Session 1: Major Events in 2006

Slides:



Advertisements
Similar presentations
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Advertisements

Electrical Distribution: How to Ensure Safe Powering and High Availability for LHC Machine Protection Systems? V. Chareyre / EN-EL Machine Protection Panel.
Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.
Electrical power distribution in experiments W.Iwanski.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
UPS network perturbations in SX2 Vincent Chareyre EN-EL-SN ALICE Technical Coordination Meeting 7 May 2010.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
Trieste (IT), 20 may 2008POPCA A novel 60 MW Pulsed Power System based on Capacitive Energy Storage for CERN PS machine Jean-Paul BURNET CERN, European.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Jean-Paul BURNET, AB/PO ATC-ABOC days, 22 January 2007 PS Main Power System: What has been done from June 2006? What will be the situation in 2007? PS.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
A second Thyristor Controlled Static Var Compensator for SPS
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
POWER QUALITY AND NETWORK DISTURBANCES in CERN’s electrical network K. KAHLE, TS-EL Diploma students R. Sternberger, M. Neubert 1 st TS Workshop Archamps,
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
YETS & LS2 Works EN-EL / Power distribution
CONS and HL-LHC day Analysis of needs from TE-EPC
Situation of the Static Var Compensators at CERN.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
the high-voltage network of CERN ToMORROW
LV Safe Powering from UPS to Clients
Technical Session CERN ISOLDE – Workshop 2016
Installations, modifications, consolidation in 2005:
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Renovation of the 45-year old PS magnets
the CERN Electrical network protection system
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-CV interventions during EYETS for PS and PSB
YETS & LS2 Works EN-EL / Power distribution
Managing infrastructure faults to minimize accelerator down time
POPS Strategy for Restarting & Repairing
Business opportunities related to CERN electrical network
Power cut 18kV cable for EMD404/E9 is heating
ELECTRICAL POWER-II Electrical engineering sixth semester
Maintenance at ALBA facility: Strategy for the conventional services
Experimental Areas – LS2 planning
Review of hardware commissioning
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

Session 1: Major Events in 2006 ATC-ABOC Days 2007 Session 1: Major Events in 2006

Session 1: Major Events Chairman: Frederick BORDRY (AB/PO) Scientific Secretary: Peter SOLLANDER (AB/OP) 1 Statistics of Operational Events and Consequences by Bettina MIKULEC (AB/OP) 2 Electrical network: selectivity and protection plan by Jose GASCON (TS/EL) 3 The safety electrical networks at CERN by Anne FUNKEN (TS/EL) 4 The situation of the Static Var Compensators at CERN - risk analysis, maintenance strategy and consolidation by Karsten KAHLE (TS/EL) 5 PS MAIN POWER SYSTEM: What has been done from June 2006? What will be the situation in 2007? by Jean-Paul BURNET (AB/PO)

Machines – A Difficult Year … after an 18 month shutdown for many machines … and rebuilding ¼ of the PS main magnets … in a brand new control room … with new applications software (SPS) … with often a reduced level of availability from the equipment groups due to LHC commitments … needing new procedures for access and safety … having a large number of new personnel in the OP group … and having an impressive series of major breakdowns B. Mikulec, ATC/ABOC Days, 22 Jan. 2007 …again a slide ‘stolen’ from Paul…

B. Mikulec, ATC/ABOC Days, 22 Jan. 2007 Major Breakdowns Breakdown of the SPS main compensator on May 8th delays startup (1 month) PS rotating machine: damage of the rotor discovered on May 15th; after rotor exchange back to normal operational conditions on June 22nd (no more spare!) Several major power cuts: Short on the 400 kV line on May 15th  limited to power consumption of 63MVA (machines down for 2.5 days); in addition 130 kV failure on May 16th Major power cut on July 27th (3 days down): explosion of an 18 kV circuit breaker  diesel backup groups started, but could not take the load  complete electricity breakdown after UPS batteries were empty; even telecom failure, security installations affected… PS septum SHM42 failure August 1st (sparks) F61S.BHZ01 - the never-ending story: south branch of East Hall badly affected all over the run and out of action from 28th of Sept! …, tank 3 of LINAC2, PS inflector zone, ISOLDE, AD, SPS water leaks, CNGS, … B. Mikulec, ATC/ABOC Days, 22 Jan. 2007 SPS: delay of startup for 1 month (but ‘luckily’ for SPS in shadow of PS rotating machine failure…) PS septum exchange with spare: ~1 week total intervention time dominated by 4 days (instead of 6) bake-out. East Hall quadrupole QDE02 had to be exchanged on Aug. 9th (short to ground)

