CAD/PAD Ordnance Assessment (OA) & Surveillance

Slides:



Advertisements
Similar presentations
Mark Taber-Miller Universal Ropes Course Builders, Inc.
Advertisements

Draft FOUO - Not for Public Release CAD/PAD SPIs EASY ACCESS TO FLEET USERS Kathy Herc NSWC IHD, PHST Center, Picatinny Detachment 29 Nov 12
Unit I Module 1 - Introduction to RCM
1 HYDROSTATIC TESTING Approved for Public Release.
ISO 9001 : 2000.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Overview Lesson 10,11 - Software Quality Assurance
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 7 System Design and Implementation System Design and.
ISO 9000 Certification ISO 9001 and ISO
Naval Organization Chapter 6 BMR
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
BPT2423 – STATISTICAL PROCESS CONTROL.  Fundamental Aspects  Product Life Cycle Curve  Measures of Reliability  Failure Rate, Mean Life and Availability.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
By the end of this chapter, you should:  Understand the properties of an engineering requirement and know how to develop well-formed requirements that.
Unit I Module 2 - NAVAIR RCM Policy and Organization
From Research Prototype to Production
Surveillance and Proof M7 Slide 1. Definitions  Service Life: The overall life span  Storage Life: The life in specified storage conditions (part of.
Important informations
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
6/5/2016 PEO Aircraft Carriers Aerosol Can Evacuation & Compaction Unit SBIR Topic N
Managing Rotorcraft Safety During Frequently Performed Unique Missions September 28, 2005 AHS International Helicopter Safety Symposium 2005 Philip G.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
ON CONDITION TASK Module 3 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Insensitive Munitions S&T Roadmap Robert Maline
1 DLA Aging Systems Program: Technology Investment for Sustainment Cliff Wolfe Program Manager DSCR-VE March 2005.
Pharmaceutical Quality Control & current Good Manufacturing Practice PHT 436 Lecture 8 1.
JL47 PERIPHERY, MILD DETONATING CORD
CAD/PAD Engineering Division Overview
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Agenda Program Manager, Air (PMA)-201 Organizational Structure
CAD/PAD Technology Roadmap Overview
Pharmaceutical Quality Control & current Good Manufacturing Practice
Software Project Configuration Management
World Health Organization
2017 International Logistics Meeting (ILM)
CAD/PAD Development Process
Testing the System.
Parts Management Plan Builder 26 July 07
Current Event Brief!.
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
Add Graphic(s) or Photo(s) CAD/PAD Staff Engineer
Small Column Insulated Delay (SCID) Issues
ROCKET TESTING TYPES OF TESTS
Naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Contract Demetrius Green Contract Support Division Director.
Mild Environment Qualification and Maintenance
Software Requirements
USN/USMC CAD/PAD Program Overview 2017 CAD/PAD Industry Summit
USAF CAD/PAD Program Overview
The Cost of Service Life Extension 2017 CAD/PAD Industry Summit
JMP Helps Describe nth Order Degradation Models for the US Army
Add Graphic(s) or Photo(s) CAD/PAD Acquisition Team Lead
Embry-Riddle Aeronautical University
CAD/PAD Requirements Determination
XW36 and MG67 MK 205 Mod 1/2 Catapult Cartridge MK 113 Mod 0/1 Rocket Motor Assembly Tina Simms CAD/PAD Logistics 23 May 2017.
Foreign Military Sales (FMS)
Air Carrier Continuing Analysis and Surveillance System (CASS)
Quality Assurance.
HAZARD CLASSIFICATION
Quality Assurance.
Quality Assurance.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Operationalizing Export Certification and Regionalization Programmes
2017 International Logistics Meeting (ILM)
SAE battery safety standards committee UPDATE January 23, 2019
The Army Maintenance Program at the Platoon/Section Level
Unit Terminal Objective
RADHAZ Joint Spectrum Center E3 & Spectrum Engineering Division, OS35
Presentation transcript:

CAD/PAD Ordnance Assessment (OA) & Surveillance Jeffrey Watts NSWC IHEODTD CAD/PAD Ordnance Assessment 8 April 2017

Overview Purpose Importance of OA Program Background OA Process Steps Summary Sample Firings Questions

Purpose The CAD and PAD Ordnance Assessment (OA) programs assess the quality, reliability, and serviceability of all CAD/PADs to determine if any deficiencies have occurred as a result of aging and/or environmental conditions. What is a CAD? What is a PAD? Cartridge Actuated Device (CAD): Provides the means of releasing/controlling potential/chemical energy by a discrete cartridge and/ or to harness this energy to accomplish a specific work function. Propellant Actuated Device (PAD): A device which provides the means of releasing potential/chemical energy for propulsion and harnessing this energy to accomplish work. Talk types of CADs/PADs

