catastrophies coming in sequentially,
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
VALVES IN PIPE LINES.
Fixed Orifice Tube Cycling Clutch System (FOTCC)
Fixed Orifice Tube Cycling Clutch System (FOTCC)
HYDRAULIC AND PNUEMATIC ACTUATION SYSTEMS
Fixed Orifice Tube Cycling Clutch System (FOTCC)
14 Refrigerant Recovery, Recycling, and Recharging.
R1 Fundamentals of Refrigeration
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Pixel cooling specifications
Tracker cooling loop “check out” draft for discussion
EVAPORATIVE EMISSION CONTROL SYSTEMS
How to Protect Your Vehicle in Cold Weather
Refrigeration Basics By: Mohamed Iqbal Pallipurath.
Pixel Cooling System Modifications
What are the Common Warning Signs of Faulty Oil Pressure Sensor.
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Way to Flush the Radiator of your Car.
Trouble Shooting Hydraulic System Failure
The BioTector B3500ul TOC analyzer Process Tests
R1 Fundamentals of Refrigeration
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Refrigeration and Air Conditioning
Refrigeration and Air Conditioning
November technical stop activities:
Instructions: Adding refrigerant fluid to system
Tuesday
Click anywhere to get started…
Hydraulic Flow Control • Metering Fluid Flow
Presentation transcript:

University of Colorado – Boulder Pixel cooling Kevin Stenson University of Colorado – Boulder Cooling Meeting – July 3, 2008

Monday On Monday afternoon started opening lines on the pixel detector. All TA valves set to 1.0 (out of 5.0); should be low rate. We see coolant levels in reservoir drop (good sign that air is being removed) After opening about 10 lines, pump can no longer maintain pressure and eventually trips off. Pump was restarted and we finished for the evening but apparently the pump tripped off again Monday night and was restarted Tuesday morning by Carsten.

Tuesday Tuesday morning I observed mostly air in PP0 bypasses and was worried about getting air out before our Wednesday test. Stopped opening lines after 14 of the 18 were open Started increasing TA valve on 2 lines in –z. Was told by Carsten that a setting of 2 or 2.5 would be plenty. Ended at 2.5 for the night. Was told to make sure bypass line stayed above 35% or so to make sure pump could handle job Sasha suggested a valve hidden above the cooling plant was in the wrong position, not allowing air to escape. Wrote an ELOG entry. Sasha also found a big leak on a pressure relief valve on the return line (and fixed it).

Wednesday Some time in the morning Carsten opened the valve allowing air from the return to the reservoir I continued to increase the flow on 2 –z lines to ensure there would not be any bubbles. By 11am they were fully open. Finally around 6pm we got access to PP0. The lines which had been running for 2 days at a TA valve setting of 1–1.6 were still mostly air The lines which were at higher settings appeared to be fully liquid, no bubbles.

Our setup PI Detector valve Flow meter PO PIX-11 (aka PD.2.2.4) Return TA valve 40 m PIX-11 (aka PD.2.2.4) Supply

Strange results from test With valve wide open and no apparent bubbles, pressure gauges jumped between 0 and 1 bar and flow meter jumped between 100 and 120 cc/sec. After closing the detector valve some amount, bubbles appeared in the flow meter (downstream of valve). Pressure gauges settled down some. Tried closing off all lines other than the one we were checking to avoid any interference. No effect on our line. Closing the detector valve results in pressure gauges jumping between 0 and 4 bar. What is going on?!

Questions Exactly what leak tests were done on the pixel system? Do we need to make additional checks? What is the cause of the bubble appearance? What is the cause of the pressure fluctuations? Why is it so difficult to remove air from the lines at rates less than full? How can we check that the air has been removed and there are no bubbles? Put in a transparent section? Put in flow meters? Put in pressure gauges?

Near term plans See if it is possible to safely remove air from the lines (as when the detector is in place)? Perhaps one line at a time, monitoring the pressure? Should we hook up some pressure gauges to the calibrated orifices? After air is removed, turn up pressure and increase flow to do the cleaning part of the test. If it is difficult to remove air, is it possible to keep coolant in the lines when we remove the bypass to insert the detector? Remote readout of the cooling plant Connected to our DCS? Or accessed separately?

What was decided Previous slides were based on what I presented at the cooling meeting. Below is what was decided. Need to understand relationship between pressure regulator (remotely adjustable but currently at 2.5 bar) and the pressure relief valve (mechanically adjustable but value unknown and adjustment procedure unknown). Start up flow on all lines at what we think is nominal flow rate (1.5 on TA valve) Connect pressure gauges on a supply and return line to monitor pressure and presence of air