Mission Concept Status

Slides:



Advertisements
Similar presentations
ESTO Advanced Component Technology 11/17/03 Laser Sounder for Remotely Measuring Atmospheric CO 2 Concentrations GSFC CO 2 Science and Sounder.
Advertisements

CHRIS (Compact High Resolution Imaging Spectrometer) sira group sira electro-optics Dr Mike Cutter EO & Technology Business Manager.
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
PACE SDT Polarimeter Characteristic Discussion Hal Maring, NASA Headquarters Steve Platnick, NASA GSFC PACE SDT Meeting November 2011.
The ICESat-2 Mission: Laser altimetry of ice, clouds and land elevation T. Markus, T. Neumann NASA Goddard Space Flight Center W. Abdalati Earth Science.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Satellite Thermal Remote Sensing of Boiling Springs Lake Jeff Pedelty NASA Goddard Space Flight Center Goddard Center for Astrobiology.
The Systems Engineer’s Role in Project Success J. H Rothenberg May 1, 2006.
Engineering Team (ET) 2 nd NASA PACE SDT Meeting 14 March 2012.
NASA Goddard Space Flight Center Direct Readout Laboratory NPP/JPSS HRD/LRD Status Patrick Coronado NASA Goddard Space Flight Center directreadout.sci.gsfc.nasa.gov/ipopp.
EVM-2 Notice of Partnership Questions and Answers January 23, 2015.
Advanced Spaceborne Thermal Emission and Reflection Radiometer
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Goddard Contractors Association
( ELR) - 1 STEREO - Solar Terrestrial Relations Observatory Mission STEREO SWG STEREO OBSERVATORY Status Edward Reynolds APL STEREO Project Manager.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
U.S. Department of the Interior 1 Landsat Data Continuity Mission Overview Landsat Ground Station Sioux Falls, SD Representative IC Canada Gilmore Creek.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
High Resolution MODIS Ocean Color Fred Patt 1, Bryan Franz 1, Gerhard Meister 2, P. Jeremy Werdell 3 NASA Ocean Biology Processing Group 1 Science Applications.
Path to Mission Concept Review
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
1 Global Tropospheric Winds Sounder (GTWS) Reference Designs Ken Miller, Mitretek Systems January 24, Jan-02.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
SOFIA 2 nd Generation Instrument Plans & Technology Development Paul Hertz SOFIA Program Scientist & SMD Chief Scientist SOFIA Science Steering Committee.
LANDSAT Program Update
GSFC GOES-R Notional End-To-End Architectures Satellite Direct Readout Conference for the Americas December 9 – 13, 2002 Miami, Florida Sandra Alba Cauffman.
1 U.S. Department of the Interior U.S. Geological Survey June 22, 2009 Landsat Data Gap Readiness Plan Briefing to Landsat Science Team Rochester, New.
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Constellation Space Transportation Planning Office July 30, 2009.
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
1 Atmospheric Radiation – Lecture 17 PHY Lecture 17 Satellite instruments and missions.
Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.
What science questions address PACE goals? How would PACE address the science questions? Instrument requirements Mission requirements Strawman instrument.
Decadal Survey Tier 1 Missions Road to Mission Concept review Mary DiJoseph ESM Program Deputy Technical.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
High Resolution MODIS Ocean Color Bryan Franz NASA Ocean Biology Processing Group MODIS Science Team Meeting, 4-6 January 2006, Baltimore, MD.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
7/13/04 Edward Masuoka MODIS Science Team Meeting 1 MODAPS Reprocessing Collections 4 and 5 Ed Masuoka July 13, 2004.
OCEAN COLOR INSTRUMENT (OCI) ON THE PLANKTON, AEROSOL, CLOUD AND OCEAN ECOSYSTEM (PACE) MISSION: CURRENT CONCEPT GERHARD MEISTER PACE INSTRUMENT SCIENTIST.
SOFIA Program Status Bob Meyer January 10, 2010 Program Manager.
The Lodore Falls Hotel, Borrowdale
Environmental and Disaster Monitoring Small Satellite Constellation
I&T&C Organization Chart
GLAST Large Area Telescope:
GEO-CAPE to TEMPO GEO-CAPE mission defined in 2007 Earth Science Decadal Survey Provide high temporal & spatial resolution observations from geostationary.
USGS Status Frank Kelly, USGS EROS CEOS Plenary 2017 Agenda Item #4.14
Current SOC-Ground System Integration Schedule (Jan )
Landsat Program The World’s Most Sophisticated Optical Observatories of the Earth The World’s Model for International Collaboration in Earth Observation.
SDO Flight Dynamics Subsystem
Management Breakout: MREFC Budget Summary Victor L
Systems Engineering Management
By Jeff Burklo, Director
USGS Agency Status Landsat Operations Jenn Lacey 21 July 2016
Launch and On-orbit Checkout
Recent activities of OCR-VC
March ’05 Face to Face Meeting Introduction
USGS Status Steve Labahn, USGS EROS CEOS LSI-VC-7 Agenda Item 8.0
Integration & Test Instrument Operations Coordination
USGS Status Jenn Lacey, USGS CEOS Plenary 2019 Agenda Item #: 3.6
Presentation transcript:

Mission Concept Status PACE Mission Concept Status April 6, 2016 Goddard Contractors Associations

Mission Overview & Top Level Schedule Science Objectives The PACE mission will make global ocean color measurements for ocean ecology and global biogeochemistry along with polarimetery measurements on clouds and aerosols Mission Concept 98° inclination; ~675 km altitude; sun sync Sun-Synchronous (1pm MLT AN), 2 day global coverage Design to Cost Mission $805M with $100 Million for HQ Science 65% JCL required at KDP-C Class C Mission Launch Readiness Date August 2022 3 years Phase E (after commissioning) 10 years fuel Schedule Instrument(s) CDR Observatory I&T Spacecraft CDR Launch Spacecraft ATP Phase A Decommission CY16 CY17 CY18 CY19 CY20 CY21 CY22 CY23 CY24 CY25 CY26 GCA PACE 4/6/2016

Mission Operations Center (GSFC) Mission Operations Center (GSFC) System Architecture TDRSS Command/Telemetry GPS Space Segment PACE Launch Segment Mission Data Ocean Biology DAAC (ESDIS Funded) Atmospheres DAAC (ESDIS Funded) CLASS VAFB Command / Telemetry Science Processing Mission Operations Center (GSFC) Science Data Segment (GSFC) Science Operations Science Software White Sands Complex Data Delivery Data Delivery Instrument Calibration Science Validation Ground Segment DQM Processing Processing Mission Operations Center (GSFC) Science Data Segment Program Science External Elements Data Management Data Management Fairbanks Primary T&C, SMD Reception Punta Arenas Primary T&C, SMD Reception Svalbard Primary T&C, SMD Reception White Sands Alternate T&C, SMD Reception TrollSat Alternate T&C, SMD Reception Vicarious Calibration System Ingest Ingest PACE ROSES Science Team Research Community GCA PACE 4/6/2016

PACE Project Organization PACE Project Manager A. Dress Project Scientist J. Werdell Deputy Proj. Scientist (Ocean) A. Mannino Deputy Proj. Sci. (Atmosphere) B. Cairns 670 Deputy Project Manager K. McIntyre Deputy Project Manager / Resources W. Sluder 210 Contracting Officer TBD 427 427 Financial Manager M. Gosselin Chief Safety and Mission Assurance Officer J. Blackwood 324 Mission Systems Engineer T. Feild 599 Resource Analyst C. Greco Vacant Systems Engineer A. Matuszeski Earned Value Management Vacant Launch Vehicle Manager J. Satrom Mission & Ground Operations Manager R. Schweiss 427 Sr. Project Support Manager K. Opperhauser General Business P. Blackwood 490.5 427 427 Schedule Management W. Paradis / Vacant OCI Project Mgr. R. Estep OCI Deputy PM M. Hill/P. Nguyen Polarimeter Instrument Manager T. Dixon Observatory Manager B. Weinstein I & T Manager TBD Configuration / Data Management L. Sullivan / TBD Video Imaging & Photo. Rqmnts Vacant Information Technology Vacant GCA PACE 4/6/2016

Formulation Direction GCA PACE 4/6/2016

PACE Mission Direction PACE Mission was direct to GSFC via letter of direction from HQ on December 10, 2014 PACE Kick off meeting held on January 13, 2015 Mission defined as a Design to Cost development Project allocated $705M for management, instruments, spacecraft, launch vehicle, and operations HQ managed science allocated $100M for science, data processing and science systems GCA PACE 4/6/2016

