Town of Brighton, Department of Public Works

Slides:



Advertisements
Similar presentations
Dollarton Highway Realignment Project District of North Vancouver May 12, 2006.
Advertisements

2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
6 th Street Water Main And Street Reconstruction 2013.
Public Works Jack Petkus, Director Informational Overview.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Sanitary Engineering Lecture 16
Preventing Nonpoint Source Pollution
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Cornell University Storm Water Utility Presentation to the Water Resources Council --- November 17, 2014.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
LEQ: How can I determine watershed patterns and their divides on a map? Lesson Key terms: watershed, drainage basin, tributary, dendritic, elevation,
Lake Raleigh Wetland Creation Feasibility Study NC State Centennial Campus Melanie Carter, Jennifer Burdette, Amanda Jones.
Bath and North East Somerset – The place to live, work and visit Local Flood Representative Meeting 08 October 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Systems mitigate risks Risks not eliminated Public Works: Prepared Annual valve testing Ongoing dam infrastructure improvement program.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
Metro Boston South/West Regional Multi-Hazard Mitigation Plan Medfield Annex Board of Selectmen Public Meeting April 7, 2008 Joseph Domelowicz Jr. Martin.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
165 Partners, LLC. ALR Westgate Development-The Landings Russell County August 30, 2011 DP.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Stormwater Management
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
2nd Street Drainage and Paving Improvements
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Village of east aurora sycamore street water improvements
Welcome to the Libertyville Stormwater Master Plan Open House
Otter Tail County Drainage Ditches #5, #68 and #36
Sewer System Presentation
Jefferson County SA Red Rocks Site Approval
ROAD HAZARD ASSESSMENT
General Road Construction Information
Infrastructure Investment Needs
Florida Gas Transmission Mainline Hydrostatic Test
Environmentally sensitive areas
Griffith Park Fire Draft Recovery Plan May 30, 2007
107th & 110th Avenue North Public Utilities Renewal Projects
City of Bloomfield Hills
Florida Gas Transmission Mainline Hydrostatic Test
IA 122 RECONSTRUCTION PRE-BID MEETING
Babcock Basin-Design Phase
Measure A Financial Oversight Committee August 7, 2013
WENDELL PARK STORMWATER IMPROVEMENTS
SE 12th Street Roadway Improvements February 8, 2005.
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
Site Design •Project Site context Module 3: •Site Analysis
Site Plan Requirements
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
RELIABLE, & AFFORDABLE ENERGY SOLUTIONS
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
Welcome to the Stormwater & Sustainability Branch
Meadow Lane – Brandon Road Improvements Welcome!
Walker Street Reconstruction Project 25% Design Public Hearing
Environmentally sensitive areas
Robincrest/Elmgate/ Linneman Improvements Welcome!
Monterey County Project Report for Measure X Expenditures
Design and Engineering Services
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Larimer County: engineering
Regional Stormwater 2016 Operations, Maintenance, & Projects
Presentation transcript:

West Brighton Drainage Improvements Information Meeting November 19, 2012 Town of Brighton, Department of Public Works Mike Guyon P.E., Town Engineer Eric Mineker, Engineering Assistant

West Brighton Drainage Improvements Intent Informational Meeting Q&A from last meeting Drainage Improvements: Delaware Avenue Remington Parkway Riverside Drive Bronx Drive Comments/Questions Final Comment Period December 20th Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Q&A #10 Delaware Avenue states that the CB on East River Road needs to be cleaned out East River Road is a Monroe County road. As such, Monroe County has been contacted to maintain or repair storm inlets along East River Road. Contact info is available on their website. Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Q&A Does the project include cleaning the ditch similar to the cleaning that was completed in the 90’s? Monroe County conducted a survey of the ditch in February 2006. Further analysis of the drainage ditch concluded that reconstruction or maintenance in this area would be ineffective to improve the roadway drainage because the topography in the area is relatively flat. Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Q&A Where does the water go from Delaware Ave.? All stormwater from Delaware Ave. ends up in the Genesee River. East side of the street drains into Remington Creek and through the drainage system into the River. West side through the drainage system into and outlets into the Genesee River Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Q&A Who owns the drainage ditch along the railroad? The majority of the ditch is located in a designated wetland area and the State or Federal agencies have jurisdiction. The portion that is not in the wetlands is in the railroad Right-of-Way which is owned by CSX. Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Q&A The ditch along the railroad needs to be cleaned and maintained to keep drainage flowing towards river The Town contacted CSX. Several months of email and phone exchanges finally resulted in an agreement. CSX has removed and properly disposed of the fallen trees, trash, and vegetative debris from the ditch. This work was completed the week of August 13th. Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Q&A Can the elevation of the Genesee River be lowered to facilitate better drainage? The water level is controlled by the Court Street Dam. The Court Street Dam functions to regulate water levels during navigation season and to furnish water for the hydroelectric plant. The Dam is regulated in conjunction with the Army Corps of Engineers. Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Q&A Will sanitary sewers be extended to Bronx Drive, Riverside Drive, Remington Parkway, and Delaware Drive? A Sanitary Sewer Study is in progress for West Brighton. A plan to accommodate the greater West Brighton area with access to the Brighton Consolidated sewer district will require a financial commitment by all beneficiaries of these district extensions. Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Project Area N Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Objective Improve Road Drainage Perform Roadside Ditch Maintenance Repair/Replace Deficient Storm Sewer as Necessary Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Design Issues Floodplain Majority of the neighborhood Flat or nearly flat land near a stream or river Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Design Issues, (continued) Wetlands Land that is saturated with water NYS Wetland Federal Wetland Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Design Issues, (continued) Topography Monroe County LIDAR Very flat 2’ of natural elevation change or less Town of Brighton West Brighton Drainage Improvements November 19, 2012 14

West Brighton Drainage Improvements Design Issues, (continued) Soils USDA Map B/D to the West C/D to the East Do not drain High water table Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Design Issues, (continued) Trees Channel Elevations Outlet Elevations Utilities Gas Main Water Main Electric Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Proposed Improvements General Re-Grade Existing Road Side Ditches (6) Remove debris and large branches Infrastructure 30+ years old Heave – freeze/thaw Replace/Repair Storm Sewer Correct the slope Replace/Repair Catch Basins Alter elevations to accommodate improvements Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Site Specific Improvements Delaware Avenue Remington Parkway Riverside Drive Bronx Avenue Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Delaware Avenue Proposed ditch cleaning Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Delaware Avenue Proposed ditch cleaning along north ditch Pipe removal along the south side Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Remington Parkway Propose two catch basins and pipe under three driveways to connect into existing catch basin Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Remington Parkway Propose new driveway culverts and re-grade roadside ditch, D-3 Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Riverside Drive Modify existing catch basin and replace pipes Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Bronx Drive Clean and establish ditch, D-6. Remove existing concrete bollards. Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Bronx Drive Install catch basin and pipe under driveway Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Drainage Map Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Project Schedule Final Comment Period December 20, 2012 Phone Email Website Begin Construction winter 2013 Town of Brighton West Brighton Drainage Improvements November 19, 2012

West Brighton Drainage Improvements Question/Comments Mike Guyon, P.E., Town Engineer mike.guyon@townofbrighton.org 784-5225 Eric Mineker, Engineering Assistant eric.mineker@townofbrighton.org 784-5222 Town of Brighton West Brighton Drainage Improvements November 19, 2012