Planning, design & construction RECITAL HALL Project #

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Human Resource The Recruitment Agency. ABOUT US HRRA (Human Resource Recruitment Agency) is an independent company specializing in staff recruitment since.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Mission The faculty and staff of Pittman Elementary School are committed to providing every student with adequate time, effective teaching, and a positive.
SPED Certification Program September 17, 2003 Houston, TX.
PLANNING, DESIGN & CONSTRUCTION SOUTH DINING RENOVATION PROJECT # DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING September 2 nd, 2015.
PLANNING, DESIGN & CONSTRUCTION SOUTH DINING RENOVATION PROJECT # CONSTRUCTION MANAGER AT RISK (CMAR) SELECTION PRE-SUBMITTAL MEETING September.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
Building Individual Professionalism in Construction Since A Valid, Reliable & Fair Direct or Indirect Measure for ACCE Construction Program Student.
RFP Oligonucleotides Pre-Submittal Conference 1 October 13, 2015.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
PLANNING, DESIGN & CONSTRUCTION RECITAL HALL PROJECT # DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING January 12, 2016.
Construction Management At Risk Process
Higher Learning Commission (HLC) Re-affirmation of accreditation in
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
PRE-PROPOSAL CONFERENCE Welcome! American Air Power Museum 1230 New Highway, East Farmingdale, New York November 14, 2012 Management, Business Development.
Designer selection procedures. Legal framework Article 3D. Procurement of Architectural, Engineering, Surveying Services, and Construction Manager at.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
PENNSYLVANIA’S STATE SYSTEM OF HIGHER EDUCATION
Procurement & Strategic Sourcing
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Career and Technical Education Center at Heintz CTECH
Procurement & Strategic Sourcing Commercial Print Services
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Procurement & Strategic Sourcing
Clinical Practice evaluations and Performance Review
Planning, design & construction TINSLEY HALL RENOVATION Project # 09
GOVERNANCE COUNCILS AND HARTNELL’S GOVERNANCE MODEL
Joint Parking Task Force Update Procurement & Strategic Sourcing
Proximity to Opportunity IAH New Terminal C North
RFP EMISSIONS SOURCE VALIDATION
CM at Risk v. Design-Bid-Build
Procurement & Strategic Sourcing Charter Bus Transportation Services
TRAVEL SERVICES Request for Proposal
Joint Parking Task Force Update Procurement & Strategic Sourcing
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing (Law School Media Wall)
Procurement & Strategic Sourcing
American Institute of Constructors
Designers’ Manual Overview and Chapter Contents
Consultant Selection Training
How to Build a Great Team
Request for Proposal and Specifications for
Request for Proposal and Specifications for
Drainage Improvements at VW Yard (RFQ-101)
UNC Charlotte INTERCOLLEGIATE SWIM TEAM PROJECT
PROJECT DELIVERY METHODS
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
PENNSYLVANIA’S STATE SYSTEM OF HIGHER EDUCATION
Strategic Plan Implementation July 18, 2018
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
DBIA Manual of Practice
Procurement & Strategic Sourcing Scott Hall Vivarium Updates 2019
An Integrated Strategic Plan for AUC
OCPS CCNA SELECTION COMMITTEE TRAINING
About ACE Purpose of ACE Values
European Spallation Source ERIC Procurement
Multi-discipline academic research science technology engineering & math (stem) building project phase 1 NAU Project No RFQ for Construction.
Procurement & Strategic Sourcing
Pre-Submittal Meeting As Needed Environmental Services RFQ
Curriculum and Programs
Curriculum and Programs
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

Planning, design & construction RECITAL HALL Project # 09. 371 Planning, design & construction RECITAL HALL Project # 09.371.162 CMAR selection Pre-Submittal Meeting October 20, 2016

INTRODUCTIONS Agnes Drogi – Director of PDC Josh Spear – Project Manager Stephanie Bauer – Assistant Director of Admin (absent) Jessica Ott – Contract Administrator

AGENDA NAU Mission & Goals: 2016 and beyond… Recital Hall: Project’s Mission & Goals Site & Utility Maps Pre-Construction Phase Construction Phase Schedule Project Cost Assumptions Sustainability & Total Cost of Ownership Pre-Construction and Construction Expectations Other Consultants under Owner Qualification submittal format Questions??

Nau mission & goals: 2016 and beyond… Mission: To provide an outstanding undergraduate residential education strengthened by research, graduate and professional programs, and sophisticated methods of distance delivery.  Values:  Excellence in Education:  Offer a rigorous, high-quality education to all students. Student Success:  Place learner needs at the center of our academic and service planning, policies, and programs. Educational Access:  Provide all qualified students with access to higher education. Diversity:  Achieve multicultural understanding as a priority of educational and civic life. Integrity:  Operate with fairness, honesty, and the highest ethical standards to sustain a community of trust. Civility: Support a civil, engaging, and respectful campus climate.