Establishing Mission Requirements The Design to Cost (DTC) process dictates that the requirements are part of the trade process The Science Definition Team (SDT) Report provides a set of objectives to be evaluated by the project HQ provided a set of threshold requirements At this phase of the mission, no agreed to baseline requirements have been established (per DTC process) Notional baseline requirements have been established for the preferred mission concept and cost The project uses the DTC process to determine what set of baseline requirements are achievable within the $705M budget and at the 65% cost confidence This process will continue in Phase A and Phase B and be codified at KDP C. GCA PACE 4/6/2016

Design to cost process GCA PACE 4/6/2016

Design-To-Cost puts the Requirements in the Trade Space Science (capability) and engineering requirements are part of the trade space System total cost is a requirement and cannot be traded Goal is to maximize the science capability at a high cost confidence throughout the life cycle (minimum of 65% is required) At the mission gates, a well formulated single mission concept is planned to be recommended GCA PACE 4/6/2016

Each Capability & Element has a Trade to be Evaluated Mission Elements: Spacecraft Instruments Launch Vehicle MOC Operations Science Engineering Management Mission Assurance Schedule Science Capability Risk Cost Technical GCA PACE 4/6/2016

Pre-phase A Trades GCA PACE 4/6/2016

ESD Program Science Priorities Defined Global Ocean Color, Clouds and Aerosols Science Needs to be fully compliant with threshold requirements Enhanced Clouds and Aerosols Science Maximized capability at lowest cost Coastal Ocean Science* Approximately 100 meter spatial resolution Direct Broadcast of Science Data* Requires an additional COMM (X-Band) service * Pre-Phase A analysis shows that additional resources are needed to provide these capabilities in order to stay in within the 65% cost confidence GCA PACE 4/6/2016

Pre-Phase A Activities The project performed Pre-Phase A trade studies, and as a part of the Design to Cost Process, narrowed the focus of the number of studies through an iterative process The Project held a two day Concept Decision Point (CDP) review on October 21st & 22nd with the following goals: Opportunity for an early look at the concepts developed by the Project Determine if a enough data has been collected to recommend an appropriate direction Held a successful GSFC Technical Management & Cost (TMC) Review on Dec. 8-9th with the goal of assessing the following: Technical concepts, schedules and cost Held a successful Mission Concept Review (MCR) on March 8-10th Presented the mission concept with focus on the project recommendations GCA PACE 4/6/2016

Mission Trades Performed Across All Elements PACE Mission Studies Spacecraft Ocean Color Instrument Polarimeter Launch Vehicle With MOC/OPS Vendor Provided Hyper-Spectral Pushbroom 250-1000m Sequential 3MI LSP Standard Delivery In Orbit Temporal Modulation JPL PSMPI LSP Rideshare Multiband Scanner 250-1000m GSFC Provided Spectral Modulation Dutch SPEX Delivery In Orbit w/ S/C Hyper-Spectral Scanner 350-1000m MMS Concept Amplitude Splitting Commercial Service Provider Coastal Camera ≤ 100m LRO Concept Dutch ASPIM Unique Concept UMBC HARPP GCA PACE 4/6/2016

Concept Meets Most of the SDT Objectives & All Threshold Capabilities SDT report has been evaluated and the recommended mission concept meets all but the following SDT objectives: 250-500 meter Ground Spatial Distance (GSD) Direct Broadcast Service 5 year mission life Threshold capabilities have been evaluated and the recommended concepts meet or exceed all required capabilities: Phase A science and engineering studies will be performed to determine what additional capabilities can be provided within the 65% cost confidence (i.e.*): GSD Determination & Orbital Altitude Signal to Noise Allocations Additional UV and SWIR Bands Selective Redundancy Detector trades for SWIR Channels Direct broadcast * Not the complete list additional trades GCA PACE 4/6/2016

PACE Mission Schedule GCA PACE 4/6/2016

KDP A planned for June 16th Plans Forward KDP A planned for June 16th Acquisition Strategy Meeting ~ 1 month after KDP A Mission Requirements Reviews planned for the Fall of 2016 GCA PACE 4/6/2016