WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

SLIDE 1 AEMO INDEPENDENT ASSESSMENT OF NSW & TAS NETWORKS July 2014 PRESENTED BY NATIONAL PLANNING.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Final Report on Improvements to the RAA Steve Metalitz 5 December 2010.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
2014 Reports to the Minister Markets Team Ken Michael Room, 25 September 2014 Ensuring quality services for a reasonable price 1 Workshop.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Consumer/stakeholder forum – No 4 8 August 2014.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Market Evolution Program. 2 Topics Overview of the Market Evolution Program Consultation Plan for Phase 1 Overview of the Market Evolution Program Consultation.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016.
SLIDE 1 FCAS CAUSER PAYS: STAGE 1 DISPUTE MEETING BACKGROUND 15 MARCH 2016 PRESENTED BY LOUISE THOMSON.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Power of Choice (PoC) Program Overview
Power of choice – embedded networks information session
Power of choice executive forum
Causer Pays Workshop 20 March 2017.
Broken Hill Solar Plant
New transparency guidelines
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Status of the Planning Working Group’s (PWG) Efforts
EU Implementation Programme
Review of System Alerts
ESB Networks AIP Programme
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
PROGRAM CONSULTATIVE FORUM Meeting pack
Transmission Planning Code
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
UK Link Technology Refresh
Allocation of Unidentified Gas Statement - Update
Intervention pricing working group
Five-Minute Settlement Program: Executive Forum 1
Harmonisation Working Group Update on Harmonisation Project
Update on European Network Codes
GTAC Workshop Block 5 19 September 2018.
Revised engagement approach for draft GTAC
Five-Minute Settlement Program: Executive Forum 2
Changes to Reserve Level Declaration Guidelines
Update to Unit Under Test Process
Exit Capacity Substitution and Revision
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
Draft Capacity & Connection Plan
Update on Exit Capacity Substitution and Revision
Five-Minute Settlement Program: Program Consultative Forum 6
Summary Issue Modification Aim Effect of the mod Impacts
EU Developments.
Generic Revenue Driver Methodology
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Timeline Overview Planned Timescales
Market Pricing Initiatives Update September 9th, 2003
Energy Storage Roadmap & Flexibility Roadmap Information Session
EU CAM Network Code and CMP Guideline Proposal Update
Customer Issue Management Dashboard CoMC
Presentation transcript:

WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon

SESSION OVERVIEW Status of Consultation Process Local Limit and Wind Speed Changes Extreme Wind Cut-out / Other Cut-out “Possible Power” / “Estimated Power” Proposal Next Steps

Current STATUS of Consultation Process Stage Date Issues Paper 18 March 2016 First stage submissions 27 May 2016 Draft Report 2 August 2016 Second stage submissions 25 August 2016 Final report due (currently) 7 October 2016 Draft Report stated Local Limit and Wind Speed minor amendments “Possible Power” excluded Extreme-wind cut-out SCADA proposed Strong participant feedback in second stage raised question whether AEMO should extend consultation to include new functionality – discussed in following slides

Local Limit and Wind Speed Local Limit SCADA signal resolved Small amendments following second stage consultation AEMO working on distribution network limit constraint equations Wind Speed SCADA signal definition resolved

Turbine cut-ouT Draft report proposed new “Extreme wind cut-out” SCADA To improve accuracy of AWEFS dispatch forecast when wind farm constrained during extreme wind events Feedback in submissions: May be expensive or difficult for some farms Many causes for cut-out or reduced production Ideas for a signal to allow AWEFS to model more of this behaviour more accurately in dispatch? Turbines ready-to-run in next 5 minutes? Share of capacity ready-to-run in next 5 minutes? AEMO needs some signal to represent what’s happening in times of cut-out

“Estimated Power” proposal Substantial participant feedback in second stage “Estimated Power” name to avoid confusion with existing “Possible Power” in control systems Participants keen to provide a signal to incorporate all factors affecting wind farm operation, including: Wind speed / direction at each turbine Effects of high wind speed, extreme wind direction change, site temperature, wind sector management Dynamic effects of turbine pausing and feathering

“Estimated Power” proposal AEMO would analyse the accuracy of trial data supplied by participants – we need to work with you AEMO would concurrently consult with participants Regular reporting back with full transparency on outcomes If it meets requirements for system security and market outcomes, should we then implement “Estimated Power”? If it doesn’t meet requirements, should we then require the high- wind cut-out signal or an alternative cut-out signal? Post-implementation AEMO would continue to measure performance and assess reliability

Proposed “Estimated Power” Definition Optional SCADA signal The Generator’s forecast of active power at the end of the next dispatch interval Subject only to technical factors affecting operation of its generation and connection assets Calculated assuming no distribution or transmission network constraints apply to the next dispatch interval

“Estimated Power” proposal Q: How much detail to put in the definition? Q: Overlap with the “Local Limit”? Q: Useful for your farm, or too complex? Q: Also for solar farms?

Next Steps for current consultation Next report published 14 Oct 2016 A week delayed to incorporate the complexity of the issues raised in the second stage submissions and discussions. Two Options: 1 – End consultation now, with “Estimated Power” not in ECM Guidelines 2 – Third round of consultation, to propose “Estimated Power” in ECM Guidelines

Next Steps for current consultation “Estimated Power” accuracy assessment Accuracy assessment can start now using SCADA and historical data under Option 1 or 2 Local Limit Option 1: Implementation work can commence from October Option 2: Implementation delayed, though background work will minimise delay “Estimated Power” Option 1: New full consultation would be required to put “Estimated Power” into ECM Guidelines – minimum 4 months Option 2: Could allow proposals with respect to “Estimated Power” to be implemented without new full consultation Question: Which option is preferred?

Next Steps for current consultation Timeline if a third stage of consultation was undertaken Stage Date AEMO second draft report published 14 October 2016 Third stage stakeholder submissions due 4 November 2016 AEMO final consultation report published 9 December 2016

Additional consultation and investigation underway/proposed Power curve tuning AEMO has been working with AWEFS vendor to improve the power curve tuning algorithm Design improvements in final stage of negotiation Scoping of a full review of AWEFS Continuing investigation into accuracy improvements to AWEFS other than Estimated Power Transparency and Bidding of Availability