Claims in Construction Projects

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Managing and Negotiating Change Orders Presented by Daniel Williams, P.E. May 1, 2008.
Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Factors Governing Housing Construction Costs in Saudi Arabia Abdelrahman Al-Gwaiz Kamal Al Dihan Faisal Al Ankary.
Overhead Costs in Building Construction in Saudi Arabia Mohammad Al-Shahri Ahmed Al-Ojairi.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Project Close Out CTC-470.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Software Development Problems Range of Intervention Theory Prevention, Treatment and Maintenance Planning, Development and Use Cost of Intervention.
1. Definition of a Reconciliation 2. Importance of a Reconciliation 3. When to Prepare a Reconciliation 4. Items Needed to Prepare a Reconciliation 5.
Abdallah M. Al-Mahasheer
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Six Cert IV - M. S. Martin March 2012.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
Contract Type Selection Don Shannon
CEM 520: Construction Contracting and Administration 03 June 2007
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Joint Venture in construction company in West Bank.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
King Fahd University of Petroleum & Minerals
Company LOGO Traffic Impact Study Case: Al-Irsal Center Project in Al-Bireh City Under the Supervision of: Pro.Sameer A. Abu-Eisheh Prepared by: Mohammad.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Measurement and Payment
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
FIDIC Tendering Procedures
Cost Overrun in Construction Projects Supervisor : Eng.Reema Nassar.
Causes of Disputes Prepared by : Ali Jamous Jasser Dwiekat
Accounting for construction contracts (LKAS 11)
Profession Practices (ECIV-5105)
Measuring Palestinian Labors Productivity
Variation Orders By: 1.majed bushnaq 2.mahmoud battat
EE Third-Party Solicitation Process Workshop Solicitation Alignment
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
Reality of Highway Construction Equipment in Palestine
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
LKAS 11: Construction Contracts
Causes of Contractors’ Failure “ North West Bank” Graduation Project
CONTRACT DOCUMENTS & CONSTRUCTION
Under supervision of: Eng. Reema Nassar
ENGINEERING MANAGEMENT (GE 404)
9/18/2018 Bids CONTRACTING Khamis…..
Emphasis on Quality Rochester’s City Owner Contract Process
Completing the State Aid Payment Request
Causes Of Contractors’ Failure In West Bank
An - Najah national university Civil engineering department
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Supervisor: Eng. Mohammad abu neama
Requirements Analysis and Negotiation
Closing the Negotiation
Factors Affecting Bid/No Bid Decision Making IN The West Bank
‘ Causes of Delay During Construction Phase at Palestine ’
2006 Central Region Post Mortem Review
Directed Change Constructive Change
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Claims in Construction Projects

OUTLINE *Introduction *Methodology *Data analysis *Identifying the responsibility of causes of claims perception of contractors *Rate of Importance perception of owners *Identifying the responsibility of causes of claims perception of owners *Rate of Importance perception of contractors *Recommendations *Case study

Introduction The aim of this research is to detect and analyze the factors that frequently cause claim in Nablus and Ramallah during the construction stage and allocation of causes .for issuing construction claims

Methodology The study will employ a questionnaire survey method. The data will be analyzed to identify the most important claims factors and identify the responsibility of causes of claims from the perspectives of the owners and contractors. Then recommendations about how to manage the will be suggested.

Data analysis Sample size: SS = n'/ (1+ n'/N), n' = S² / V² = (0.5)² / (0.05)² = 100. In Nablus: SS. contractors = 100/(1+100/22) =18. SS. owner is assumed. In Ramallah: S. contractors = 100/ (1+100/24) =19. S SS. owner is assumed. We fill out questionnaires through 37 buildings companies classified first class in Ramallah and Nablus (18 in Nablus and 19 in Ramallah)  

The owner is responsible for occurring the :claims are .Late payments Causes of construction claims and identifying the responsible it is of each cause perception of contractors. The owner is responsible for occurring the :claims are .Late payments .Differing site condition .Design changes and Change in .specifications based on the owner request Political reasons "wars" and force majeure.

The contractor is responsible for occurring the claims are Failure to provide access to the site . .Poor management .Insufficient qualified labor .Delay Poor understanding term of contract by the contractor. Variation of brands. Schedule error prepared by the contractor.

And the others causes are responsible for designer: Late approval for drawings and samples from .the supervisor engineer Direct changes in the planned method of .construction Delay in answering field questions and .variances Design error or inconsistence (unclear) .drawings Error in estimating the cost of the project, error .in estimating the duration of the project

Rate of Importance perception of contractors Weight of importance Scale weight 4 Extremely important 3 Very important 2 Important 1 Somewhat important Not important

Top ten causes of claims perception of contractors Rank Cause Weight from 4 1 Extra work in site 3.89 2 Municipalities regulation for example forbidden entry of trucks Downtown from 8:00 am to 3:00pm. 3.82 3 Differing site condition. 3.80 4 Variation of brands (type is not available in market). 3.76 5 Delay in construction because of weather conditions. 3.72 6 Schedule error prepared by the contractor. 3.70 7 Currency change. 3.68 8 The difficulty of implementing the project, as a result of implementing the project for the first time. 3.57 9 Delay in answering field questions and variances. 3.52 10 Poor management of site conditions. 3.46

Causes of construction claims and identifying the responsible it is of each cause perception of owners each cause perception of owners The owner is responsible for occurring the claims are .Late payments of agreed date Design changes and change in specification based on the .owner request .Variation of brands (type is not available in market) .Force majeure The contractor is responsible for occurring the claims are .Failure to provide access to the site .Poor management of site conditions .Insufficient qualified labor in the site .Delay

And the others causes are because of the designer late approval for drawings and samples .from the supervisor engineer .Delay in answering field questions Design error or (unclear) drawings. .Error in estimating the cost and the .duration of the project .Variation of brands

Rate of Importance perception of owners Rank Cause Weight from 4 1 Late payment of agreed date. 3.78 2 Extra work in site. 3.75 3 Delay in construction because of weather conditions. 3.69 4 Differing site condition. 3.65 5 Delay in construction and completion of the work. 3.60 6 Poor management of site condition. 3.52 7 Failure to provide access to the site. 3.48 8 Planning error in the planning. 3.44 9 Poor performance in construction. 3.41 10 Interference with the contractor during construction. 3.32

Case study Project name: Nablus - Beit Iba- Deir Sharaf road. Funded by: USAID. Construction management: BLACK&VETCH. Contractor: APCO/ARCON. Sub contractor: Brothers construction Company.  

The project is surfacing 2600 m from station 3000 m to 5600 m that is located on Nablus Deir Sharaf road. For surfacing the street; Brothers Company concluded agreement with Qandeel .Company Marshall test was examined in the lab, and .the results were positive but after heavy rain on the street its color has became light nearby white, and there was crashing in the street.

The lab was called again to examine the street, and took a sample 7*40*40 cm, the results of the test were as following: Stiffness ratio= 470 mm/kg; and the minimum in the specification is 500 mm/kg. There in the middle of the street section contains 300 m in good condition, but the lab recommended to remove it; because it will affect on the street. Initially Qandeel rejected the recommendations. But After this; the disputes were resolved by negotiate.

Briefly; in this case the claim was changes in the specifications that have been agreed, that the contractor is responsible for occurring, and the claim was resolved by negotiation.