S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016

Slides:



Advertisements
Similar presentations
Protection study options for HQ01e-3 Tiina Salmi QXF meeting, 27 Nov 2012.
Advertisements

Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Chapter 7 SYSTEM PROTECTION
TEV DUMP SWITCH FAILURES OF 2/10/09 Dan Wolff/EE Support.
Test Result overview: Timeline, highlights and challenges H. Bajas TE-MSC-TF.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IR Quad Heaters.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
HFM High Field Model, EuCARD WP7 review, 20/1/2011, Philippe Fazilleau, 1/16 EuCARD-WP7-HFM Dipole Conceptual Review Nb 3 Sn dipole protection Philippe.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
MICE Power Supply System John Joseph LBNL Spectrometer Solenoid Controls & Monitoring Review Dec 11 th 2012.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
FRESCA II dipole review, 28/ 03/2012, Ph. Fazilleau, M. Durante, 1/19 FRESCA II Dipole review March 28 th, CERN Magnet protection Protection studies.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
Study of the HTS Insert Quench Protection M. Sorbi and A. Stenvall 1 HFM-EuCARD, ESAC meeting, WP 7.4.1CEA Saclay 28 feb. 2013,
Sextupole Single Coil Test Results Giovanni Volpini on behalf of the LASA Team Giovanni Volpini, CERN, 22 April 2015.
MICE Spectrometer Solenoid (Pre-) Review Initial Impressions Jim Kerby (ANL) RAL, Oct 27, 2015 On behalf (but not checking) of Tom Taylor (CERN, ret.),
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Proposed Power Supplies for Cryogenic Magnets for PIP II Bruce Hanna June 21, 2016.
Inner Triplet Protection Strategy LHC & HL-LHC Daniel Wollmann with Inputs from B. Auchmann, G. Ambrosio, R. Denz, P. Fessia, E. Ravaioli, F. Rodrigues.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
MICE Spectrometer Solenoids Step IV running
S A Griffiths CM42 June 2015 Electrical & Control.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Electrical Configuration and System Protection
Power Supply and Energy Extraction System for the CBM magnet
Considerations from machine protection and the ELQA teams
D1 and D2 powering and protection
11T Magnet Test Plan Guram Chlachidze
MQY-30 Test Result Report
Quench Simulation at GSI
AEGIS Magnet System.
Superconducting Circuits, a generic view
Spectrometer Solenoid Update
Quench protection of the MAGIX high-order correctors
Focus Coil Quench Detector
Quench Protection Measurements & Analysis
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Power Supply and Energy Extraction System for the CBM magnet
Machine Protection Xu Hongliang.
COOLING OF POWER DEVICES
Hilumi WP3 meeting, 1 October 2014
MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.
Quench calculations of the CBM magnet
Nb3Sn QPS strategies How to protect.
Other arguments to train two sectors to 7 TeV
ECR on pole order of the HL-LHC IT circuit and resulting implications
Power Leads for Test Stands
Electrical integrity of magnets and coils
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016 SS QPS S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016) Outline Status of SS electrical circuits Operational Requirements Modified magnet protection scheme and operation of the Power Supplies Conclusions June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Status of SS Electrical Circuit SSD Known Damage: LTS lead between the HTS lead and the M1 coil is open Internal diode pack connection is open for M1 At one side of the M1 LTS lead is shorted to ground The two LTS leads for M1 are connected to each other; finite resistance M2 coil is connected to M1 coil therefore connected to ground with ~ 1.3 kΩ resistance Possible Future Degradations: M2 ground connection becomes more solid; less resistance Physical damage to M2 is worse than we currently believe He-to-Vacuum leak occurs at M1/M2 feedthrough (between the cold mass and insulating vacuum) SSU No Known Issues June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Status of SSD Electrical Circuit Cold Mass Shell LTSd LTSa LTSb HTS R1 LTSc LTS/N PSU External Diode Pack Internal Diode Pack M1 R1 R2 Energy Absorber LTSc LTS/N HTS LTSa LTSb LTSd Feedthroughs LTSd LTSa LTSb HTS R1 LTSc LTS/N PSU External Diode Pack Internal Diode Pack M2 R1 R2 Energy Absorber LTSc LTS/N HTS LTSa LTSb LTSd Vacuum Shell June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Operational Requirements By design: Powering Current measurement accuracy 2x10-4 (new transductors being installed) Fail safe powering; no harm to equipment (Magnet, leads, PS itself) and personnel Magnet circuit protection Coils are self protected; if the coil quenches it is sufficient to turn off the PS HTS and LTS leads during quench: keep the hot spot temperature below 300 K Coils hot spot temperature during quench less then 120 K Magnet peak voltage relative to ground below 1600 V; for ECE circuit internal diode pack is needed to fulfill this requirement June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Operational Requirements Practical reasons: Safe cold HV withstand to ground values measured for SSU and SSD were ~ 150 V ( breaks down ~ 200 V) Localized at the feedthrough (air-to-vacuum) region HTS lead voltage less than 3 mV QPS HTS lead quench detection threshold value is set at 1 mV Keep the LTS lead voltages during quench as low as possible Apply low detection threshold values to keep the hot spot temperature as low as possible No clear understanding (as built) what are the lead dimensions and/or cooling conditions, consequently quench integral value limits are not known. June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016) QP Modifications Existing QPS was reconfigured: Introduced dI/dt signals for all the magnet currents Every magnet current is measured with transductors The dI/dt signal is obtained with digital signal processing of the magnet current signal Quench detection of the M1 and M2 magnets are using Wcoil – const * dI/dt signals with low threshold values; the goal is to be at least less than 100 mV Separate protection processor is used for LTS and HTS leads/magnet circuit Second FPGA card provides additional trigger to open the external diode packs for each magnet circuit separately June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016) Coil Protection SSU M1 and M2 is using Wcoil – const * dI/dt signals E1-C-E2 is using Half – Half bucked half coil signals SSD M2 is using Wcoil – const * dI/dt signals June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

