OVERVIEW EUMETSAT Background WAN links

Slides:



Advertisements
Similar presentations
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
Advertisements

Web Services Architecture An interoperability architecture for the World Wide Service Network.
HALO Harmonised Coordintion of Atmosphere Land Ocean Integrated projects in the GMES Backbone Interoperability of WIS (> GTS + EUMETNET+ GEONET) with other.
1 Improving Data Mobility & Management for International Climate Science, & Challenges in the provision.
End-to-End Efficiency (E 3 ) Integrated Project of the EC 7 th Framework Programme E 3 WP5 Objectives E 3 WP5 Structure and Research Challenges
EUM/OPS/VWG/11/0498 Issue GEONETCast EUMETSAT EO Portal Product Life Cycle Slide: 1.
Slide: 1 ROSA GRAS Meeting February 2009 Matera, Italy User Services EUMETSAT EUMETSAT Data Access & User Support.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
WMO Space Programme, CBS Technical Conference1 Integrated Global Data Dissemination Service (IGDDS)
AIMS Workshop Heidelberg, 9-11 March /20 A Telecom and IP Project from ETSI Gerald Meyer
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
Cross-border Empowerment of Next Generation Access National Networks MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF BULGARIA.
GEONETCast Implementation Group GEONETCast: Delivery global data and observations Presented by: Sally Wannop – EUMETSAT EU’s Speaker Corner at GEO-X, Geneva,
Decentralised and Remote Access to Confidential Data in the ESS (ESSnet DARA) Overview and State of the Art Maurice Brandt Destatis FIRST EUROPEAN DATA.
Access to Clinical Expertise Steve Bain David Powell Jemma Hughes Paula Jeffries.
1 Framework Programme 7 Guide for Applicants
ITEA Easy Wireless project (EW-VTT) Milla Huusko
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
ILA 2003 in Boulder, Colorado 4-6 November 2003 NELS beyond 2005 Gunn Marit Hernes NELS Co-ordinating Agency Office (CAO) Northwest European Loran-C SystemCo-ordinating.
APPLICATION Provisioning & Management made EASY EASY to ManageEASY to Manage EASY to MarketEASY to Market.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
GEO-NETCast Update Linda V. Moodie GEO-NETCast Point of Contact GEO Architecture and Data Committee Seattle, Washington July 20-21, 2006.
Towards the definition of an eIRGRoma, 10 December An e-Infrastructure in Europe: a strategy and policy driven approach for a policy eIRG A pink.
GEONETCast Update Linda V. Moodie GEONETCast Point of Contact GEO Architecture and Data Committee Geneva, Switzerland February 28-March 1, 2007.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
DataTAG Research and Technological Development for a Transatlantic Grid Abstract Several major international Grid development projects are underway at.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
1 Infra-SAN: Technical architecture buildup. 2 Technical architecture buildup Purpose : Service driven Formalise the test definition and realisation Technical.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
Connect. Communicate. Collaborate Click to edit Master title style PERT OPERATIONS.
Connect. Communicate. Collaborate The Security Model of GÉANT2: A Co-operative Approach Christoph Graf, SWITCH TNC’07, Lyngby, 22 May 2007.
Digital Ecosystems Re-tuning the user requirements after 3 years Digital Ecosystems Re-tuning the user requirements after 3 years Towards Business Cases.
1 Alma SMART Collaborative Networks Collaboration Made Simple.
WMO RA VI WORKSHOP, SOFIA, BULGARIA, 1 – 3 NOVEMBER 2011 Satellite dissemination in RA-VI Slide: 1.
Slide: 1 xxx xxx, 23 October 2008 xxx EUMETSAT Data Access.
5G PPP Stakeholders event From Phase 1 to Phase 2
CAP Workshop, WMO, Geneva 9 – 10 December 2008 Lothar Wolf, GEONETCast Implementation Group The GEONETCast Alert Channel.
Eurostat I) Context & objectives of KIP INCA project Project owner is the Environment Knowledge Community (EKC) EKC is an EU inter-services group involving.
Making the future happen Some remarks from the perspective of the Reykjavik-Group Chair full report:
Connect communicate collaborate Connecting Helix Nebula EGI Technical Forum Prague Sep Niels Hersoug; General Manager, DANTE Ltd; Project Manager.
Networks ∙ Services ∙ People Di4R Network. Services. People. GÉANT 28 th September, Krakow.
1 The XMSF Profile Overlay to the FEDEP Dr. Katherine L. Morse, SAIC Mr. Robert Lutz, JHU APL
DATEX Activity 6 Enhanced Usability
Bob Jones EGEE Technical Director
EUMETSAT Perspectives on Inter GISC Communication (ET-CTS 2014 Doc 19)
2nd GEO Data Providers workshop (20-21 April 2017, Florence, Italy)
Social Protection Global Technical Team Retreat,
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
A key principle of the National Disability Insurance Scheme (NDIS), is that people with disability are empowered to exercise choice and control and access.
Steve Brewer Stichting European Grid Initiaitive
Unleashing Earth Observation data
Fundamentals of Information Systems, Sixth Edition
Ian Bird GDB Meeting CERN 9 September 2003
The GEANT Perspectives
GÉANT International Networking and Collaboration
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
FEI- New IT Landscape Project FEI 21
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
Future EU Grid Projects
ESF Conference: Summary of Key Learning's in Working Group 1: Implementing the YEI and the ESF to support the Youth Guarantee: developing partnerships.
Item 2.2 of the agenda IT Working Group meeting 2016
Microsoft Virtual Academy
Network Technology Evolution
Network Technology Evolution
eContentplus 2007 Work Programme
Presentation transcript:

OVERVIEW EUMETSAT Background WAN links Multicast accross GÉANT infrastructure Summary of Experience

EUMETSAT mission statement represents a commitment to actively deliver data to users, 24/7, 365 days a year.

BACKGROUND EUMETSAT requires terrestrial WAN links for: Data acquisition from EUMETSAT Ground stations Exchange of data with world wide distributed bi-lateral partners

EUMETSAT PERSPECTIVES ON THE USE OF GÉANT Using existing European Infrastructure in a cost efficient way Buildup of a strong relationship with a European Infrastructure provider Enhance existing connectivity by the addtion of GÉANT based links Exploring and enhancing knowledge in the area of multicast accross terrestrial links

DATA ACQUISITION FROM GROUND STATIONS Operational implementation of redundant links between: Svalbard and EUMETSAT HQ (2011) Fucino and EUMETSAT HQ (2011) Meteosat antenna Usingen, Germany Fucino, Italy Metop antenna Spitzbergen, Norway Jason antenna Operational usage of GÉANT based network links as backup to the prime connections

DATA EXCHANGE WITH BI-LATERAL PARTNERS Data exchange in the context of bi-lateral agreements In support to WMO and CGMS activities Partners are located world wide Europe Asia Pacific United States South America Typically the same set of initial data is required by each, therefore the need to explore terrestrial multicast

MULTICAST AS THE SOLUTION TO SCALABLE DISSEMINATION Same data to many users Highly scalabe solution for data providers as well as data recipients All users receive the same service Avoids unnecessary data duplication or replication Terrestrial multicast is based on a client initiated subscription EUMETSAT has many years of experience in multicast

MULTICAST ACCROSS GÉANT and NREN INFRASTRUCTURE Exploring the multicast usage on GÉANT infrastructure in Europe and their connectivity worldwide; 2011 Proof of concept on terrestrial multicast on GÉANT testbed 2012 3 month feasability study on terrestrial multicast via GÉANT 2013 Multicast test to Korea via GÉANT 2014 Two year prototype emulating operational scenarios of multicast accross GÉANT and NREN infrastructure (contract setup in final steps). 2014 Multicast test to US via GÉANT

TWO YEAR PROTOTYPE It is important to gather the relevant expertise of multicast via terrestrial networks in order to make qualified recommendations for the future; The use of multicast is considered beneficial for a harmonisation of existing data delivery mechanisms; Based on the positive experiences gathered during the 2012 feasibility study an extended prototype of a terrestrial multicast component based on GÉANT was initiated; Datasets that need to reach many (more than 10) users but do not require a full broadcast; Users in this context are organisations or institutes that would otherwise obtain the data via Internet-kind services; Datasets that are to be transported outside Europe for the purpose of data provision to EUMETSAT partners.