Equipment failures have potential to increase machine down-times: age of machines and ever more demanding running conditions… Old systems often a bottleneck due to decreasing support (sometimes even loss of experience!). Could in some cases better documentation help? Identify critical system, orphan equipments and equipment with only one specialist (holiday or illness problem) Flawed beam instrumentation usually doesn’t lead to machine down-time, but adequate and well working diagnostics can significantly improve beam quality and therefore physics outcome. Piquet/expert service should be re-evaluated per domain for the LHC era and should be harmonized. (see Session 2) - Changes to E-Logbook allowing to obtain easier more precise statistics. Subject mentioned but not discussed: - Demineralised water in PS complex and air conditioning - PS inflector zone: could it be put back rapidly in place in a safe manner ?

CERN HV Electrical Network Electrical network: selectivity and protection plan by Jose GASCON (TS/EL) CERN HV Electrical Network Voltage levels: 400kV, 130kV, 66kV, 20kV, 18kV and 3,3kV 94 HV substations: 38 LHC, 26 SPS and 30 Meyrin 4 sources: EDF (400kV & 20kV), EOS and Diesel Generators 3 different interconnected networks by site: LHC: Machine, General Services and Safety (Assured) SPS: Pulsed, Stable and Safety (Assured) Meyrin: Pulsed, General Services and Safety (Assured) Sites interconnected by 18kV links Power flow direction depending on the configuration About 1,000 protective relays and switchgears Compensators and harmonic filters Diversity of loads: pumps, converters, dipoles, transformers, compressors

Black Saturday 29th July 2006 (II) EDF- 400 kV EOS - 130 kV ME10 – 18kV ME9 – 18kV SEM12 – 18kV BE9 – 18kV SEH9 – 66kV EHD27 201 412 200 901 900 701 209 800 114 311 104 204 210 304 EHD21 801 LHC LOOP ASS HALL N.A. LOOP SPS LOOP .... MEYRIN SITE EHT7/E9 66/18 kV 70 MVA EHT102/1E 66/18kV 70MVA T5 400/66 kV 110 MVA 802 EHT612/1E 130/18 kV 60 MVA Earthing transformer 2nd fault after “autotransfer system” 3 ph. detected by all prot. but blocked Protection trips at 66kV source ! ! ! ! ! Black Saturday ! ! Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007

29th July 2006: selective EDF- 400 kV EOS - 130 kV ME10 – 18kV ME9 – 18kV SEM12 – 18kV BE9 – 18kV SEH9 – 66kV EHD27 201 412 200 901 900 701 209 800 114 311 104 204 210 304 EHD21 801 LHC LOOP ASS HALL N.A. LOOP SPS LOOP .... MEYRIN SITE EHT7/E9 66/18 kV 70 MVA EHT102/1E 66/18kV 70MVA T5 400/66 kV 110 MVA 802 EHT612/1E 130/18 kV 60 MVA Earthing transformer ! ! ! ! ! Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007

CERN HV Electrical Network Protection system Switchgears from all ages : specific clearing time for each generation Different technologies in protective relays 40% digital, 40% electronics and 20% electromechanical Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007

Plan for the selectivity - Database of the selectivity settings (HV protection) is completed to 60% Short circuit calculation completed and under approval (TS/EL) Should be completed by April 2007. No presently simulation of the complex CERN network Need change of hardware (40% digital, 40% electronics and 20% electromechanical) to implement selectivity between 66kV and 18kV levels. Schedule: April 2007: proposals for selectivity for 18kV network. Implementation of new settings if time discrimination is OK but anyway auto-transfer system (BE9, SEM12 and ME9 substations), north area, west area, LHC-1 and LHC-5 will continue to provoke trip at 66kV level January 2008 : implementation of solutions for the previous areas and for the main substations By end of 2008 : selectivity for all CERN HV network