Nau mission & goals: 2016 and beyond… Strategic Goals: Student success Nationally recognized research excellence Global engagement Diversity, civic engagement, and community building Commitment to Native Americans Sustainability and effectiveness

Recital hall project’s mission & goals Recital Hall Mission: The Mission will be developed with the successful Design Team, NAU stakeholders, and NAU PDC Rep’. The focus of this project from Day 1 will be “Teamwork”. Recital Hall Vision: - RECOGNITION - INTEGRATION - COHESIVE - WORLD CLASS - TRANSFORMATIVE - DYNAMIC/HARMONY - FUNCTIONAL - THOUGHTFUL EXPERIENCE - GREATNESS - COORDINATION - ICONIC - CELEBRATE We need great synergy on the team.

Site map

Site map Site considerations: Proximity of bus route, Heavy foot traffic Construction working hours, safety, etc.. Material deliveries Adjacent occupied buildings Utilities Disruption avoidance Site logistic plan

Utility map

Site map

Site map

SITE MAP

FLOOR PLANS

FLOOR PLANS

FLOOR PLANS

Pre-construction phase Review Pre-construction and Construction requirements in the RFQ and in DP/CMAR contracts. Review the DP’s Agreement so you understand their responsibilities as well Review NAU Design Guidelines & NAU Technical Standards Be ready to submit your Pre-Construction proposal shortly after CMAR Team selection!!! Preparation for ABOR Approval Pricing of GMP at 100%DDs for ABOR submittal Project is contingent on Fundraising

Construction phase Construction is targeted to start May 2017 Option to start in May 2018 if fundraising is delayed First items to coordinate - Abatement - Temporary egress for Ardrey -Temporary utilities for HVAC and power

Schedule SCHEDULE: Hold for CMAR interviews – 11/22/2016 CMAR selected as soon as possible after interviews Begin proposal and contracting period after Thanksgiving Construction is targeted to start May 2017 Option to start in May 2018 if fundraising is delayed

Schedule

Project cost assumptions Construction Cost: $10,800,000 to $11,500,000 – which includes Owner’s Costs – Asbestos Abatement, A/V, Security Soft Cost (~30%): $4,000,000 approx. This includes FF&E, DP Fee, Other Owner Costs Total Project Cost: $14,400,000 Estimated Total Gross Square Footage Range: ~18,000 GSF ~250 seats

Sustainability & total cost of ownership This facility is expected to be LEED Gold Certified. CMAR Team (including proposed Sub-Contractors such as MEP Trades) shall have strong knowledge and experience with sustainability initiatives relative to this type of building and with renovation and construction. Pre-construction team must have a strong understanding/experience with energy-efficient HVAC systems. Total Cost of Ownership shall be calculated to demonstrate that building materials and building systems will be selected based on most sustainable criteria.

Preconstruction & construction expectations & team approach Collaboration between DP and CMAR for: dynamic estimating of construction costs throughout the design process to prepare cost estimates that accurately forecast a detailed GMP, detailed scheduling around design and construction efforts. Analyze of phasing options, budget and scope management, constructability reviews, system reviews and value engineering. Active/Engaged participation with constructability from Assessment/Programming through Commissioning. Experience with achieving low Cost of Ownership (energy efficient building with adaptability).

Consultants under owner Geo-Tech investigation: as needed Survey: as needed 3rd party Estimating Firm: to provide independent estimating and validation of DP’s and CMAR’s estimates at 100%DD and GMP phases. Commissioning: Commissioning Agent will be hired by NAU by end of September and will actively participate in design review during the pre-construction phase. Both DP and CMAR will be required to be fully engaged during commissioning activities at the end of construction.

Qualification submittal format Proposal due date: November 3, 2016 by 1:00 pm 1 Original and 7 Copies + 1 Electronic Version Page Count: Items A – G cannot exceed 20 pages Item A includes the introduction and the bonding letter Tabs and front/back covers do not count as pages unless there is content on them Resumes cannot exceed 1 page each (this is a major change from prior RFQS) Proposed team-member’s projects, not firm’s projects Submittal Certification is 1 page

DISQUALIFICATION ITEMS Refer to RFQ for specifics Turning in submittal late – if mailing, be mindful of slow delivery times Contacting any NAU employee regarding this project other than as outlined in the RFQ (Stephanie Bauer at Stephanie.bauer@nau.edu) Not providing the correct number of submittals or exceeding the page limit Submitting in the wrong location Company profiles in Resumes. Resumes should be about the individual, not the firm

RECITAL HALL project # 09.371.162 QUESTIONS???