PS system Modifications Redundant contactors were implemented for the main switches that open when quench is detected External diode packs, dump resistors and additional contactors were procured and installed June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016) END June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016) Protection Issues Cold Mass Shell LTSd LTSa LTSb HTS R1 LTSc LTS/N PSU External Diode Pack Internal Diode Pack Feedthroughs R1 R2 Energy Absorber LTSc LTS/N HTS LTSa LTSb LTSd Vacuum Shell Direct protection of LTSa and LTSb segments with V-taps LTSd is only protected with the magnet; low threshold settings are required to lower the hot spot temperature LTS/N easily can be overheated Internal diode/resistor pack does not extract enough energy June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Proposed Operational Configuration Cold Mass Shell LTSd LTSa LTSb HTS R1 LTSc LTS/N PSU External Diode Pack Internal Diode Pack Feedthroughs R1 R2 Energy Absorber LTSc LTS/N HTS LTSa LTSb LTSd Vacuum Shell Carefully selected External diode pack (M1 and M2 ~ 5 V, for ECE ~ 10 V), and R2 (0.5 Ω) Contactor for the External diode pack is open; not to interfere with PS operation June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Different Quench and Failure Scenarios Cold Mass Shell LTSd LTSa LTSb HTS R1 LTSc LTS/N PSU External Diode Pack Internal Diode Pack Feedthroughs R1 R2 Energy Absorber LTSc LTS/N HTS LTSa LTSb LTSd Vacuum Shell Magnet quench HTS lead quench LTSa or LTSb quench LTSd quench Ground fault PS malfunction June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016) Magnet Quench Cold Mass Shell LTSd LTSa LTSb HTS R1 LTSc LTS/N PSU External Diode Pack Internal Diode Pack Feedthroughs R1 R2 Energy Absorber LTSc LTS/N HTS LTSa LTSb LTSd Vacuum Shell Magnet quench is detected PS Contactors open for all circuits: M1 (for SSD M1 is floating), M2, ECE External diode pack contactors close Diode Pack is sized to keep the internal diode pack open (M1 and M2 ~ 5 V, for ECE ~ 10 V); current is circulated through the external diode pack During magnet quench HTS or LTSa or LTSb quench occurs External diode pack contactor opens for the particular circuit R2 resistor is sized (0.5 Ω) to keep the max voltage below 150 V in a case LTSc or LTS/N opens Ground fault occurs during quench No additional action – no influence on maximum external voltage June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

