Midpoint Project Review P10454 VAD Test Loop

Slides:



Advertisements
Similar presentations
11022 Transcutaneous Signal Transmission for LVAD February 18, 2011 Yevgeniy Popovskiy, Vince Antonicelli, Craig LaMendola, Chrystal Andreozzi.
Advertisements

Dennis Prentice – Project Manager (ME) Anthony Culotta – Mechanical Engineer Jason Nichols – Mechanical Engineer Belinda Segui – Electrical Engineer Sponsor/Advisor:
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
The Team Lincoln Cummings (IE) – Project Manager Joe Calkins (ME) – Chief Engineer Mark Fazzio (ME) – Technical Writer Allison Studley (ME) – Minutes.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Practical Process Control Using Control Station
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 Presentation:  Work Breakdown Structure.
Experimental Design Fr. Clinic II Dr. J. W. Everett.
EDGE™ Project Status Update PYYNNN – Project Title Here DPM Student Presenter 1 (Dept) DPM Student Presenter 2 (Dept) DPM Student Presenter 3 (Dept) USE.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Team Members: Bryan McCormick (ME) Andy Freedman (ME) John Kreuder (ME) Ken McLoud (ME) Jon Holdsworth (EE) Gabriela Santa Cruz (IE) Thermoelectric Module.
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
EDGE™ Project Status Update P09141 – Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
Dennis Prentice – Project Manager (ME) Anthony Culotta – Mechanical Engineer Jason Nichols – Mechanical Engineer Belinda Segui – Electrical Engineer Sponsor/Advisor:
Michelle Bard (ME) Alexander Ship (ME) David Monahan (ME) Kristin Gagliardi (ME) October 12, 2009.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 – End Of Day:  Progress Update  Concept.
Detailed Design Review of Magnetic Field Centering Device Project # P08028 “Develop a Design and Methodology to Ensure the Concentricity between the Magnetic.
Jon Klein Project Manager Kyle Menges Technical Lead Priya Narasimhan Electrical Engineer Julie Coggshal Industrial and Systems Engineer Christine Lowry.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
Mechanical Engineers: Brian Church Tyler Breitung Michael Oplinger Electrical Engineers: Anthony Salmin Ross Bluth Stephen Mroz Sponsor: Dr. Roman Press.
Hydronic Mechanical Controls
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
The Cooling System.
HVAC523 Circulator Pumps.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
Erik Simpanen September 27 th, 2011 BME 281. Heart Disease  A generic term for referring to numerous different forms of sicknesses that effect the heart.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Volume melted in batch >= 20 gallons Flow Rate >= 50 lbs/hr Width
Air Circulation Considerations for Heat Treatments Ole Dosland Technical Training Director.
Nick Dominesey Matthew Myers Michael Edson Ellie Sanford Chris Smith Jason Inman.
Alex Gee Jon Locke Joe Cooper Kylie Rhoades Clara Echavarria Ice Energy Extraction.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
Human Biology Week 1. How does the body get so many individual cells to work together so perfectly? You can begin to answer this question by studying.
Final Presentation Senior Design II November 19, 2013 MyBand Fitness [1]
Jon KleinISEProject Manager Nguyen VuMETechnical Lead (MSD1) Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer.
Mobile EKG Sensor Senior Design May0530 ABSTRACT PROJECT REQUIREMENTS The goal of this project is to develop a method of collecting heart rates using Vernier’s.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall.
The Cooling System.
Nanofluidic Characterization David Sharp David West Justin Davis.
P15051: Robotic Eye Final Review TIM O’HEARNANDREW DROGALISJORGE GONZALEZ KATIE HARDY DANIEL WEBSTER.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Abstract Keeping multiple children safe and accounted for can be a daunting task. When someone loses track of a child, even for a little while, anxiety.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
The C.I. Engines Fuel System  The C.I. engine demands that the fuel supplied is –  Timed to inject when the piston is near the end of the compression.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Introduction Problem Statement GI Bleeds in patients with LVADs is significantly associated morbidity and can threaten a patient's life as well as their.
Maintenance of a Vehicle’s Cooling System. Regular maintenance of a vehicle's cooling system is important to keep the vehicle running properly and to.
Turbomachinery Flow Visualization P08453
The Integumentary System
Concept Level Project Plan P08008 – ArcWorks Process Improvement
End of DPM Presentation P08405—Novel Materials Technology
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
P10021 – Miniaturization Team
Right Move, Right Place, Right Time
HEMODYNAMIC SIMULATOR II P09026
Auto Upkeep Basic Car Care, Maintenance, and Repair (2nd Edition)
Final Project Review P09006 – Upper Extremity Exerciser
Active Reciprocating Compressor Valve Assembly P16452
Project Readiness Review P10029 – Air Muscle Artificial Limb
Project Status Update P09023 – Air Muscle Artificial Limb Next Generation Jim Breunig (ME)
Project Status Update PYYNNN – Project Title Here
Final Status Update P09006 – Upper Extremity Exerciser
Final Project Plan P09004 – Eye Movement Tracking Device
LVAD Wireless Power Transfer Test Rig
P12022: Wireless Power Transmission Device Test Rig
Presentation transcript:

Midpoint Project Review P10454 VAD Test Loop Alex Moulton Mechanical Engineer BS/ME

Project Information Project Name: -----------VAD Test Loop Project Number: --------P10454 Project Family: ----------P09454, P09021 Start Term: ---------------Fall 20091 End Term: ----------------Winter 20092 Track: ----------------------Assistive Devices and Bioengineering Faculty Guide: ----------Dr. Steven Day Technical Advisor: ----Ed Hanzlik Primary Customer: ----Dresser-Rand Secondary Customer: Dr. Day, SD 20093 teams

Planning Mission Statement Overview: Left Ventricular Assistant Device (LVAD) is designed for people in the future to have mobility while waiting for a heart transplant. The test loop is a model of the human body so we can identify and model the pump characterization curves and to test the damage caused by the LVAD to the blood. Family Goals: Create a more effective/efficient blood circulation loop My Goals: Fit & Finish, decrease it’s size and take care of the flaws/problems the previous teams have been suffering. Future Goals: LVAD eventually be placed in the human body Primary Market: Patients on the heart transplant waiting list, healthy enough for day to day living Stakeholders: Staff and Teachers affiliated with this project, students in present and upcoming senior design teams, and future patients.

Concept Development Customer/Interview/Minutes Interviewed Check List Dr. Day (FG), Ed Hanzlik (TA), Christine Lowry (SD Design Engineer), Jon Klien (SD Project Lead) Compressed Minutes Heating/Cooling, Connection/Leaks, Blood Damage/Coagulation, Sensor Accuracy, Overall Size

Merging of Projects 09021 and 09454 have very similar needs. 454 is researching impellers and diffusers 021’s pump is heating the blood excessively and causing blood damage If 454 can create an impeller that is more efficient and generates less heat 021 will not have nearly the same blood damage that they expect to have with the current impeller.

Concept Development Customers Needs Reason for investment: The current available LVAD is to large and is not portable. Test Loop System will help with the design of the LVAD Produce an LVAD that is small enough to be implanted in the abdomen or be able to attach to ones belt. Direct correlation to the patients quality of life. A new technology that has to be explored.

Assumptions and Constraints Blood is Newtonian No blood damage Drain and fill times must be fast (minutes) Cost must be within budget Continuous use Pressure must be low enough for quick connect usage Temperature must be held constant +/- Data processing must be completed in seconds Flow rate must be around 5 liters/min

Affinity Diagram Maintainability Complexity Compatibility Time Resources LVAD’s continuous use Only a few people know how to use programs Interfaces not hooking up Insufficient Time for completion Conflicting Priorities Cleaning clogs out How to model circulatory system Parts not connecting properly Unrealistic Schedules Changing requirements/needs Keep sensors working Biocompatible Computer programs not working Parts not coming in Bottlenecking Leak Prevention LVAD not much info about People not working well together Overworked Not knowing answers or needs

Voice of the Engineer

Objective Tree

Function of the Project (Test Loop)

House of Quality VOC to VOE Data Processing Portability Protect Blood Pump Blood Size 1 Ease of use 9 Dependability 3 Comfort

Future Plans Quarter Plans Produce an LVAD Test Loop that would Be smaller, more efficient, more effective, and have greater sensor capabilities in each model made. I would like to visit the current 021 team in their review sessions and get more feed back from their design problems. For the final presentation have a conclusion on what needs to be fixed for next year

Latest Meeting Info No Leaks and quick connects have about 3 drops when they are disconnected Draining system works great. Complete drainage in 20 seconds Heater is assembled but not active Pump works great for circulation of the water tank Water tank is used for the heating and cooling of the blood (indirect and slow) Epoxy or grease is needed to seal the o-ring for the glycerin (blood substitute) lid

Sources Edge website 09021 Edge website 09454

Questions?