“kicking on to the finish” Guildford Baptist Church Phase 4 – Sept 2017 “kicking on to the finish” Building Redevelopment Project
Building Redevelopment Project a light shining out, drawing people in
Since March….. - considered and reviewed over 80 design issues with ReFormat, Caldera and other specialists - Looked at opportunities to reduce costs and simplify design - Looked at the detailed design requirements for the auditorium
Lighting Sound systems and acoustics
Two more Phases of Work 4A – ground floor kitchen, toilets, lantern 4B – auditorium, front extension, external Work at ground floor now includes completion of this
Proposed scope of work for next phase (Phase 4A) Part of Auditorium; Lantern roof Lantern windows Side windows Window and blind controls Lighting in lantern External cladding to auditorium Auditorium stays in use for services Ground Floor; Kitchen and food store Two store areas Gents and Ladies toilet Disabled toilet & wet room Dining space: lighting ceiling, acoustic partition Underfloor heating Drainage Rainwater harvesting
Phase 4A ACOUSTIC PARTITION GLASS PARTITION LADIES TOILET DRAINAGE & UNDERFLOOR HEATING DISABLED TOILET DECORATION GENTS TOILET STORE CEILING AND LIGHTING STORE NEW DOOR KITCHEN
Dining space – toilets - kitchen - stores Phase 4A Store areas Male, Female, disabled toilets Kitchen Servery Dining Dining space – toilets - kitchen - stores
-extends into snug area Kitchen Layout -extends into snug area - includes servery Work at ground floor now includes completion of this
Phase 4A - Auditorium Lantern roof Lantern windows Side windows Window and blind controls Lighting in lantern External cladding to auditorium Gutters & rainwater tank Auditorium stays in use for services
Phase 4B Auditorium Lighting, AV/IT Seating Parent & toddler room (balcony) New entrance Media studio (balcony area) Flat area with flexible staging Ventilation with some cooling Auditorium
Phase 4B Servery Lounge area Terrace Ramp Reception Terrace Ramp Servery – lounge - extension – external areas
Auditorium design concept images More information on phase 4B and auditorium at future meeting
Cost for 4A Will be;- £1,000,000 (as approved at church meeting) - This assumes a start in 2018
What next; Gift day 15 October Complete update of drawings and specification documents When most of funding in place get tender from Caldera and check costs Phase 4B – as soon as possible after phase 4A.
“kicking on to the finish” Building Redevelopment Project “kicking on to the finish”