System Engineering Considerations (See Chapters 3 and 9)

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Systems Engineering Management
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
SE Team Agenda Review work being done by Dwayne –Review Sect 4.4.X for DAG – being processed –SEP Guide – being processed; seen as OK –Technical Reviews.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
Life Cycle Logistics.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Business, Cost Estimating & Financial Management Considerations
Contracting (Product) Considerations
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
Life Cycle Logistics.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, March 2017.
Lesson 9 Production and Deployment (P&D) Exercise Team #
Milestone A to Milestone B Requirements Management Activities
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Lesson 9 Production and Deployment (P&D) Exercise Team #
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, 24 April 2017.
ISA 201 Intermediate Information Systems Acquisition
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
ISA 201 Intermediate Information Systems Acquisition
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, April 2016.
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, December 2015.
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Cloud in a Rack Tuan Tran 10 March 2016
Information Required for Milestone and Decision Reviews
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
International Acquisition and Exportability (IA&E) Considerations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
c EMD Focus Plan to define product support package & supply chain
Lockheed Martin Canada’s SMB Mentoring Program
AOFR: Assessment of Operational Field Readiness
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Instrument PDR Summary of Objectives
Technology Maturation & Manufacturing Development Phase
8 Tech Processes Drive Acquisition
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
The Department of Defense Acquisition Process
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

System Engineering Considerations (See Chapters 3 and 9) CPD B A C MDD FRP/FD Decision Dev RFP Release Decision IOC Materiel Solution Analysis FOC Technology Maturation & Risk Reduction Production & Deployment Engineering & Manufacturing Development LRIP Decision ILA/IOT&E Operations & Support ICD Draft CDD PDR CDR FOT&E EOA/ILA ILA/OA EOA System Engineering Considerations (See Chapters 3 and 9) SE Activities Evaluate materiel solution alternatives against capability requirements (include cybersecurity) Conduct analysis to support preferred materiel solution Define balanced and achievable performance requirements Develop technical strategy/plans, including potential rapid approaches Assess technical risk/ opportunities; develop mitigation strategies Complete technology maturation to appropriate risk level Conduct prototyping to reduce technical risk Conduct engineering trades to inform/shape the CDD and program cost/schedule goals Establish system architecture (both H/W and S/W) Complete preliminary system design to meet requirements and address design considerations, include cybersecurity protections Update risk assessments and technical strategies and plans Complete detailed design to support development / fabrication and test Implement solutions that resolve performance deficiencies Develop fabrication / manufacturing / production processes and plans (both H/W and S/W) Establish/assess product baseline to meet performance and operational needs (include cybersecurity requirements) Assess production readiness Implement design for exportability Implement solutions to resolve production or operational performance deficiencies, (include cybersecurity vulnerabilities) Verify design and manufacturing documentation is consistent with configuration demonstrated to meet users needs Establish and control fabrication / manufacturing / production processes (both H/W and S/W) Initiate exportable version production as required Initiate sustaining engineering Implement changes to resolve operational deficiencies (performance, obsolescence, cybersecurity vulnerabilities, etc.) Implement solutions to protect digitized program/system information Implement solutions for new capability requirements (threat, technology, etc.) Execute demilitarization and disposal ISR: normally the FRP/FD review and decision completes the action Documentation and Reviews Inputs to Draft CDD/CONOPs Draft System Performance Specification Initial SEP & PPP (w/ associated documents) Input: AS, TEMP, LCSP ASR Inputs to CDD/OMS/MP/Use Cases System Performance Specification Updated SEP & PPP (w/ associated documents) Updated input: AS, TEMP, LCSP Initial interface control documents Functional/Allocated Baseline RAM-C Report SRR, SFR, PDR, IPA, ILA Inputs to CPD System Performance (and Initial Element) Specification Interface control documents Initial Product Baseline CDR, SVR/FCA, PRR, IPA, ILA Updated inputs to CPD System Performance (and Element) Specification Updated PPP (w/ associated documents) Final Product Baseline PCA, PIR Updated inputs to LCSP DMSMS Assessments Obsolescence studies/reports ECP Packages ISR

AS: Acquisition Strategy ASR: Alternative Systems Review CDD: Capability development document CDR: Critical Design Review CPD: Capability Production Document CONOPs: Concept of Operations DMSMS: Diminishing Manufacturing Sources and Material Shortages EOA: Early Operational Assessment FOC: Final Operational Capability FOT&E: Follow-on Test & Evaluation H/W: Hardware ICD: Initial Capabilities Document ILA: Independent Logistics Assessment PPP: Program Protection Plan PRR: Production Readiness Review RAM-C: Reliability, Availability, & Maintainability – Cost RFP: Request for Proposal SEP: System Engineering Plan SFR: System Functional Review SVR/FCA: System Verification Review/ Functional Configuration Audit SRR: System Requirements Review S/W: Software TEMP: Test and Evaluation Master Plan TRA: Technology Readiness Assessment TRR: Test Readiness Review IOC: Initial Operational Capability IOT&E: Initial Operational Test & Evaluation IPA: Independent Program Assessment ISR: In Service Review LCCE: Life Cycle Cost Estimate LCSP: Life-Cycle Sustainment Plan LRIP: Low-Rate Initial Production MDD: Materiel Development Decision OA: Operational assessment OMS/MP: Operational Mode Summary/Mission Profile OTRR: Operational Test Readiness Review PCA: Physical Configuration Audit PDR: Preliminary Design Review PIR: Post-implementation Review