Recommendations: To complete the survey of the settings allowing to check the level of selectivity and to produce a proposal for implementation. (April 2007: proposal presentation at ATC) To implement asap the settings and change the necessary hardware - To model the CERN network (Simulation program as EMTP or equivalent) to be able to simulate the network (selectivity, incident,…) - Medium and Long term: review of CERN electrical network for new projects (Linac4, SPL, PS2,…) and future energy perspectives O. Bayard wrote :“L’alimentation en électricité du CERN 1957 à 2007” (CERN/ST/96-01; rev. Feb 1997). New vision will be necessary.

The safety electrical networks at CERN by Anne FUNKEN (TS/EL)

See mains perturbations ? Levels of availability of the electrical supply (400V distribution level) Types of supply See mains perturbations ? Switched off by AUG ? Back up by Diesel set ? Downtime ? Normal EBD Yes No Mains downtime Assured EAD 30s to 90s Safety ESD UPS EOD Yes or No Battery autonomy : 10min to 2h 48 Vdc ECD Battery autonomy : 2h to 3h Useful for the end user to check on which network their loads are connected

The CERN assured networks The assured networks are composed of : 14 Diesel-generator sets (6.3 kV, 3.3 kV, 400 V), stand-by mode total installed power : 17.5 MVA 17 PLCs Normal / Safety 29 main switchboards (18 kV, 3.3 kV, 400 V) The implementation of the assured network is different for each site : Meyrin SPS with North Area and CNGS LHC

SPS Areas BA1 to BA5, CCC, BA80 : BA6, BB6 and BA7 : 3.3 kV safety network supplied from the 18 kV Meyrin assured network (800 kVA, 3.3/.4 kV transformer in ME59. 4 km link), 250 kVA available on each point BA6, BB6 and BA7 : 18 kV distribution supplied from the 18 kV Meyrin assured network To SE0 BA81, BB81, BA82 : 3.3 kV network supplied from the dedicated 1250 kVA, 3.3 kV Diesel-generator set in BB81 CNGS, TSG4 : 3.3 kV SPS safety network EAD switchboard in TSG4 supplied from the normal network due to the lack of assured power in BA4, BB4 18 kV Meyrin Assured Network Diesel set BB81 Meyrin Diesel sets refurbished in 2005

Recommendations: Tests AUG and Diesel should not be delayed Annual calendar for all the tests (AUG, diesel, 400 kV) must be defined in accordance with the machine operation schedule. Any changes on the safety network should be documented and approved. (who: TS/EL group leader). Safety network: “if you change anything on a safety system, it’s mandatory to retest the system”. Recommendation to group the modifications before the tests except if it’s really vital. Safety network: clear list of equipments presently on the different networks should be available and easily comprehensible by the users. In case of “29th July incident” type : reconnection priority list must be established and known by the different groups - The type of electrical supply required for LHC star points and safety systems must be clarified. All star points linked to safety systems should be fed on UPS. Survey under progress by TS/EL, equipment owners and Paul Proudlock. Autonomy should be defined and approved (ICC, LTC)

Recommendations: - LHC evacuation systems (sirens) are presently supplied by the assured network but should be on the safety network Diesel tests on 4th December 2006: 14/14 Diesel-generators sets did operate correctly and 16/17 PLCs Normal/Safety with correct function. but no feedback from users !!!! It would be important to know the users who should have been supplied but were not and users who should not have been supplied but were? - CNGS (BA4) : transfer of the EAD switchboard in TSG4 to the assured network (presently supplied from the normal network due to the lack of assured power in BA4, BB4 ) TI2, TI8 (BA7, BA4) : transfer of the smoke extraction systems to the safety network 3.3 kV safety network of SPS: review the power balance and correct start-up of safety equipment in the worst case (i.e simultaneous starts of big consumers like smoke extraction systems when the safety network is on Meyrin diesel sets,…) Medium term: Meyrin strategy (centralized with redundancy) or LEP/LHC strategy (decentralized diesels per point).

