Performances of the French synchrotron light source SOLEIL Actions to enhance the reliability of the equipment J.F. Lamarre*, E. Patry X. Delétoille, A.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

1 Amor Nadji January , SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL.
Commissioning & Operation of SOLEIL Jean-Claude Besson – Trieste – WAO 2007 COMMISSIONING & OPERATION OF SOLEIL. J.C. Besson, J.F. Lamarre, A. Bence, X.
Operations and Availability GG3. Key decisions Summary of Key Decisions for the Baseline Design The linac will have two parallel tunnels so that the support.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
1 AMMW2013 workshop 13 d – 15 th of November, 2013 Asset management tools: use and improvement in SOLEIL – P. Betinelli Asset management tools: use and.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
Beam Instrumentation for Orbit Stability I. Pinayev.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
Fourth-Generation Sources at Third-Generation Facilities John W. Lewellen Advanced Photon Source Argonne National Laboratory.
3rd Libera Users Meeting
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
STATUS OF THE SOLEIL RF SYSTEM
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
Ingot Niobium Workshop RF Sources Andrew Kimber 4 th December 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson Science Associates,
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
Improvements to Diamond Light Source RF Amplifiers Peter Marten On behalf of the Diamond RF Group* *also C. Christou, P. Gu, M. Maddock, S. A. Pande, A.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Report Technical Director Storage-Ring-Installation Completed
Preparation Phase of the FAIR Project
Operations Machine Simulator.
Report Technical Director Storage-Ring-Installation Completed
The Survey of the Power Supply Reliability at SSRF
Challenges of Dual Harmonic RF Systems
PETRA III, Status and Upgrade
Machine operation and daily maintenance management in SOLEIL
SOLEIL EXPERIENCE WITH HIGH POWER SOLID STATE AMPLIFIERS
Status of the ASTRID2 facility
Bocheng Jiang SSRF AP group
MPE-PE Section Meeting
Developments of High CW RF Power Solid State Amplifiers at SOLEIL
SOLEIL Operation and Adaptation to the New Common Metrics
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
10 MHz amplifier status G. Favia
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
RF operation of REX-ISOLDE
MAGNET POWER SUPPLIES RELIABILITY IMPROVEMENTS AT SOLEIL
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Machine Operation and Progresses in SSRF
CEPC RF Power Sources System
Timing System GSI R. Bär / U. Krause 15. Feb. 2008
Operation Progress and Upgrade in SSRF
Jim Clarke ASTeC Daresbury Laboratory March 2006
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status of the ASTRID2 RF systems
AVAILABILITY PERFORMANCE
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

Performances of the French synchrotron light source SOLEIL Actions to enhance the reliability of the equipment J.F. Lamarre*, E. Patry X. Delétoille, A. Bence, R. Cuoq, Y. Denis, T Marion, D. Pereira, S. Petit, G. Roux, C. Tournier Synchrotron SOLEIL, Gif-sur-Yvette, France Performances of the French synchrotron light source SOLEIL has been delivering photon beams to the users since January 2007. In constant progress, the number of beam operation hours in 2012 has reached 6 512 hours including a total of 5 328 hours dedicated to the 26 beamlines. Five modes of operation are available for the users and all are in Top-Up injection mode. The maximum beam current provided in Hybrid mode (3 quarters + 1 single high intensity bunch) was raised to 430 mA, while a total current of 500 mA is possible in the uniform mode. In parallel to the constant evolutions of the accelerators, different actions were led in order to enhance the reliability of the equipment (especially power supplies) and to reduce accidental beam losses. Thus 2011 had a record high efficiency of 98.4 % and a MTBF of 47 hours. The very good reliability of the RF solid state amplifiers contributes to these good results, several other facilities migrate to this technology pioneered by SOLEIL. In 2012 was hit by several long term beam interruptions due to electrical power outages and to failures of the cooling systems reducing the beam availability down to 96.1%. Strategy and remedies for improvement have been identified and applied or are in progress. All the filling modes are in Top-Up. In 2012, the multibunch mode has been 100% performed with a hybrid filling pattern, currently fixed to 430 mA. Intensity should be raised up to 450mA during 2013. An average of 24 beamlines a day out of the 26 SOLEIL beamlines uses the beam. The beam is delivered in Top-Up mode, with a reinjection every 4 minutes, the current is