Linac4-PSB 160 MeV connection readiness review

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Status Report of the PSB Half-Sector and Stripping Foil Test in L4T
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
Vacuum sectorisation H- Injection Some history Wim Weterings
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Wim Weterings Remy Noulibos
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
ABT-EC EYETS Activities 2nd reports
PS / Booster septa control
LIU – EVM status and next steps
AFC 2017 (and 2018) AFC timeline:
Update on the Critical Path of the PS Booster Schedule for the EYETS
J.-L. Sanchez Alvarez(PSB-EIC)
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
LINAC4 ADVISORY COMMITTEE
TE-MSC activities in SPS during LS2
Francois and Lau EATM 17 July 2012
EYETS David Hay EN-OSS.
BA6 – crab cavity activities in EYETS
LIU / HL-LHC Cost and Schedule Review
Risk Assessment / Mitigation / Spares
EC Activities Status for LIU September 2017
LIU – EVM status and next steps
AD consolidation activities in LS2
SPS - EYETS 2016/17 Vacuum systems planning
Configuration Management and Layout Database ELENA Project
LIU–PLI report LIU PSB meeting.
Planning and Installation
EC Activities Status for the LIU
LIU-PSB Status and Outlook
TE-ABT Activities for LS2
Status of the BI Work Package in the LIU-PSB frame
prepared by R.A.Barlow 30/056/2016
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS PS + PS SWY + TT2 Facility Coordinator:
TE-MSC activities in SPS during YETS
BE-CO Activities for PSB
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
LIU-SPS review for BI (no BWS)
LINAC 3 Meeting ICL machines Injectors
Status of the BI Work Package in the LIU-PSB frame
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Linac4-PSB 160 MeV connection readiness review Tuesday 30 August 2016 30 August 2016 Linac4-PSB 160 MeV connection readiness review

TE-ABT Contents: Equipment dismantling Equipment installation Wim Weterings Contents: Equipment dismantling Equipment installation Risks / Mitigation Additional information Summary 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Wim Weterings - TE/ABT

Equipment dismantling System Equipment Estimated activation Cooldown requested + duration Particular requests for removal Storage / Waste DEC Done Updates needed Group ressource Remarks ECR/SRR EDMS BI.DIS Magnet 150µSv/h@40cm 6wks Buffer Zone Waste Yes Database / Integration / Controls … FPS   1518483 PFN Controls EC BI.SMV 200µSv/h@40cm SE 1561343 Powering EPC responsibility 1541748 SMH1L1 500µSv/h@40cm Replaced by BSW magnets 1422358 Cooling station KSW1L1 Obsolete KSW2L1 20µSv/h@40cm 1wks ? Replaced by 16L4 magnet KSW16L1 70µSv/h@40cm 2wks ? install new magnet 1422350 KSW16L4 Move to 2L1 position, install new magnet Delays new equipment installation High Activation Area t.b.c. t.b.c. t.b.c. Equipment Re-used 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Wim Weterings - TE/ABT

Equipment installation System Equipment Quantity Readiness by December 2016 Installation duration (in hours) Specific EN/HE Installation requests Cooling and Ventilation requests EN/EL needs Controls needs (FESA, BIS, Expert) Individual System Tests HW commissioning duration + Access condition Beam commisionning duration Group ressource EDMS ECR / SRR Number Number of spares Remarks Water cooling Ventilation requests Functional Specification / Engineering Specification Number DIC Done Other information BI.DIS Magnet 1 Yes 8 Transport / Lifting   1454374 2 days / tunnel FPS 1518483 PFN 3 Other information: Ready, but coils heating issue 3*60 Transport Remove old first 5 In situe spare Controls 11 11*24 1339372 FESA,BIS, EXPERT 30 30 days / B361 5 days EC Beam commissioning to H0 dump BI.SMV 24 Exist 1170734 SE 1561343 2 Spare magnets from 2018 Powering Other information: EPC responsibility 1541748 1324759 1 day / B361 BI.BSW 16 16*4 1157402 4 days / tunnel 1422358 4+2+2+4 Lifting Jig required - Survey 1423528 1560692 Vacuum Other information: Vacuum chambers critical path included in magnets 1277821 1317187 2+2+2+4 2 BWS1, 2 BSW2, 2 BSW3, 4 BSW4 2 day / B361 No room for new cables See Mitigation Reduced if commissioned in Lab Delivery 09/2016 required 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Wim Weterings - TE/ABT

Equipment installation System Equipment Quantity Readiness by December 2016 Installation duration (in hours) Specific EN/HE Installation requests Cooling and Ventilation requests EN/EL needs Controls needs (FESA, BIS, Expert) Individual System Tests HW commissioning duration + Access condition Beam commisionning duration Group ressource EDMS ECR / SRR Number Number of spares Remarks Water cooling Ventilation requests Functional Specification / Engineering Specification Number DIC Done Other information BI.KSW Magnet 3 Yes 3*6 Transport / Lifting   1 2 days / tunnel FPS 1422350 move 16L1 to 2L1, new 16L1, 16L4 Powering 4 4*1 Transport 1451920 2 5 days Beam commissioning to H0 dump Controls 1324759 FESA,BIS, EXPERT 10 days / B361 10 days EC 3×400A, 3×40A, 1×controls Basic control software functionality end 2016. Work to continue in 2017. BI.TSTR Loader 4*4 1108941 1 days / tunnel 1422358 Currently Problems to get loaders RGA approved Foil loader installed @ end, just before pump down. 5 5*4 1569710 2 days / B361 Equipment Re-used Development continues 2017 RGA issues to be resolved General Remark; Beam commissioning of BI line will be to the H0 H- dump. 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Wim Weterings - TE/ABT

Risks / Mitigation Point of ‘no-return’ Point of ‘no-return’ Activity / Equipment List of major Risks Mitigation Remarks BI.DIS Reliability, performance: Heating of PFN coils New coil design is being made, improvements continue after installation   BI.SMV Performance: New magnets aperture not compatible 50MeV beam BI.TSTR Reliability and performance: New system without experience Sufficient beam time for HST should allow for 1st experience. Injection region 1L1 Reliability and performance: Removal of SMH septa means no return to proton injection possible Integration accuracy: Injection region very complex and full with mm clearance between equipment Mock-up assembly in building 867 in order to identify most of the possible integration problems Support structure needs to fixed to floor and wall, existing cables on floor could be an obstruction Inspection after EYETS 2016 cabling clearing campaign BI.KSW Performance: Very complex timing-pulse structure. Commissioning is done one waveform at a time. Point of ‘no-return’ Point of ‘no-return’ 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Wim Weterings - TE/ABT

Additional information Strong interdependences with other groups? Injection zone 1L1 → BSW-TSTR (TE-ABT), BLM-BTV (BE-BI), H0H- dump (EN-STI), Vacuum (TE-VSC), Handling (EN-HE), Powering (EN-EL), Cooling (EN-VC), etc. Manpower: requirement for drilling holes in wall and floor for 1L1 Installation. Issues / Concerns: PFN’s and Controls ready ‘just in time’, without fully testing in Lab. 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Wim Weterings - TE/ABT

Summary TE/ABT equipment is expected to be ready for full connection by end 2016 Mock-up assembly 1L1 is ongoing in building 867 Improvements for reliable operation will continue in case of early installation (DIS PFN, KSW controls) Long RP cooldown in the tunnel is delaying the 1L1 installation ABT teams can start working on DIS, SMV, KSW No proton injection possible with new equipment 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Wim Weterings - TE/ABT