John Seeman (SLAC) for SBSC

Slides:



Advertisements
Similar presentations
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Advertisements

Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
John Osborne GS/SE March 2013
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Agenda : CLIC Civil Engineering and Services (CES) WG.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Survey Meeting John Osborne, CERN 8 February 2016
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
Civil Engineering for FCC-eh and LHeC
Continuous Improvement Project (A Guideline For Sponsors)
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
News and Introduction from CERN June 15th, 2005
SUPERB SITE OVERVIEW C. Sanelli, F. Sgamma, S. Tomassini, INFN-LNF
SUPERB site status report for layout v12
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
WP13: Access to Plasma Beam testing facilities
LCWS11 AWG9 PARALLEL SESSION SUMMARY
CLIC Civil Engineering & Infrastructure
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
5th FCC Infrastructure & Operation meeting
Spectrometer Solenoid Update
EuroTeV WP7 activities in DESY
Latest ILC tunnel cross section May 2017
(Potential) Site and Utilities
SuperB Injection, RF stations, Vibration and Operations
Collaboration New collaborators in 2016:
Renovation of the 45-year old PS magnets
Detector hall in mountain regions
CLIC-ILC BDS & MDI work.
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
3rd Workshop on SuperB SLAC June , 2006
RDR Baseline Layouts for Interaction Region
X-DIS/XBRL Phase 2 Kick-Off
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Intended IG Objectives] Date Submitted:
Presentation transcript:

John Seeman (SLAC) for SBSC Elba Report on SuperB Site Review Committee (SBSC) Meeting Frascati 18-19th April 2011 John Seeman (SLAC) for SBSC May 30, 2011

SBSC members John Osborne (Chairman) john.andrew.osborne@cern.ch CERN Civil Engineer, mostly underground experience, LHC, CLIC, ILC Philippe Eymard philippe.eymard@synchrotron-soleil.fr Building group, tunnels Wilhelm Bialowons wilhelm.bialowons@desy.de Physicist and technical, vibration measurements, ILC Alfredo Fulgenzi alfredo.fulgenzi@lngs.infn.it Electrical engineer, at LNGS since 1987, LV & HV Gaetano Schillaci schillaci@lns.infn.it Mechanical and civil construction, 15 years at INS Franco Gerardi franco.gerardi@cnao.it Nuclear Engineer. PM, foundations and structures John Seeman Seeman@slac.Stanford.edu SLAC PEP2, member of Super B team

SBSC initial mandate SuperB - Site Advisory Committee (SBSC) Kick Off Meeting 17 February 2011   Mandate : The initial task of the Site Advisory Committee (SBSC) is to review the document “Site Requirements Evaluation for the SuperB collider and Synchrotron Light Facility Project” , dated 12 January 2011. Once reviewed, this committee will give recommendations on what site criteria should be analyzed to assist in the site selection process. Where possible, this committee will recommend parameters against each criterion. The mandate for any subsequent phases will be defined after the completion of Phase one.

All SBSC documents will be uploaded on Indico site http://agenda.infn.it/categoryDisplay.py?categId=53

SBSC comments on “Siting Document” The committee was very impressed with the quality of the ‘Siting Document’ SBSC had two EVO meetings to review the Site Requirements document SBSC comments formally submitted to SuperB via M. Giorgi on 9th March 2011 Feedback document from SuperB received 18th April. During the visit discussions were held with the following SuperB experts : M. Giorgi, C.Sanelli, S.Tomassini, P.Raimondi, LAPP vibration specialist (L. Brunetti). Very well prepared,comprehensive document, including the difficult task of recommending limits against the list of criteria.

TECHNICAL REPORT ON SUPER B SITE COMMITTEE REVIEW MEETING HELD AT FRASCATI 18/19TH APRIL 2011 Report: May 10, 2011 Meetings took place on the 18th and 19th April 2011, between the SBSC and SuperB experts at the INFN-LNF Frascati Site. The main purpose of the meeting was to review the “SuperB Site Requirements Evaluation” document and to plan future work for the SBSC. This report summarises the findings of the SBSC on this “Site Requirements” document and on the possibility of constructing this new facilities on either the INFN-LNF Frascati Site or nearby at the TOR VERGATA Site.

