NATIONAL SOLAR WATER HEATING (NSWH)

Slides:



Advertisements
Similar presentations
National Solar Water Heater Programme Update May 2014 Slide 1.
Advertisements

DEPARTMENT OF TRADE AND INDUSTRY INCREASING ACCESS TO FINANCE.
Presentation to the Portfolio Committee on Human Settlements A progress report on Cooperative housing initiatives.
Financing energy efficiency measures in low-income and affordable housing September 2012 Shehnaaz Moosa SouthSouthNorth
AREAS OF COLLABORATION BETWEEN DSBD AND DOE ON THE SOLAR WATER HEATER PROGRAMME.
National Solar Water Heater Programme Roll Out Strategy
PORTFOLIO COMMITTEE ON SMALL BUSINESS DEVELOPMENT Mr. Mthokozisi Mpofu Acting DDG: Programmes & Projects.
£32m Wave 2 Growth Hub Programme 02 December 2014 Tracy Milsom Claims and Monitoring Manager.
Comments on Progress with regard to Solar Water Heater Rollout Select Committee on Economic Development 28 February 2012.
Sustainable Energy Society of Southern Africa Creating a Sustainable Solar Water Heating Industry in SA.
PRESENTATION TO THE PORTFOLIO COMMITTEE OF AGRICULTURE, FORESTRY AND FISHERIES AGRIBEE CHARTER COUNCIL STRATEGIC PLAN AND BUDGET FOR 3 YEARS 2015/16 –
Wales and Third Sector EU Funding. Government of Wales Act 1998 sets out the National Assembly’s legal obligations to the sector and how it proposes,
1 Solar Water Heating Update Presentation to the Select Committee on Economic Development 09 November 2010.
NATIONAL SOLAR WATER HEATING (NSWH) PROGRAMME 1 Purpose: Information sharing Date: 04 September 2015.
PRESENTATION TO THE ROAD PAVEMENT FORUM 09 November 2010 Progress & Update since the Road Construction & Maintenance Summit.
1Confidential and Not for Publication PROGRESS ON DELIVERY AGREEMENT FOR OUTCOME 8: SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE.
1 OHS BRIEFING FOR PORTFOLIO COMMITTEE ON LABOUR 20 AUGUST 2002.
Presentation to Parliament’s Portfolio Committee on Labour 10 August 2004.
Solar Water Heater Programme Roll Out Strategy 18 February
NATIONAL SOLAR WATER HEATER (NSWH) PROGRAMME TRAINING FRAMEWORK 1 Purpose: Training Framework for NSWHP Date: 04 September 2015.
NATIONAL SOLAR WATER HEATER (NSWH) PROGRAMME Summary / Discussions 1 Purpose: Summarise Workshop Discussion Date: 04 September 2015.
Financed Linked Individual Housing Subsidy Programme (FLISP) Financed Linked Individual Housing Subsidy Programme (FLISP) HUMAN SETTLEMENTS PORTFOLIO COMMITTEE.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE OVERVIEW OF THE NDPW PRESENTED BY THE TOP MANAGEMENT COMMITTEE 26 MAY 2004.
Recommended Strategy for an Integrated National Approach to EE Presentation to the Parliamentary Portfolio Committee on Energy 6 September 2012.
2016/01/201 Presentation to Select Committee on Economic Development Eskom’s Solar Water Heating Programme 28 February 2012.
1 DEPARTMENT OF MINERALS AND ENERGY DME STRATEGIC DIRECTION 2005/6 – 2009/10 PRESENTATION TO THE NCOP Wednesday 25 May 2005 Thandeka Zungu Chief Compliance.
Status: Confidential Economic Development Department to Select Committee MTEF allocations to Infrastructure PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION.
1. PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS Public Hearing on Division of Revenue Bill March
NATIONAL DEPARTMENT OF HEALTH National Health Insurance Grant Select Committee on Appropriations Hearing on 3 rd and 4 th Quarter Expenditure 4 th June.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION Portfolio Committee on Water Affairs and Forestry 22 June 2005 V.227.
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
Presentation to the Portfolio Committee on Public Works 1 March 2016 GREEN BUILDING FRAMEWORK PROPERTY MANAGEMENT TRADING ENTITY.
Small Business Development Programme 19 May 2016.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Renewable Energy Initiatives Ms Nomawethu Qase. Presentation Outline Overview of RE Focus Areas Enabling Policy Framework Current Renewable Energy Implementation.
Seda Annual Performance Plan 2017/18 – 2019/20
STATE OF THE HOUSING INDUSTRY:
Luthin Associates Overview
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION
Business Briefing Security Service Providers
SA GHG Emission Reduction System: Progress and development of 2nd Phase of the DEROs and Carbon Budgets PCEA 28 OCTOBER 2016.
NATIONAL e-STRATEGY Presentation to the Portfolio Committee on Telecommunications & Postal Services DG: ROBERT NKUNA AUGUST 2017 Building a better life.
Renewable Energy and SA GHG Emission Reduction System
4/29/2018 NDA STRATEGIC PLAN AND ANNUAL PERFORMANCE PLAN PRESENTATION TO THE PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT 3 MAY 2017 MRS THAMO MZOBE CHIEF.
BREEDE-GOURITZ ANNUAL PERFORMANCE PLAN & STRATEGIC PLAN
Portfolio Committee- Trade and Industry – 11 March 2015
MAINSTREAMING OF WOMEN, CHILDREN AND PEOPLE WITH DISABILITIES’ CONSIDERATIONS IN RELATION TO THE ENERGY SECTOR Presentation to the Joint Meeting of the.
Presentation to the Portfolio Committee: Water & Environment
Human Resource Development Council for South Africa (HRDCSA)
Recommended Strategy for an Integrated National Approach to EE
Eskom’s Solar Water Heating Programme
Collaboration with other government entities
PRESENTATION OUTLINE Purpose of the presentation Structure Progress
Draft Career Development Services Policy: Building an effective and integrated Career Development Services System for South Africa Mr FY Patel Deputy.
Albanian VET Strategy and Action Plan for the period
Skills Development Strategy
Skills Development Strategy
Economic Development Annual Report 2009/10
SOLAR WATER HEATING MASS PROGRAM
GCF business model.
DEPARTMENT OF AGRICULTURE, FORESTRY AND FISHERIES
Provincial Budgets and Expenditure Review: 2001/02 to 2007/08
NEDLAC PRESENTATION TO THE PORTFOLIO COMMITTEE OF LABOUR
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
Presentation To The Portfolio Committee Infrastructure Investment
PRESENTATION TO THE STANDING COMMITTEE ON APPROPRIATION
POVERTY ALLEVIATION INTERVENTIONS
BROADBAND SA CONNECT - AN OPPORTUNITY FOR SMALL ICT BUSINESSES
Director-General: Mr. E Africa
Introduction to the Budget Process
Presentation transcript:

NATIONAL SOLAR WATER HEATING (NSWH) PROGRAMME Mr. Ompi Aphane DDG: Policy, Planning and Clean Energy Date: 11 August 2015

Outline Historical Background Current Context (where are we now?) Strategic Context (where do we want to go?) Stakeholders Conceptual Framework (how to get there?) Summary: Re-focused by main objectives Milestones and Deliverables

Background (Historic) NSWH programme launched in 2010 In 2008 Eskom was mandated to install 1 000 000 (1 million) systems under conditional grant, with the objectives to: a) reduce electricity demand and Green House Gasses (GHG) emissions; b) protect poor from electricity tariff increases; c) facilitate local manufacturing industry and create employment. Outcomes achieved: 400 000 systems installed in residential dwellings to date; electricity reduction not achieved as focus has been in low electricity consumption areas; imported products have dominated installations; poor quality installations due to lack of training; unreliable verification of number and location of installed systems due to lack of monitoring; lack of maintenance of systems resulting in users reverting back to electric systems.

Current Context (where are we now?) Eskom’s mandate to implement the NSWH Programme has been terminated; DOE has centralised and re-conceptualised the programme; DoE re-focused on following main objectives Socio-economic (jobs & access to hot water) Energy (load reduction) Industrialisation (local manufacturing capacity)

Strategic Context (where do we want to go?) Targeted system installations (1.8 million by 2020 – linked to budget allocation); Financial resource requirements (R 400 million within DOE for current Financial Year + further allocations to be secured); Obtain economies of scale through “standardised” systems, pricing and aggregated contracting model and Reduce energy consumption by about 55 GWh per month, which potentially can displace the use of expensive diesel to the extent of 12% every month.

