API SC 10, Work Group 13 Update:

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

SPE WITSML: Technology to Business (T2B) for the Oilfield J
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
(Project) SIGN OFF PROCESS June 21, 2010
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
ISA 220 – Quality Control for Audits of Historical Financial Information
MGT-555 PERFORMANCE AND CAREER MANAGEMENT
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
ISO 9001:2015 Revision overview - General users
More on Data Mining KDnuggets Datanami ACM SIGKDD
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 May 7, 2015.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
Page 1 ISO/IEC JTC 1/SC 7/WG 7 N Summary of the Alignment of System and Software Life Cycle Process Standards The material in this briefing.
Development of an API Specification for Float Equipment API Spec 10 F.
1 IEEE Technology Selection Process Presentation of Contribution C Dan Gal Berlin, September 14, 2004.
Energistics Asia South Region Meeting: (Drilling) WITSML SIG Update New Delhi, IndiaAlan Doniger 14 January 2007Chief Technology Officer Le M▲ridien New.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
19th January 2012 Don Wells (Hess)
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair.
Introduction to Well Completions
UBC Dietetics Major Modules and Forms Update
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –
UNDERSTANDING ISO 9001:2008.
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2017 Winter Meeting Progress Report.
Drilling & Measurements (D&M)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
EIA approval process, Management plan and Monitoring
API SC 10, Work Group Update:
School of Business Administration
Input to project from IIP
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
API SC 10, Work Group 3 Update:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2017 Summer Meeting Progress Report.
API 17Q – Subsea Equipment Qualification
Completion Object Overview
3rd Year Psychology Project PSY600
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing Phase IV
2016 Exploration & Production Standards Conference Subcommittee 10
First 8 slides are what was presented in San Fransisco…
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
SYSTEMS ANALYSIS & DESIGN
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
EER Assurance December 2018
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2018 Winter Meeting Progress Report.
European Commission DG Environment
WG on Composite Cements: Calgary Meeting 2017
2016 Exploration & Production Summer Standards Conference
Hydraulic Fracturing Best Management Practices Comments and Considerations Presented By: Michael E. Parker, P.E. Parker Environmental and Consulting, LLC.
API SC 10 WG15 Stage Cementing Collars
How Well is Your Well? UIC Class I Well Construction Standards
“Finishing” Task 2 – Discussion of the Way(s) Forward
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
API SC 10, Work Group 13 Update:
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Today Members Workgroup charge/ Current Status Discussion.
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2019 Winter Meeting Progress Report.
API SC 10, Work Group 13 Update:
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

API SC 10, Work Group 13 Update: Revision of 10 TR1, Cement Sheath Evaluation SC 10 WG 13 January 2017 1

Agenda: Wed, January 18th (2:00 PM – 2:30 PM) WG Charge WG Membership 10TR1 Table of Contents Discussion on first draft of sections: Section 2 - Scope Section 3 - Framwork ii Objective of Evaluation, iii Methodology Section 5 Verification techniques Next Steps Adjourn

Update 10TR1 Cement Sheath Evaluation: Work Group Charge: Update 10TR1 Cement Sheath Evaluation: Include latest logging technology Include cement job execution data interpretation Include cement evaluation log data interpretation Include other evaluation techniques 3

Additional volunteers? WG Volunteers: Gunnar DeBruijn (Schlumberger) Abe Vereide (BP) Glen Benge (Benge Consulting) Pavel Shaposhnikov (Schlumberger) Erick Cunningham (BP) David Stiles (ExxonMobil) Shailesh Dighe (Baker) Antonio Bottiglieri (Baker) Alan Parlipiano (Hess) Joe Shine (Aramco), Doug Patterson (Baker) Gary Frisch (Halliburton) Glenn Donovan (Shell) Dan Mueller (ConocoPhillips) James Reid (Oxy) Luis Padilla (Chevron) Jerry Calvert Additional volunteers?

