San Diego County Public Works –

Slides:



Advertisements
Similar presentations
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Storm Water Permit Compliance Susan Murphy. Storm Water: To See or Not To See… We submit a Notice of Intent for Coverage (NOI) Prepare and Implement a.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
SMARTS Training definitions CGP transition plan Pilot project discussion SMARTS Manual review 1.
The purpose of the San Dieguito Union High School District’s stormwater management plan is to comply with applicable stormwater regulations, educate.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Module V Final Wrap-Up ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control (SC) III Tracking, Wind Erosion, and Construction.
Module 7: Construction Phase
Implementing the Municipal Separate Storm Sewer System Permit Stormwater Division General Services Department Board of Supervisors Work Session October.
Introduction to Construction General Permit Inspections.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
What Do Inspectors Need To Know About BMPs? Tim Zimmerly, Terrill Lemke Los Alamos National Laboratory LA-UR
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Non-Storm Water Discharge (NSD) (Dry Condition) Observation Inspection and Reporting.
Construction Site Best Management Practices and the Project Design Process.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
Erosion and Sediment Control Plans (ESCPs) San Rafael, California November 12, 2015 Marin County Stormwater Pollution Prevention Program.
Training Module 10 Project Management Prepared by RCAP Solutions for the PA Department of Environmental Protection.
Lisa Haney Senior Environmental Specialist and Storm Water Compliance Program Manager Orange County Sanitation District Lisa Haney Senior Environmental.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
San Rafael, California November 12, 2015
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Pollution Control: For Field Office Construction Sites.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Northern California Chapter of the American Public Works Association January 28, 206 Beth Baldwin, Program Staff Contra Costa Clean Water Program.
Briefing regarding the new State General Stormwater Pollution Control Permit.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Hampden Township Stormwater Management Program
January 18, 2017 City of San Diego
ODOT District MS4 Liaison Training: Why are we here?
Ohio Department of Transportation
MS4 On-site evaluations & common findings
The new sf bay area municipal regional permit (mrp 2.0)
Regulatory Perspective Statewide Construction General Permit
San Diego County Dept. of Public Works - Capital Improvements Program (CIP) Tom Hart, PE, QSD/QSP - San Diego County Public Works Hello 10/2/16.
City Council Meeting December 20, 2016
TPDES Construction Management at the City of Laredo
Managing Stormwater. Erosion and Storm Water Management Certification Program Dwayne Stenlund, MSc, CPESC Minnesota Department of Transportation.
Temporary Works Co-ordination
Project proposal for ISO 27001:2013 implementation
Chesapeake Bay Program Partnership’s Citizens Advisory Committee
Planning and BMPs for Large LUPs
Chesapeake Bay Program
ECM SERVICES Group Stormwater Monitoring Program
GREEN INFRASTRUCTURE PLAN FOR (Permittee)
DTF implementation Roles and responsibilities
Van Wert, OH Water and Wastewater Element Training
Planning and BMPs for Capital Improvement Projects
Career Opportunities in Public Accounting
Planning and BMPs for Capital Improvement Projects
Emulsion Task Force Meeting
FY 2020 Community Grants Training
INDOT Storm Water Management
What is Project Management?
MS4 OVERVIEW 2015.
Career Opportunities in Public Accounting
ECM SERVICES Group Stormwater Monitoring Program
Pre-Submittal Meeting As Needed Environmental Services RFQ
Presentation transcript:

San Diego County Public Works – Construction Engineering Planning and BMPs for CIP Projects Ali Pirouzian, PE, PEng, CPESC, QSD/QSP - San Diego County Public Works Insert appropriate picture 09/14/2016

Experience Senior Civil Engineer - San Diego County Public Works Construction Engineering (11 years) Private Sector (14 years) Vertical Horizontal Stormwater Permit Coordinator – Construction Engineering 09/14/2016

San Diego County Public Works Projects Average 3 to 4 SWPPP (>1 acre) projects per year with ranging from between $1M to $25M ( 5 projects last FY) Average 30 WPCP (<1 acre) projects per year with ranging $15K to $5M ( 26 projects last FY) 09/14/2016

Key Ingredients Storm water pollution control during construction “Starts at the top” and trickles down to the field level Director of Public Works (LRP) through Director’s Letter of Instruction (DLI) Construction Program Manager, Construction Engineering (Approved Signatory) through bi-weekly meetings and weekly QA reports CIP Construction Stormwater Permit Coordinator (SME) through Independent QA reports from third-party and weekly QA reports from Resident Engineers (REs) - This position created 6 years ago. REs (QSP and/or QSD) through joint field inspections with project QSP and reporting One of major priorities for County DPW Director is: Stormwater Pollution Prevention (CGP and MS4 Compliance). 09/14/2016

Key Ingredients Each project is given the tools for proper implementation water pollution controls Detailed specifications within the contract documents. SWPPP Templates for different Risk Levels and LUPs Identify the work and provide method of payment. All BMPs are paid by item unit price ensuring the contractor gets paid for work done right. Standard Plans for BMPs to ensure correct installations. Contract allows to add bid items and pay contractors by writing a change order if any BMPs is missed or something else would work better. 09/14/2016

Key Ingredients Knowledgeable and Trained Staff representing San Diego County You’ll get to hear from a knowledgeable field person in a few minutes. Importance of QSD and/or QSP in the field. All RE’s (Civil Engineer and Sr. Civil Engineers) of the County are either QSD or QSP. Understands the importance of CGP Compliance and S.D. County attitude. Understands the job is to construct a quality facility. Combine CGP Compliance with construction activities planning to ensure one seamless operation Works with the contractor to achieve CGP compliance during construction (goodwill) Teamwork 09/14/2016

Dashes of This and Pinches of That Independent Quality Assurance (IQA) Reviewer IQA Review Reports Personal site visits Sampling & Analysis follow-ups Work with San Diego County Watershed Department Interaction with Contractors / AGC, Agencies and Consultant Other 09/14/2016

Money Gives CGP Compliance Its Taste Payments to Contractors to Date SWPPP projects ( 1 acre< ) have range between 70K to 825K (1.4% to 10% of the total contract cost) WPCP projects have range between 6K to 100K (1% to 14% of the total contract cost) 09/14/2016