HTS or LTSa or LTSb Quenches Cold Mass Shell LTSd LTSa LTSb HTS R1 LTSc LTS/N PSU External Diode Pack Internal Diode Pack Feedthroughs R1 R2 Energy Absorber LTSc LTS/N HTS LTSa LTSb LTSd Vacuum Shell HTS or LTSa or LTSb quench is detected PS Contactors open for all circuits: M1 (for SSD M1 is floating), M2, ECE External diode pack contactor remain open for the quenching circuit the rest of them will be closed – this requires major modifications of the QPS; more channels needed R2 resistor is sized to keep the max voltage below 150 V in case LTSc or LTS/N opens During HTS or LTSa or LTSb quench the magnet also quenches No additional action – the current decay will be faster Ground fault occurs during quench No additional action – no influence on maximum external voltage June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016) LTSd Quenches Cold Mass Shell LTSd LTSa LTSb HTS R1 LTSc LTS/N PSU External Diode Pack Internal Diode Pack Feedthroughs R1 R2 Energy Absorber LTSc LTS/N HTS LTSa LTSb LTSd Vacuum Shell LTSd quench is detected This quench can not be separated from a magnet quench – very low quench detection threshold is required; dI/dt based quench detection system for M1 & M2 and significantly lower threshold for the ECE half coil based detection system (more filtering) are needed PS Contactors open for all circuits: M1 (for SSD M1 is floating), M2, ECE External diode pack contactor remain open for the quenching circuit the rest of them will be closed – R2 resistor is sized to keep the max voltage below 150 V in case LTSc or LTS/N opens During LTSd quench the magnet also quenches No additional action – the current decay will be faster Ground fault occurs during quench No additional action – no influence on the maximum external voltage June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Ground Fault or PS Malfunction Cold Mass Shell LTSd LTSa LTSb HTS R1 LTSc LTS/N PSU External Diode Pack Internal Diode Pack Feedthroughs R1 R2 Energy Absorber LTSc LTS/N HTS LTSa LTSb LTSd Vacuum Shell Ground fault or PS malfunction PS Contactors open for all circuits: M1 (for SSD M1 is floating), M2, ECE External diode pack contactors close Diode Pack is sized to keep the internal diode pack closed (M1 and M2 ~ 5 V, for ECE ~ 10 V); current is circulated through the external diode pack During ground fault or PS malfunction HTS or LTSa or LTSb or LTSd quench occurs External diode pack contactor opens for the particular circuit R2 resistor is sized (0.5 Ω) to keep the max voltage below 150 V in a case LTSc or LTS/N opens June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

New SSD QPS Configuration For the newly designed SSD cold mass we will implement several changes: Every coil will have two center V-taps (one primary and one redundant) All coils detection circuit will utilize Half Coil 1 – Half coil 2 signal with low threshold values There will be separate V-taps for the LTS and HTS segments At every V-tap locations will be two V-taps (one primary and one redundant) External dump system will be used Dump resistor will be adjusted to the HV withstand values Every coil will have two heaters (one primary and one redundant) Once LTS, HTS or magnet quench is detected the heaters will be energized to initiate a magnet quench For ground fault and PS failure cases slow ramp down will be initiated External diode pack will be used June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)

Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016) Conclusions The proposed PS and QPS configuration will minimize the risk of loosing the magnet circuits Requires major modifications of the QPS June 28, 2016 Sandor Feher | MICE Magnet Rediness Review (Ral, June 28, 2016)