Importance of OA Verifies CADs and PADs are working within the requirements of their intended systems (Aircraft, Weapons, Life support) OA has revealed catastrophic failures, stabilizer depletion, and performance degradation of end-items. Successful evaluations benefit end-users Validate current life Determine if service life deserves increase/decrease Provides consistent evaluation where more than 1 vendor exists Differences in test methods/techniques Different acceptance parameters Different end-item internal designs

Supported Sponsors Programs are currently conducted for: Naval Sea Systems Command Naval Air Systems Command US Air Force US Army NASA FMS Other sponsors (when requested and funded) On average, NSWC IHEODTD conducts 60-70 new OAs yearly

Test Considerations Emphasis is placed on items that have been installed into their intended applications and associated environmental conditions. Representative of the current fleet population Manufacturers and Production Lots Total Ages Also considered: CAD/PAD design or production changes Aircraft configuration changes Material performance / reliability level Logistics needs

Test Frequency New items introduced to the fleet are typically tested 3 years after fleet introduction Subsequent tests 3 year intervals for life support 5 year intervals for aerial target, stores release, and fire extinguisher items (if needed) Out-Year Test Plan reviewed annually Obsolete aircraft or component design Susceptible items New items qualified

Program Controls Sample Availability OA requirement guide/ Out-year Test Plan Item test directives Individual test costs / Funding Complexity of CAD / PAD Types and number of tests to be performed Number of Test Samples Test fixture and procedure availability Stabilizer testing

CAD/PAD sample storage magazine Acquiring Samples Annual sample requirement to Fleet Sample Acquisition initiated at least 1 year in advance Identified by DODIC for upcoming year Administrative Naval Message NSWC IHEODTD rework stock Coordinated with Naval Operations Logistics Support Center (NOLSC) A good OA depends on a good sample A good sample is determined by what we get back from the fleet A quality sample boosts confidence in the test results Fleet Rework Stock Stock Points CAD/PAD sample storage magazine

New Fleet Return Process Automated System Currently only for US Marine Corp., with goal of incorporating all customers Allows specific lots and serial numbers to be identified and pulled directly from fleet Items can be chosen to minimize impact on fleet Enables acquiring samples of interest Past testing issues Extreme service environments Helps determine the worst case and better define the limits of the unit When items are flagged for return, fleet is notified that the item is desired for OA testing Alerted to replace item during scheduled maintenance

OA Process Steps Visual Inspection X-Ray Inspection Non-Destructive Testing (NDT) Visual Inspection Electrical Resistance X-Ray Inspection Hermetic Seal Leak Photo credit: NSWC IHEODTD, Dept E Photo credit: NSWC IHEODTD, Dept E Visual Inspection X-Rays: Voids, cracks, potential environmental impacts X-Ray Inspection

Destructive Testing Normal Conditioning Temperatures CAD: -65, 70, 165, 200oF (-54, 21, 73, 93oC) PAD: -65, -40, 70, 165oF (-54, -40, 21, 73oC) Test Procedures & Fixtures Same as original Lot Acceptance Tests (LAT) in order to maintain commonality. Fixtures designed to simulate end item use or configuration Typical Specification Parameters CADs: Pressure, Time to Maximum Pressure, Thrust, Detonation Velocity, Delay Times, Acceleration, etc… PADs: Thrust, Impulse Acceleration, Dynamic Response Index (DRI), Multi-axial Dynamic Response Criteria (MDRC)

Destructive Testing Example: DODIC M507 (F-4 / EA-6B Drogue Gun Cartridge) specification parameters Ignition Delay Velocity Magnetic Coils Test Fixture Air Solenoid

Statistical Analysis Generated data is compared to LAT and prior OA test data. Plotted as a function of total age and installed time. Reliability Statistics Functional: Performance within specification Catastrophic: Ability of item to complete the firing cycle when initiated. N – Number of samples N’ - Effective sample size Y - mean Se – Standard deviation

Engineering Decisions Does data represent the current fleet population? Sample Quality Safe to store and handle at current lives? Propellant Stability Reliable? Performance within required limits? Statistical Analysis Effects of Fleet environment? NDT and Ballistic Testing Life Determination Quality Sample + Statistical Performance + Aging Trends

Final Report Includes all test data, statistical analysis, and established life determination. Finalized and approved DoD reports are uploaded to official government systems. Reports available through appropriate request process. Foreign Military Sales (FMS) Worker Joint Program Office (JPO)

Ensures the safety of our Warfighters! Summary Ordnance Assessment ensures the safety and reliability of CADs and PADs Quality of test depends on the quality of the samples New automated fleet return system will give us the good sample for a great OA. Ensures the safety of our Warfighters!

T-6 Canopy Facture

F-16 ACES II Ejection Seat CKU-5 F-16 ACES II Ejection Seat Total burn time is about 0.6 secs

Questions?