Strategic Context (where do we want to go?) Socio-economic focus Subsidised new installations (low income) Non-functional / old tube system replace with “new” ? Energy focus (load reduction) Aimed at existing and insured market segments via South African Insurance Industry and Banks: Re-active: “faulty/failed” geyser to be replaced with Solar Geyser under insurance claim Pro-active: existing functional electrical geysers to be replaced with Solar Geyser (SA Insurance Association (SAIA) + Banks) Contributing further to National Development objectives: Industrialisation / industry development (through Local Content requirements) Job creation (through focused installation & maintenance training) Sustainability (through life cycle management = operations & maintenance jobs) SAIA = South African Insurance (Industry ?) Association

Strategic Context (where do we want to go?) Envisaged governance framework: Establishment of Programme Governance Steering Committee; Partnerships across relevant national government departments and with Municipalities, e.g. Identify and train installers in partnership with all relevant stakeholders; Implementation of the dti designation of solar water heater tanks and collectors for local production; Partnerships with government institutions, e.g. SABS on manufacturing accreditation, local contenet and product verification; Partnership with private sector to achieve programme objectives i.e. manufacturing of SWHs; financing relationship with SAIA and Banks Sustainability through life cycle management of installed systems through monitoring and verification of installed systems

Relevant stakeholders + Provinces, local authorities and communities in which installations are located Salga / housing, Quality Council for Trade & Occupation

- Includes Youth, Women, Veterans Solar Water Heating Programme Conceptual Framework DoE 1 2 Supply Installation Agreement Installation 3 Delivery Storage Scheduling Service Level Agreement (DoRA type) Supply Agreement Supplier1 ….. Suppliern Munic1 ….. Municm SWH Systems Feasibility Stand exists Structure type Water available Designated Areas Social Facilitation Verification (Independent) Installation + Life Cycle Technical Support (e.g. gIZ, Danish) (SABS) . Assurance (Construction SETA DoL DHE) Install Co1 ….. Install Con Accreditation SMME Support (e.g. SBD, IDC) Local Installers Trainees Training Agents Linked to broader IPP training programme (in overlapping locations) 5 Placement Agreement Flow of goods Supplier Specific System Training / Accreditation Local Installers Labour Desk / Database - Includes Youth, Women, Veterans Governance 4 Support Assurance Verification

Summary: Re-focused by main objectives 2 3 1 Economies of Scale Focus: Energy (load reduction) Focus: Socio-economic (jobs & access to hot water) 1 DoE 2 Subsidy Agreement MOU Insurers SAIA Re-active Implementation Agreement Supply Agreement Pro-active Manufacturer / Supplier Conditionality Local content requirements Verification requirements “Standardisation” Focus: Energy (load reduction) 3 Building regulations New Buildings Government Buildings

High level work flow diagram DOE NSWH 2015/2016 – Window 1 High level work flow diagram FY 15/16 Q2 FY 15/16 Q3 FY 15/16 Q4 FY 16/17 Q1 Sep 15 Dec 15 Mar 16 Jun 16 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Contractual framework with Municipality • Draft Framework and Service Delivery Agreement & Obtain BAC approval • Engage munics on rolling basis (prioritised) • Munics define geographical rollout Procurement of Suppliers/Manufacturers • Draft RFP and agreements • BAC approval and Issue RFP • Evaluate Recommend and Approve Suppliers • Sign Implementation Agreement Current Funds committed Procurement of Installers Current Funds committed • Draft RFP and agreements • BAC approval and Issue RFP • Evaluate Recommend and Approve Installers • Sign Implementation Agreement SAIA Current Funds committed • Obtain BAC approval for draft SAIA MOU & Subsidy Agreement • Finalise and sign MOU with SAIA • Sign Subsidy Agreement(s) with Insurance companies UIF Funding Training Assuming parallel process for installation & supply • Setting up and roll out of training programme • Selection of trainees Monitoring • System Development (gIZ) • Monitoring System Implementation Plan • Site Inspections (Pre and after and maintenance) • Evaluation reporting Current Funds committed + Other Departmental Contributions Programme support & development • Research, analytical, procurement, legal etc. INSTALLERS MUNI DoE SUPPLIERS DHE SAIA Other e.G DoL, SABS, gIZ Key Decision Points Milestone Points Key Dependency

Elements of the SWH programme requiring further investigation Technology Assessment Cost Benefit Analysis Industry Capacity Assessment Landscape & Key Stakeholders Legislation & Policy Review Funding Investigation Feasibility Risk Analysis

Way forward Obtain approval for SWH implementation plan discussed in presentation from Economic Sector, Employment and Infrastructure Development (ESEID) Cluster and Cabinet; The allocation for 2015/16 of R398 million to be divided between social, energy focus SWH systems and maintenance; Need to obtain approval to re-appropriate the un-spend Eskom funds to DOE; Implement and monitoring of roll-out programme by DOE, different Government departments and entities as proposed in presentation and To ensure that the main objectives of Socio-economic (jobs & access to hot water) Energy (load reduction) Industrialisation (local manufacturing capacity) are achieved.

Thank you