Test beam straw prototype production status

Slides:



Advertisements
Similar presentations
CBM - Straw Tube Tracker
Advertisements

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
MULTIPIN CONNECTOR CONNECTION RADIALL P/N Receptacle for cable and for 52 socket contacts A1932AP RADIALL P/N Plug for cable and for.
Torch electronics test environment MCP readout update.
Ecal Connection board and Motherboard design. Connection Board Motherboard.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SCANNER THOUGHTS AND DESIGNS NN Group Dmitriy Beznosko| Stony Brook.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Status of NA62 straw electronics Webs Covers Services Readout.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
GEM Integrated PCB readout and cooling
We started last December: 32 channels prototype “Julich like” to:
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Start Detector for pion experiments
Tests of a MM octant prototype towards a Micromegas TPC Polarimeter
cooling and supports of the forward endcap EMC
SHiP straw tracker prototype tests
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Some proposals on HV circuits realization for segmented straw detector
Chamber Design and Integration RE3/1 and RE4/1
Power pulsing of AFTER in magnetic field
First of all we will remind some numbers:
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
Limited Streamer Tube Project Summary
Presentation transcript:

Test beam straw prototype production status Speaker: Konstantin Vorobev (National Research Nuclear University MEPhI), Viktor Kramarenko (M.V. Lomonosov Moscow State University) Petr Teterin (National Research Nuclear University MEPhI) Konstantin Zhukov (P.N. Lebedev Institute of Physics)

Set Up & Read Out Read Out Read Out Read Out ch#1 ch#10 or N ch#2 Layer 10 or N Layer 1 Layer 2 Layer 3 Layer.. d d ≥ 45 mm Read Out ch#1 Read Out ch#2 Read Out ch#10 or N TRD_SAS WS: Test Beam 2017 28th of March Prototype with different count of modules of straw

Gas distribution Flow in Inside module gas flow going parallel to each straw From module to module it is step by step. Gas flow Flow out TRD_SAS WS: Test Beam 2017 28th of March

Electronics boards for amplifiers & connectors Signals Signals Read Out with Amplifiers Signals from straws HV HV to straws TRD_SAS WS: Test Beam 2017 28th of March

How its looks on the basement stand now The prototype construction is based on «lego» principle 1 of 10 modules is ready at the moment Straws with manifolds Ground shielding TRD_SAS WS: Test Beam 2017 28th of March

Module of prototype part only The module has been tested with single-channel readout TRD_SAS WS: Test Beam 2017 28th of March

Components table Mechanical Straws Electronics Components Description Status / Quantity Mechanical Profile support Bosch, 30x30 mm done Ground shielding for electronics & straw Mounting & basement stand double Bosch, 30x30 mm Box for HV BNC & LV Lemo connector - Straws Straws tube TRT, size ~ 100 mm End plug & pins special production size done / for 7 modules Manifolds Electronics Altium design sent to production ReadOut and power connection 1st plate production done / 1 plate Channel electronic checking & Amplifiers HV BNC & LV Lemo BNC & Lemo to Electric tail TRD_SAS WS: Test Beam 2017 28th of March