maintained better than 0,5%. To stabilize the electron beam to better than 1µm in position and 1 µrad angle, to maintain and control the beam size and the lifetime, irrespectively of the configuration of the 25 insertion devices, 5 feedback systems are running (SOFB, FOFB, FB-Tune, TFB, FB-Coupling). The installation continues to evolve. With the construction of two long beamlines (150 and 200 meters) with two in-vacuum undulators installed on a canted long straight section. Also in progress, the installation of Femto-Slicing which will produce shorter bunches, and whose the commissioning is scheduled in 2013. RF System After 6 years of operation, the innovative design of Solid State Amplifier (SSA), which was developed in house, has proved itself and demonstrated that it is an attractive alternative to the vacuum tube amplifiers, featuring an outstanding reliability and a MTBF > 1 year. A transfer of technology agreement was concluded with an industrial company. ESRF has already adopted this technology at 352 MHz. Amplifiers at 500 MHz are being built for ThomX (50 kW) and SESAME (80 kW). Prototypes of amplifier modules at 176 MHz and 200 MHz are also developed. Power Supplies: first cause of failures in 2007 and 2008. Actions have been taken to improve their reliability such as changing components and purchasing additional spares. A new dipole power-supply, has been in-house developed and is currently undergoing tests. Switching between power-supplies takes less than 5 minutes. Another spare power supply is under development to be used in case of failure of one storage ring sextupole power supply (10) or dipole power supply of the booster to storage ring transfer line. After suffering from quite a few IGBT explosions on 3Hz Booster dipole power supplies, a campaign to upgrade IGBT class (400A to 600A) as the first step. But was not sufficient, the number of operating cycles is larger than expected. A redesign of these units is progressing, especially by oversizing the IGBT modules and by improving the cooling system. The solid state amplifier consists in combination of a large number of 330 W elementary modules. 4 x 724 modules -> 4 x 180 kW ( Storage Ring ) 1 x 147 modules -> 1 x 35 kW ( Booster ) Built in-house Spare dipole power supply: 580A / 610V +/- 10ppm Topology based on 2 interleaved step-down converters switching @ 10kHz In the context of preventive maintenance, some solders were redone and some capacitors replaced in the amplifier modules; the progressive replacement of the actual transistors by more robust ones is scheduled in a second stage. Spare compressed air An interruption, for few minutes, of the superconducting RF cavities liquefier generates their unavailability during several hours. Equipment have been redundant like a spare compressor and the installation of a compressed-air system based on simple nitrogen bottles. Power outage Partial power outage and power cuts are a leading cause of breakdowns. Despite increasingly strict enforcement of storage ring RF system and power-supplies, beam losses due to power outages are continually growing. Even more concerning is the impact of power cuts, 3 in 2012, which causes an average beam interruption of 10 hours. To alleviate this issues some technical solutions are explored, and using the experience of other facilities. Machine protection system The introduction of a delay on infrared mirrors protection system has reduce by 5 the beam losses due to erratic beam swellings. Since then a delay has been extended to other interlock system equipment such as BPM, flow meters, thermocouples and ion pumps. Spike BPM Cooling system By the very end of 2012, SOLEIL suffered from its longest failure, nearly 60 hours without beam. A tap located on the beamlines cooling system broke. Because of PVC tubing we had to wait until the glue used to repair dried. In 2012, there were more than 100 hours of outage due to cooling system and air compressed problems. Several correctives actions have been identified and launched. An audit of the facility will be performed soon. Number of beam instability losses between 2010 and 2012 47 beam losses in 2010, 19 beam losses in 2011 and 9 beam losses in 2012 Introduction of a delay on triggers of IR mirrors TC Balance-Sheet in 2012 In 2012, after utilities and power supplies, RF system was the third cause of failures. Most of these failures were concentrated during 2 consecutive weeks, caused by bad contacts on cavity diagnostic cables, which was difficult to identify. MTBF is constantly increasing. However, after very good results in 2011, efficiency and MTTR outright declined during 2012. If we remove breakdowns due to the electric grid and utilities, 2012 results should have been: Efficiency = 98.9%, MTBF= 75h, MTTR=00h50. *: jean-francois.lamarre@synchrotron-soleil.fr