Performance Based Communication and Surveillance (PBCS)

Slides:



Advertisements
Similar presentations
Aircraft Maintenance Records
Advertisements

RECORD KEEPING Cooperative Development of Operational
AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
Federal Aviation Administration GOLD Introduction By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar GOLD.
Introduction to Navigation Specifications
Planning and implementation
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
Karen T. Carey & Dan Wakelee. Background  Potential as tools for research and teaching  Design, selection, operation & analyses of sensor data  Cover.
Federal Aviation Administration Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Date:13-14 May 2013.
MAJOR REPAIRS AND ALTERATIONS
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 WP02: Timing Errors in Oakland OCA.
Federal Aviation Administration Performance-Based Communication and Surveillance (PBCS) Introductory remarks Date:13-14 May 2013 Presented to:ICAO Asia-Pacific.
PBCS Workshop Bangkok, Thailand, May, 2013
APAC PBN Seminar F.LECAT (ICAO)
PBN OVERSIGHT IN AUSTRALIA
ICAO SARPS and Guidance Material
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
Federal Aviation Administration (FAA) Presented by Jim Gardner, AFS-200 Proposed Amendment To Annex 6, Part I International Commercial Transport – Aeroplanes.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
Owner/Operator Responsibilities in Aircraft Maintenance & TSO’s and PMA’s Aircraft Owners and Operators Jim Niehoff – FAA Safety Team.
Information requested following SMS implementation presentation.
Federal Aviation Administration Performance-Based Communication and Surveillance (PBCS) Closing remarks Date:13-14 May 2013 Presented to:ICAO Asia-Pacific.
Maintenance Records TIP For additional advice see Dale Carnegie Training® Presentation Guidelines.
Harmonizing AOC & Operations Specifications. April 2008ICAO harmonization of the AOC & Ops Specs Outline Historical and current situation – ICAO Problem.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
U.S./Europe International Aviation Safety Conference By: James Ballough, FAA, and Claude Probst, EASA Date: June 4, 2008 “Global Safety Management: Revolution.
International Civil Aviation Organization May 2013, Bangkok 1 PBCS Workshop May 2013, Bangkok Introduction 1.
Authority Requirements Margit Markus Tallinn, 7 May 2009.
Transition to RNP 4/10 (MNPS to PBN)
APAC PBN Seminar F.LECAT (ICAO)
PARC CWG Update Presented to: SOCM/2 By: Tom Kraft
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA
Global Operational Data Link Document
PBCS Workshop May 2013, Bangkok
Performance-Based Communication and Surveillance (PBCS)
Derivation of RCP/RSP specifications
Oceanic and International Operations
ATS Route and Waypoint Implementation:
Foreign Air Operator Validation & Surveillance Course
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
Global Operational Data Link Document (GOLD)
PBN OVERSIGHT IN AUSTRALIA
GOLD GOLD Introduction Presented to: SOCM/2 Seminar
Performance based communication and surveillance
Performance-Based Communication and Surveillance (PBCS)
AERODROME MANUAL.
Workshop on preparations for ANConf/12 − ASBU methodology
Interpreting RCP/RSP and Monitoring Results
Workshop on preparations for ANConf/12 − ASBU methodology
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
FANS 1/A over Iridium (FOI)
Chapter 4 Aviation Industry Certification Requirements
Oceanic and International Operations
Oceanic and International Operations
Oceanic and International Operations
Department of Civil Aviation Ministry of Information & Communications
Oceanic and International Operations
Foreign Air Operator Validation & Surveillance Course
Oceanic and International Operations
Oceanic and International Operations
EU Food Safety Requirements: - Hygiene of Foodstuffs -
May 2018 HSAC.
Voluntary Safety Programs Presentation
USOAP Continuous Monitoring Approach (CMA) Workshop
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Aerodrome Certification Workshop
Presentation transcript:

Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Presented to: ICAO Asia-Pacific RCP/RSP Workshop (Bangkok, Thailand) By: Tom Kraft (for Trent Bigler) tom.kraft@faa.gov Date: 13-14 May 2013

Introduction ICAO Annex 6, Chapter 7 Advisory Circular AC 120-70B 7 Part Checklist / Job Aid A056 Operations Specification Proposed Additions

Operational authorization requirement ICAO Annex 6, Chapter 7 7.1.3 For flights in defined portions of airspace or on routes where an RCP type has been prescribed, an aeroplane shall, in addition to the requirements specified in 7.1.1: a) be provided with communication equipment which will enable it to operate in accordance with the prescribed RCP type(s); and b) be authorized by the State of the Operator for operations in such airspace

How does the FAA accomplish operator authorization? Advisory Circular (AC) 120-70B Operational Authorization for Use of Data Link Communication System FAA design approval of data link system Revision to CFR 121, 125, 125M 135 Op Specs Revision to CFR 91K M Specs, CFR 91 LOA FAA Job Aid - a 7-part “how to” guide that outlines entire process A056 (data link) Operations Specification

AC 120-70B Applicability – Code of Federal Regulations (CFR) parts 91, 91K, 121, 125, 129 and 135 Describes the process of obtaining Operational Authorization for data link systems, acceptable training and maintenance, and operational polices for use Actions in event of an ATC data link communications event

AC 120-70B Chapter 8 Installation of a data link communication system requires FAA approval of changes to Type Certificate (TC) or Supplemental Type Certificate (STC) Approval of installation does not constitute authorization to use the system Design approval of aircraft data link systems in accordance with AC 20-140B “Guidelines for Design Approval of Aircraft Data Link Communication Systems”

7 Part Checklist / Job Aid Basic Events in data link authorization process Recommended Inspector and Operator actions General Operator information Operator exhibits and documents submitted Content of Operator application Basic pilot procedures Data link maintenance program

A-5a A056 (Data Link) OPS SPEC Revisions needed to A056 OPS SPEC template and associated FAA Orders / ACs to include PBCS

A056 OPS SPEC changes being considered Operator obtains operational authorization, as appropriate, in accordance with National regulations; GOLD and RCP – RSP specifications provide criteria for operations and maintenance Contractual arrangements/service agreements with CSP(s)/SSP(s) Operator demonstrates 6 months of acceptable RCP/RSP performance for the aircraft types in their fleet If substandard performance, ANSP and/or State of the Operator or State of Registry issues corrective action notice Considers severity of the deficiency and magnitude of the change If non-compliance remains after the date indicated in the corrective action notice State of the Operator or State of Registry could remove the RCP [X] – RSP [Y] authorization The operator may still use CPDLC and ADS-C

Conclusion Operational authorization process provides a means for the State of the Operator or State of Registry to fulfill its obligation to ensure that Air Operators maintain and operate aircraft and systems, considering ICAO Annexes Procedures for Air Navigation Services (PANS National Regulations and Airspace requirements (e.g. 7030, AIPs, AICs etc.)