The situation of the Static Var Compensators at CERN. Risk analysis, maintenance strategy and consolidation by Karsten KAHLE (TS/EL)

Introduction: SPS electrical network (1974) SPS 400 kV 18 kV (2002) (Nov. 2007) T1 T2 T3 SVC1 SVC2 Project SVC3

Introduction: Meyrin network and Booster 66 kV (Prevessin) TCR (20.5 Mvar, 1997) Meyrin Filters (17 Mvar, 1972) 18 kV PA1 18 kV Meyrin network Station ME9, b. 212 TCR Booster Filters Meyrin Meyrin network Booster

Recommendations: - Meyrin harmonic filters situation was presented as a high risk (ageing equipment, 35 years). The technical state should be clarified urgently (by April 2007) and presented to the ATC. SCV3 (SPS) will be ready by Nov. 2007. No redundancy in 2007: SVC 1 + SVC2. (spare capacitors are in stock in case of the same problem as in 2006) Saturated inductance of SVC1 presents a high risk of failure. The two options (maintenance of SVC1+BB3 % complete spare parts for SVC2 and SVC3 (coils, capacitors, …) should be evaluated (MTTR and costs) before to take a decision. LHC SVC: Pt 2 and Pt 4 SVC will be put back in operation in 2007 (which month ?) Pt 6 and pt 8 SVC by mid 2008 : impact on HW commissioning and LHC start up should be clarified. Karsten’s comment: the exact planning will depend on the availability of resources.

What has been done from June 2006? PS MAIN POWER SYSTEM: What has been done from June 2006? What will be the situation in 2007? by Jean-Paul BURNET (AB/PO) 2004 2006

History of the problems June 2006: Restart of the 13MVA back-up system 2 weeks in operation for SFTPRO cycles to fill SPS 13 MVA transformer connected to SPS 18kV

26 GeV cycles 26 GeV cycles can not be done with two stations (9 kV) The power distribution is too weak (11 MVA) The overload is too high (60 MVA) for the 13MVA transformer Solution Use only one station to supply the magnets Only 4kV applied to the magnets, Bdot divided by 2.7 Max power divided by 2 (Reminder: Max cycle tested in 1980: 20GeV) 4 kV

Conclusions In case of breakdown of the rotating machine, the physics program will be reduced. Here are the major scenarios: 26GeV cycles alone for LHC physics (4 per minute) or 14GeV cycles alone for SPS physics Single injection every 14.4s (two stations mode, ~ normal Bdot) Double injection every 28.8s (two stations mode, ~ normal Bdot) Double injection every 16.8s (one station mode, half Bdot (like LHC cycles)) Mixed cycles: 14-20-24-26  one station mode 4 equivalent 26GeV cycles in a supercycle of 60s Example: 2 * 14 GeV + EASTC + LHC + NTOF Change of mode shall be limited at one or two per day

MPS with capacitive energy storage Use capacitors to store energy and to exchange it with the magnets Directly integrated in the power converter Classical dry capacitors 5 kV, 1F, ~1000 caps in 6 banks (7m * 2m * 2.5m) New concept based on industrial products (Medium Voltage Drives) Outdoor containers and modular Turnkey system

Where are we with the new MPS? MS-3490/AB started 1st December 06 Functional specification under approval Contract expected after FC of September First power test in 2008 Installation and final power test in 2009 Operation in 2010

Recommendations: Maintain the high level of maintenance of the existing rotating machine - Test every year the back-up solution (13 MVA) - Schedule an MD session 26GeV with beam in 2007 to make sure that the 13MVA is a backup solution for LHC 26 GeV cycle with beam parameter measurement in 2007 (with rotating machine and end of the year with 13 MVA transformer) No beam. No pulse (Don’t pulse more than necessary) No “more” spare rotors Full speed for the new solution (but not in operation before 2010) In parallel, it would be good to test a SMES prototype with power converters for later projects (RCS machine).

The end