Framework – Put Cement Sheath Evaluation in Perspective Table of Contents (first draft) Introduction Scope Framework – Put Cement Sheath Evaluation in Perspective Objective of the Cement Job Zonal Isolation Casing Support Objective of Evaluation Methodology – based on objective of cement job, evaluation tools available Overall process flow Methodology for each evaluation dataset (lift pressure, show test, acoustics, temperature Available data sets …. Attached word document

…. Attached word document Scope (first draft) 2.1 Scope This technical report discusses methods and gives guidance for the evaluation of the cement sheath during installation and after it has been installed in a well. It gives a framework for the evaluation of the cement sheath in the context of the objectives of the cement job. Various verification techniques are discussed including surface indicators during the cement job and post cement job evaluation techniques.   2.2 Conditions of Applicability (optional) This technical report applies to cement sheath evaluation during the whole life cycle of the well. In this context, the cement sheath may be evaluated soon after installation in the well. The cement sheath may be evaluated during the operations phase of the well, and it may be evaluated during workover and abandonment operations. 2.3 Objective (optional) The technical report objective is to help enhance confidence in cement sheath evaluation. Tools, techniques, and methods of interpretation are included. …. Attached word document

…. Attached word document Framework (first draft) 3 Framework – Put Cement Sheath Evaluation in Perspective i. Objective of the Cement Job Zonal Isolation Casing Support ii. Objective of Evaluation The objective of the evaluation is to determine if the objectives of the cement job have been met. The objective(s) for the cement job has to be defined, typically in the drilling and / or cement program. …. Attached word document

…. Attached word document Framework (first draft) 3 Framework – Put Cement Sheath Evaluation in Perspective iii. Methodology – based on objective of cement job, evaluation tools available Overall process flow Obtain cement program (including cementing objective) Understand cement requirements that meets objectives. Determine methods and / or measurements that can evaluate cement requirements with required certainty Determine expected values from measurements and methods for cement that meets the cement requirements and objectives Collect measurement data sets, including measurements before, during, and after the cement job Compare measurements to expected values Interpret the data and comparison (and understand limitations and certainty) of cement placement Determine if cement meets requirements and cement job objectives is achieved Determine if additional methods / measurements to improve certainty are required Utilize additional evaluation methods as required  Methodology for each evaluation dataset (lift pressure, show test, acoustics, temperature Methodology is to use the expected cement placement, compare each data set to the expected values in that scenario. Available data sets Cement Program Operational data from the cement job (Pressure, pump rate, density) Representative cement lab tests Representative mud test …. Attached word document

…. Attached word document Verification Techniques (first draft) Verify design meets objectives (Lead: Glen) The ultimate goal of cement evaluation will depend on the objective of the job. If the objective is to have pressure isolation at a casing shoe for continued drilling, then the evaluation technique may simply consist of a pressure test. For objectives requiring top of cement above a certain point in the well, then pressure matches using job data, temperature surveys or sonic logs may be in order. Determining the presence of zonal isolation becomes one of the more difficult tasks. Depending on the length of the interval requiring isolation, and the slurries pumped, the selection of evaluation technique can become quite complex.   For proper cement design, the slurry, placement and ultimate objectives of the operation must be understood and agreed to by all parties involved. This should include the drilling organization, reservoir, geology and completions groups. During the initial discussions of the objectives, there may be conflicts and compromises. This process defines the operating envelope for the cement job. For example, if the top of cement is desired a significant distance up the hole, but there is little ECD available for placement of the cement, then a decision must be made to employ multi-stage cementing or use a specialty cement system. If a specialty cement system, such as foam or one extended with high concentrations of microspheres, is used, then it must be understood that these systems will not “show up” on some logs the same as more conventional systems. The use of these slurries can dictate the use of a more sophisticated evaluation log or processing technique. Understanding the objectives of the job, and the design limitations that may be required to meet those objectives, a decision can then be made as to how the job will be evaluated, the success criteria used to determine if the job has been performed properly, and if the objectives were met. Performing the cement evaluation can be performed by techniques including pressure analysis to determine top of cement, pressure testing of a casing shoe and sophisticated logs. Selecting the evaluation methodology to match the objectives of the job is a cornerstone of proper cement evaluation. …. Attached word document

- Continue to fill the document - WG meeting in Houston Next Steps - Continue to fill the document - WG meeting in Houston - Draft ready for summer meeting

Adjourn

Minutes Minutes of the WG Session for the update to 10TR1, Jan 20, 2016 2pm 1. Reviewed the WG charge Work Group Charge: Update 10TR1 Cement Sheath Evaluation: Include latest logging technology Include cement job execution data interpretation Include cement evaluation log data interpretation Include other evaluation techniques Moved by Rick Lukay, 2nd by Glen Benge - carried 2. Reviewed Work Group members and solicited members (included on membership slide) 3. Discussion about topics not currently in 10TR1: consider topics Formation collapse, formation/casing interaction, and non-cementicious materials 4. Reviewed draft table of contents comments: do not discuss remedial or zonal isolation discussion on risk and reliability, should be linked back to objectives Thank you for the useful discussion 5. Adjourned at 2:20 pm