Turbo Installation Manipulator Final Design Review

Slides:



Advertisements
Similar presentations
Poster & Project Presentations The Robert Gordon University
Advertisements

Limits and Fits.
Word 2007 ® Business and Personal Communication How can Word 2007 help you make complicated documents easier to understand?
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Car Manufacture How organizations use ICT. Objectives Have an understanding of how organizations use ICT. Be able to describe a number of uses, giving.
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Cutting With a Jeweler’s Saw
Pharos University ME 259 Fluid Mechanics for Electrical Students Revision for Mid-Term Exam Dr. A. Shibl.
Northwest Natural 12” Pipeline Integrity Project Team Members Jon Ziring Zack Lemmon Long Nguyen Academic Advisor Faryar Etesami NWN Sponsor Advisors Ross.
ATK Automated Bullet/Case Loading University of Idaho, Mechanical Engineering Dept. Team FMJ Chris Doudy, Ryan Kahre, Adriana Foreman, Ryan Bowen, Jordan.
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
Team Dow Electronic Materials Nicholas Bishop, Jessica Harrington, Rachael Lutchmedial, Alexander Stachnik, Anthony Vacaro. Overview Background Information.
CLIENT: SPECIALIZED TRAINING FOR ADULT REHABILITATION, INC. (S.T.A.R.T.) CONTACT: KATHY BAUMAN, EXECUTIVE DIRECTOR TEAM MEMBERS: BEN BLAIR LINDEN EASON.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Doing The Drafting Thing IE 1225 R. Lindeke. See next slide for variations from text! Lets begin with 1-2 “Box Part” – with some Variants & Dimensions!
Team K-TRON Team Members: Ryan Vroom Geoff Cunningham Trevor McClenathan Brendan Tighe.
123 Making a Poster is as easy as 1, 2, 3 Making a Poster is as easy as 1, 2, 3 Esbern Holmes Define Your Audience Effective communication.
Brazing Saddles ( Team 15) Client: Parker-Hannifin Faculty Mentor: Dr. Kevin Kochersberger Faculty Coordinator: Dr. Paul Stiebitz Preliminary Design Report.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Installation. Indoor Unit Installation Typical Installation.
Group 1: Material Testing Device Jobe Dyson Brie Witherspoon John Chandler Brett Newstead.
Launching Station for Sensor Deployment Team Members: Brian Molnar, Shawn McGrady, Joe Liquore, Ken Schroeder Faculty Advisor: Dr. Jeff Faculty Advisor:
EDGE™ Preparing a Poster for a Publication and Display Prepared by Edward Hensel (ME) Elizabeth DeBartolo (ME) Copyright © 2005 Rochester Institute of.
Lesson 8- Assemblies. –Are a grouping of parts –Have orientation and alignment specified –Are Three dimensional Assemblies let you –See if the parts will.
Test station for ALICE pixel chip Confidential Information COMMENT by Y. Kwon Strategy : make sure commitment can be achieved before main commitment to.
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Sponsor: Fraunhofer Advisor: Dr. Michael Keefe Innovative Lifting.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Team Crush Phase II Completion Ryan Gonzalez Brent Rieman Matt Yankow Alec Byrum Patrick David Amanda Koch John Ranalli Mark Kintner Kelly Murphy Spencer.
University of Connecticut MECHANICAL ENGINEERING Project Statement.
1 ME 462 Capstone Design Sponsor: Remy International Inc. IUPUI Design Team #1 Proposal Presentation May 3 rd 2007 Matt Schonauer Ibraheem Nezamuddin Martha.
Ejector with Pad ZHP Series Confidential Internal use onlyConfidentialConfidential.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Dual-Use Wideband Microphone System
TURBO REBUILD TURBO REBUILD. Step 1 Step 1: - Using the small pick or screwdriver, walk the tiny snap ring back into the groove on both the compressor.
Plasma Sense Amplifier
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Vicon subsoiler - Terra PL Product Information 2013.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
FLUID FLOW FOR CHEMICAL ENGINEERING Dr Mohd Azmier Ahmad Tel: +60 (4) EKC 212 CHAPTER 8 (PART 2) TRANSPORTATION SYSTEM.
Mezzanine Build Plans.
Continental Automotive Fault Data Retriever
Overview control systems examples of control systems diagrams
Sponsor: H. Thomas Dickey & SENSCO Faculty advisor: Dr. Harold stern
Planetary Lander PDR Team Name
Machine Vision Burr Detection
#2.7: SDR Band Output Validation Device
September 9, 2013 Quiz summary Team Meetings Honors Course
Project Statement ..
2.10: Hexiwear IoT Sensor System
DEVICE FOR THE IMPLANTATION OF NEURAL ELECTRODE ARRAYS
OBJECTIVES State the principles of vacuum and the vacuum booster theory. Discuss how a vacuum brake booster operates. Discuss the vacuum booster operation.
Industrial Skills Fasteners & Hardware.
2.12: Power Integration for a Solar Car
P08002-Automated Parallel Bars
Duct Insulation Attachment Team
Assembly instructions for M-K all bolt together hoppercone kit.
Flag Installation on Roll-up Signs
Flag Installation on Roll-up Signs
Safety on the Job Insert an on the job safety tip/warning/hazard in the boxes. The box will expand as you type. You can adjust the font size/color/type.
Nanofluidic Characterization
Hexiwear Watch Alert System
Universal Parallel Gripper
Active Reciprocating Compressor Valve Assembly P16452
Go to =>
Designing and Manufacturing of a hand operated plastic injection moulding machine envisioned for the mesoscale range. Freddy Travieso
Simulated Assembly Line and Processing Workstation
Engineering Design Process
Presentation transcript:

Turbo Installation Manipulator Final Design Review Sponsor: Brent E. Nelson with Caterpillar Inc. Faculty Advisor: Dr. Casey Smith

Project Overview Currently, the system involves interchangeable pucks. The main goal of our project is to make sure the wrong puck cannot be installed. To do this we have designed a one size fits all device to replace the pucks. State the problem and the project in clear terms. Use a graphic if at all possible.

Project Motivation The problem: Pucks do not have a footprint or designated area Each puck is sized to only a few turbo part numbers If no stretch goals then delete the text box on the right, and expand the one on the left. DO NOT ELABORATE ON THE GOALS, JUST STATE THEM QUICKLY AND MOVE ON!!!

Top-Level Block Diagram Engine arrives at work station Team member uses GCI arm to lift the turbo Team member moves turbo to the engine Turbo is attached to engine and released from arm. Put in a readable top-level block diagram to show what your project does and how it fits in to the system.

Design-Level Block Diagram Swing Arm closed and pressure plate depressed Moves GCI arm to turbo Gripper is expanded pneumatically Put in a block diagram – or flow chart – of your design. Highlight in yellow the blocks that the team will be designing. Turbo is moved to the engine and installed GCI arm is moved back to the home Release the turbo

Results Air bladder design was dropped and a new mechanical linear actuator gripper was designed and prototyped Air logic was incorporated with PLC logic Concisely state the feature/approach changes made since the Initial Design Review. Keep it a minute or less.

Results Cont. Prototype provides proof of concept (Adjustable to all diameter ranges) Max Diameter of Turbos: 137mm Min Diameter of Turbos : 65mm Max Diameter of Gripper: 148mm Min Diameter of Gripper: 62mm Fits depth of all turbos: 10-25mm Insert a tabular form of Section 4.1 from the Characterization Report.

Future Work Changes Reasoning Use of nuts, bolts, and sleeves to hold the elements of the gripper together. This would make the device more stable and reliable Prototype design using a metal or high strength material Prototype would be a proof of concept using a new manufacturing method. Modify particular dimensions of gripper for manufacturing into a new material This would need to be done in order to satisfy metal manufacturing which is completed using a different process as well as strength of material Move the holes in which the nuts and bolts will be inserted, farther away from any edges Allow for less force to be exerted towards breaking points. Design a pressure plate Plate would control a sensor that would not expand until gripper is a minimum distance inside the turbo Insert a tabular form of Section 4.3 from the Characterization Report.

Acknowledgments Brent Nelson – Caterpillar Inc. Ryan Melvin – Caterpillar Inc. Dr. Casey Smith – Faculty Advisor Dr. Compeau Create a bulletized version of Section 13 from the Final (2nd Semester) Report.