Initial recommendations (1) General Issues (Construction, environmental..) The committee learnt that the focus now is to understand if the TOR VERGATA site matches the project requirements. On the TOR VERGATA site, there exists a 10m thick layer of deposits. The opinion of the committee is that it is most likely that this layer will have to be removed to found the new machine on ‘virgin’ ground. This will certainly have a cost impact on the project. Obviously, detailed site investigation boreholes are urgently required in order to proceed with the study. If permission for drillings is difficult, perhaps some simple trial pits could be excavated in the virgin ground areas e.g. in the old dry river bed area ? The committee recommends that the approval procedures (and time) needed for formal Project Approval by the authorities for the TOR VERGATA site is verified and compared against the Frascati site. For example, is an environmental impact study not required (e.g. radiation levels, acceptable volume of the surface buildings, noise during construction) ?

Initial recommendations (2) General Issues (Construction, environmental..) As between the two foreseen sites the construction methods cannot be equivalent (tunnel boring machine for FRASCATI and cut-&-cover for TOR VERGATA, a comparison in the overall time schedule should be prepared for the evaluations of the sites. The technical requirements for the SuperB project are severe and very specific. All the requirements (thermal and stability) are not in the common practices of engineering companies and of construction companies. Furthermore, these requirements cannot be handed over without having the SUPERB process working. The committee recommends that the design and construction phases of the project are somehow de-coupled (i.e. not the same company) A detailed schedule should be developed highlighting the critical milestones e.g. deposit removal, checking of vibration levels, compare construction methods (TBM or cut & cover) Does a Master Plan exist for the region, and if so has it been checked that no future developments are in contradiction with this project proposal ? An updated seismic map should be checked for TOR VERGATA ? Existence of potential archaeological remains should be double checked ?

Initial recommendations (3) Cooling & Ventilation The committee learnt that ground water wells are not available and only available supply is from the city drinking water. As such, wet cooling is excluded. A dry cooling scheme needs to be further investigated including discussions with local authorities for supply and discharge water. The ventilation concept for the tunnel would be of interest to the committee e.g. temperature stability It doesn’t appear that Cooling and Ventilation issues are a ‘show stopper’ and could impact on the site selection

Initial recommendations (4) Electricity The committee learnt that it is believed power stability/ quality of the electrical network is adequate for both the Frascati and TOR VERGATA sites The only advantage of using the Frascati site would be that you could re-utilise some existing infrastructure, e.g. a primary station The link to the grid for both sites needs to be better understood and costed (i.e. new lines/stations at TOR VERGATA v upgrade of Frascati Site) Choosing the TOR VERGATA site, it is necessary to build a new HV station and the line links.

Initial recommendations (5) Ground Stability / Vibration Long term and short term settlement/vibration constraints in section 4 of the report seem severe for the TOR VERGATA and Frascati Site e.g. 0.1µm peak to peak The committee suggests that longer term vibration measurements should be made e.g. in the basement of a nearby building ? Construction of new Metro link could potentially be a noise source Ground stability / vibration is a potential ‘show stopper’ for the site and as such, these investigations should have top priority Close to highway

Vibration SBSC recommends to the project the definition of the limits in the following way: The total transverse beam oscillation induced by random quadrupole oscillation should not exceed 10 % of the corresponding beam sizes. The ambient noise (i.e. the Root Mean Square value above 1 Hz) measured over a longer period (several weeks) with a wide band instrument (e.g. seismic sensor) should be well below the vibration limit (budget) over most of the time (less than 50 % over 90 % of the time). Vibration measurements have a high priority for the site selection process. For flat beams, as it is the case for SuperB, the measurement of the vertical vibration is sufficient. The design of magnet support and girders must avoid resonances below 50 Hz and the additional floor motion must also well bellow the machine limit as defined above.

Tunnel boring It should be note that at CERN, in Molasse rock (fairly similar to the Pozzolane Rock), the average advancement rate for a 4.5m diameter tunnel for LHC was approximately 30 linear metres per week using a roadheader. The roadheader also provides much more flexibility than a TBM, ie the number of machines can be adapted to suit program needs. 1200m/30 m/wk = 40 weeks

Next Steps for SBSC ? Report was issued in early May The SBSC mandate could be extended to check the site evaluation made by the SuperB team for the candidate site/sites

The SBSC thanks INFN LNF for its hospitality!