Procedure for MCM rework on tray MID 070

Slides:



Advertisements
Similar presentations
SPACE PRODUCT ASSURANCE
Advertisements

Single-Balanced Mixer Assembly Instructions Revision 2 Updated 5/7/2012.
Assembly / Disassembly / Reassembly Computers. Chapter Objectives After completing this chapter you will: Understand how static electricity can damage.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #06 Gateway To Space ASEN / ASTR 2500 Class #06.
Installation. Indoor Unit Installation Typical Installation.
1 Tire repair procedures This presentation has been prepared from copyrighted materials from REMA TIP TOP / North America and is reproduced with their.
Installing Cable Floor Heating Systems This presentation will give you a practical idea of how to install a floor heating system.
C OINS The coin operated binocular / telescope can accept most, though not all,coins into the coin chute. It can be program easily by yourself or you can.
One Way Circuits Limited Printed Circuit Board Manufacturer A Guide To Manufacturing Multilayer PCBs Use Left and Right Cursor keys to navigate ESC to.
Colorado Space Grant Consortium Timing Circuit HW #4 Class #07 Timing Circuit HW #4 Class #07.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
1 Student Hands On Training I (2009) Soldering 101.
Status and outlook of the Medipix3 TSV project
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
LSU 09/12/2013Electronics - SkeeterSat1 Building SkeeterSat Inventory Components  Identify components Use the parts list and assembly manual  Tape to.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
Dayview™ LCD Film – Installation Procedures. Equipment Required : Latex gloves and face mask Glue cleaner (alcohol) & glass cleaner Special glue, spray.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
TRIO-CINEMA 1 UCB, 2/08/2010 Solar Array Kevin Jenkins Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
1 Getting a Sample to Test your Board!. 2 Step 1: Opening the detector housing Open the detector housing and remove the lid.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
LSU 08/11/2004Electronics 41 Assembly Techniques Electronics Unit – Lecture 4 Component Preparation Component Placement and Soldering Inspection Activity.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Revised: December 11, 2015 © 2015 FARO LM-06REF pptx Upgrade Bumpers on Safety Yokes for FARO Focus 3D.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
Conformal Coat Quality issues Update of November 3, 2004.
Product Focus: Using the Light Hatch to reduce time, costs and risk.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Berkeley status Aug 10th, 2012.
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Ladder Assembly All tools and jigs produced Glue dispensing works
Mini-Tower test results
Gluing jigs for Demonstrator
Open Issues Modification of Cactus Arm bending tool required
Soldering process 1 Add the soldering material on the soldering pad of speaker in order to solder the wire on the speaker.
Investigation on tray MID 063 Back
Controller Rework.
Preproduction Status & Results
GLAST Large Area Telescope:
Mechanical Dimensions
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
Nikhef/Bonn LepCol meeting
GLAST Large Area Telescope:
The encapsulation problem of the LAT heavy trays
Protective Grounding Three Phase Tangent
C 4 Insulator Changeout With Hoists
GLAST Large Area Telescope:
C3 Insulator Changeout With Jib
Line Down Single phase © 2018 Iowa Association of Electric Cooperatives.
A1 to A6 Conversion Tangent to Double Dead End
A5 Insulator Change Transformer Pole
Wye/Delta 120/240 4 wire Transformer Bank
C1 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives.
Mechanical Dimensions
IPC Compliance Testing (DPA) Methodology
Presentation transcript:

Procedure for MCM rework on tray MID 070 Gamma-ray Large Area Space Telescope Procedure for MCM rework on tray MID 070 See NCR INFN-PI 385 Major

Description of the nonconformance Description of nonconformance: All the 64 channels of one Front-end chip are always over threshold. Relevant NCR: Refer to NCR 385 major. Impact (if no action is taken): 64 contiguous channels on one silicon layer are lost. Root cause: Very likely due to a resistor on the MCM board (R111) found to be broken during the optical inspection.

Preparation I 1 2 Remove the handles from the tray box. Remove the top cover of the tray box. Remove the two covers for the connector savers on the box closeout in correspondence of the MCM to be reworked. Remove the box closeout in correspondence of the MCM to be reworked. 3 4 5 All the process shall take place in class 100.000 clean room. Standard ESD procedures shall be observed at each step of the rework process. Tray box shall be grounded through the ESD bonding point.

Preparation II Approximate location of the broken resistor. The MCM is easily accessible for rework without removing the tray from its box. This reduces the risk of damage to the tray itself induced by accidental mishandling.

Removal of the broken resistor Location of the broken resistor (R111) - a non flight MCM is shown in the picture for reference. Hole for PCB fixing screw. Remove the conformal coating over the resistor – Unsolder the resistor with an ESD soldering tool- during this step precautions should be taken as to avoid accidental damage of silicon detectors induced by soldering material. Remove further residuals of conformal coating (if any) debonded during the process. Clean the surface close to the location of the resistor with isopropanol.

Installation of the new resistor Install the new resistor in place Close the tray box. Perform a comprehensive electrical test on both faces of the tray. Open the tray box again – as described before – and reinstall the top cover; this leaves the MCM accessible from the outside minimizing the exposed area. Put the tray box in a vertical position . Encapsulate the new resistor using NUSIL CV15-2500 (already used for the encapsulation of the wire bonds) and wait for the glue to cure with the tray box still in a vertical position. Remove the top cover and close the box. Perform the final electrical test on both faces.