A Proposed Timeline for IEEE ba TG

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Advertisements

Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /0077r1 Submission May 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for May 2013 Notice: This document has been prepared to assist.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
May 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for May 2016] Date.
TGaz Next Generation Positioning Mar Closing Report
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
Month Year IEEE Motions in July, 2016 Plenary
IEEE aj January 2016 Closing Report
Tge draft ballot information
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
TGax March 2017 Closing Report
TGac Documents and Timeline
doc.: IEEE <doc#>
TGaf Waikoloa Closing Report
TGae Closing Report – March 2010
802.11af Liaison Report Date: Authors: March 2011
doc.: IEEE <doc#>
Closing Plenary Meeting Report for SG 100G Group (1/3)
TGae Closing Report – May 2010
IEEE Motions in July Plenary DCN:
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for March 2015] Date.
TGac Status and Timeline
TGaf San Francisco Closing Report
Month Year IEEE Motions in July Plenary DCN:
TGs LA Closing Report Date: Author: January 2011
Submission Title: [ TGs liaison report]
November, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2015]
TGaf San Antonio Closing Report
802.11bd Timeline Date: Authors: January 2019
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2015]
IEEE P Working Group for Wireless Personal Area Networks
TGaf Waikoloa Closing Report
QoSMAN SG Closing Report – Nov 2009
TGu Motions Authors: March 2010 Date: March 2010
Proposed timeline for the Light Communications TG
doc.: IEEE <doc#>
May 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [19 May 2016]
TGu Teleconference Motions
IEEE Revision Timeline
September 2009 Closing Report
TGae Closing Report – July 2010
Timeline for the Light Communications TG
TGm Closing Report – May 2010
2019 March TGba Closing Report
Task Group AY September 2017 Closing Report
Submission Title: TG4m 4TV Closing Report for September 2013
IEEE mc Closing Report for July 2013
TGae Closing Report – July 2011
TGae Closing Report – January 2011
TG 1 November Session Opening Report
Task Group AY May 2016 Closing Report
TGax September 2017 Closing Report
TGu Motions Authors: March 2010 Date: March 2010
TGr Closing Report for March 2008
802.11af Liaison Report Date: Authors: July 2011 Month Year
IEEE aj March Closing Report
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
Submission Title: [ TGs liaison report]
TGae Closing Report – November 2011
IEEE aj May Closing Report
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
TGax November 2017 Closing Report
TGae Closing Report – September 2010
TGaj editor report for Sponsor Ballot
Presentation transcript:

A Proposed Timeline for IEEE 802.11ba TG Month Year doc.: IEEE 802.11-yy/xxxxr0 January 2017 A Proposed Timeline for IEEE 802.11ba TG Date: 2017-01-16 Authors: Osama Aboul-Magd, Huawei Technologies John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 January 2017 Abstract This submission proposes a timeline for the newly formed TG IEEE 802.11ba Osama Aboul-Magd, Huawei Technologies John Doe, Some Company

Some Considerations for the Timeline Month Year doc.: IEEE 802.11-yy/xxxxr0 January 2017 Some Considerations for the Timeline IEEE 802.11ba is aimed toward IoT applications and there is a need for a timely development of an IEEE 802.11 amendment to address the emerging market. Other standard development organizations (SDO) have already published their low-power specifications aimed to address IoT applications, e.g. 3GPP and its NB-IoT, LoRa Alliance, etc. Other non-IEEE 802.11 technologies can be used (and are used) to achieve the WUR function, e.g. bluetooth. Osama Aboul-Magd, Huawei Technologies John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 January 2017 Some Historical Facts 11-07/1952r21 provides various statistics for different IEEE 802.11 amendments. https://mentor.ieee.org/802.11/dcn/07/11-07-1952-21-0000-non- procedural-letter-ballot-results.xls Of interest is how long it takes between the PAR approval and the initial WG LB (draft D1.0) It seems major PHY/MAC amendments require an average of 30 months ….and unfortunately these amendments almost always fail the 1st WG LB, We probably cannot afford to wait 30 months till draft D1.0 Osama Aboul-Magd, Huawei Technologies John Doe, Some Company

A Proposed Timeline January 2017 TG 1st meeting TG Leadership selection Start on TG documents Technical Presentations March 2017 Complete TG documents Start SFD July 2017 Continue with the SFD development November 2017 Draft 0.1 and start CC March 2018 Complete CC comment resolution and prepare draft 1.0 Start WG LB September 2018 Draft 2.0 and Recirculation An aggressive timeline with draft D1.0 be available in about 15 months after the PAR approval Sponsor ballot can potentially start in July 2019 with publication date set at March 2020 Therefore: Need to keep the function requirements to a bare minimum Need to guard against littering the draft with unnecessary features Osama Aboul-Magd, Huawei Technologies

January 2017 Straw Poll Do you agree to adopt the timeline on page 5 as the IEEE 802.11ba TG timeline? Yes: No: Abstain: Osama Aboul-Magd, Huawei Technologies

References January 2017 doc.: IEEE 802.11-yy/xxxxr0 Month Year Osama Aboul-Magd, Huawei Technologies John Doe, Some Company