TWO YEAR PROTOTYPE II Re-cap: What is terrestrial multicast via GÉANT intended for? Typically large volume datasets that do not require a stringent SLA; The prototype operation over a time frame of two years will allow an in depth analysis of terrestrial multicast and the related user needs; It is planned to connect app. 5-7 European sites to the prototype including a multicast connection to Asia (Korea) and the US;

Concept I Usage of GÉANT infrastructure in Europe and their connectivity worldwide; To setup a network infrastructure that enables test sites to connect to the terrestrial multicast dissemination; The terrestrial multicast is still considered a prototype; The central multicast platform will multicast via the connected NRENs and the GÉANT infrastructure to standard EUMETCast reception stations.

Concept II The key element of the concept is to enable access to terrestrial prototype dissemination using a Service Contract with DANTE; DANTE will perform the necessary managment tasks in the cooperation between NRENs and DANTE covering: Technical aspects Enabling of multicast in the NRENs; Networklevel monitoring; Support during acceptance testing; B) Service interactions between EUMETSAT, DANTE and NREN Network Operations Centres; C) Anomalies and Enhancements coordination.

Concept III Characteristics European wide multicast dissemination of data volumes of up to 100 Mbit/s per logical service. Multiple services are possible; SSM Multicast Mode with IGMP V3 Usage of standard EUMETCast reception station; Monitoring of the multicast capability of each NREN using dbeacons; Monitoring of the availability of the EUMETCast announcement channel up to each Site access point; Usage of several reference stations (ideally one per country) for a closed- loop monitoring of the overall service; Monitoring of data completeness; Escalation scheme in case of outages. Management Standard user management; Data contents as currently typically requested by the bi-lateral and cooperation partners. Constraints Access for public-sector non-profit sites only; Not all NRENs might support multicast; No guaranteed service level; Timeliness cannot be guaranteed; It is a realistic goal to achieve data completeness (via multicast configuration parameters) but it cannot be formally guaranteed; Volumes beyond 100Mbit/s have not been tested yet.

OPPORTUNITY FOR HARMONISED DISSEMINATION MEANS AND USER INTERFACE Dissemination means are transparent to the user Same reception station Same transport software Same level of data security Same user management Same data management Harmonised subcription model

Implementation plan and schedule Service contract was signed March 2014 with an initial duration of 2 years, several options and extensions can be exercised if required; The implementation will have 4 phases: Phase I: Ready all NRENs for multicast; Start: Q2 2014; Phase II: Setup an “initial core network” with the help of the volunteering prototype sites; Start: Q3 2014; Phase III: Perform tuning activities on network and also on application level until a satisfactory overall service has been reached within the initial core network; Start: Q4 2014; Phase IV: Debrief on prototype dissemination to EUMETSAT Member States Spring 2015 delegate bodies; There is no commitment as yet whether to operate this terrestrial multicast operationally.

TIMELINE SUMMARY 2009: Analysis of GÉANT portfolio and high level meeting with EC 2011: Prove of concept using GÉANT testbed 2011-2012: Operational implementation of GÉANT based Ground Station links 2012: Feasability study of multicast accross GÉANT and NREN infrastructure 2013: Multicast test via GÉANT to Korea 2014 (Q3): Multicast test via GÉANT to United States 2014 (Q4): Two year prototype emulating operational scenarios of multicast accross GÉANT and NREN infrastructure

SUMMARY OF EXPERIENCE Highly positive overall experience Scalable GÉANT infrastructure Positive experience of multicast dissemination across WAN Single point of contact for interaction Strong partner and with strong expertise to support wider-scale prototyping activities Allows seamless integration of solutions in addition to existing capabilities

Q & A