5708 startup and commissioning

Slides:



Advertisements
Similar presentations
Questions & Answers Eran Perlstein, Customer Support Director.
Advertisements

Basic Jens Neigaard.
© 2010 APM Automation Solutions Ltd. All rights reserved. APM Automation Solutions Ltd. 11 APM Customer Support Technical Training Part 5 Operation & Troubleshooting.
22 March Controller Diagnostics. 22 March Topics Covered: Diagnostics that allows you to check basic controller and reader functionality through.

MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
© 2007 APM Automation Solutions Ltd. All rights reserved. Contact Rubi Dan: APM Automation Solutions Ltd. 11 APM Customer Support Technical.
Mobileye Setup Wizard Version User manual
FireClass FC501. What’s FC501 ? An entry level Triple Circuit Single Loop addressable system featuring Intelli-Zone mapping An “out of the box” panel.
Reference Document1 Noise Cancellation Techniques This presentation is a property of Kaihatsu Techno Centre Pvt. Ltd. This is intended for the restricted.
VGA Solutions 8495 Dalton, Montreal, Quebec, H4T 1V5 Tel: Fax:
Accuracy of Continuous Level Measurement Systems in Dry Bulk Applications and Performance Expectations By Greg DeRudder, Technical Sales Support Manager.
Chapter 22 All About SCSI.
You Can Measure the Benefits… Training Course Introduction to SmartScan.
Training.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
TECHNICAL TRAINING PART 3 COMMUNICATION APM Customer Support May 2011 APM Annual International Partners Conference 1.
GeneXpert Installation and Xpert MTB/RIF Set-up
AccuMax Multi-Point Injection Mechanics
E VERY L IFE H AS A P URPOSE… Chillgard ® L Series Refrigerant Monitors.
Controller Wiring.
Chapter 8 All About SCSI.
You can Measure the Benefits… Training Course SolidScan’s products.
Legacy Remote I/O Upgrade to Ethernet
APM Automation Solutions Ltd. The New 3DLevelScanner Software Eran Perlstein, Customer Support Director.
Dealer Certification Section 3: Finalizing the Network Connecting to Other Data Sources Network Setup Troubleshooting Troubleshooting Copyright © 2011.
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 22 All About SCSI.
Diagnostic & Troubleshooting Date 06/09/00, Page 1 Diagnostic & Troubleshooting s.
Chapter 10 PLC Processors.
Home Media Network Hard Drive Training for Update to 2.0 By Erik Collett Revised for Firmware Update.
APM Automation Solutions Ltd. Inventory Management - 3DMultiVision Software and MVL System Eran Perlstein, Customer Support Director.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
© 2010 APM Automation Solutions Ltd. All rights reserved. APM Automation Solutions Ltd. 11 APM Customer Support Technical Training Part 4 Configuration.
APM Automation Solutions Ltd. Good Installation Practice Guidelines Eran Perlstein, Customer Support Director.
Integra32 System - Training Course
You Can Measure the Benefits… Training Course MonoScan Setup & Configuration.
Hardware Introduction – Standard vs Q.i
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 22 All About SCSI.
Quick guide to ASIMON configuration For version 3.0 or greater SAFETY AT WORK Date: 3/18/2009.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Internship final report Joanna Staniszewska Cracow University of Technology –
Communication.
3DVision GPRS connection
Complete Of Installation
Configuration and Monitoring
New GPRS (GSM1318)modem wizard
5708 Models and Peripherals
SCADA, DCS and PLC.
GPRS Troubleshooting.
Site Controller Unit and Trunk Interface Unit
Microcontroller basics
Always Connected introduces Tigo SMART 3.0 This guide is interactive!
Commissioning – Remote monitoring
Installation-Troubleshooting-Maintenance
USonic-R™ Remote 2-Channel System
GROUND-FAULT GROUND-CHECK MONITOR
SIO-RTD RTD MODULE.
HVI HIPOT TEST SET Pft sERIES.
NSA-7000 Stylish flush mount Network Sensors
Always Connected introduces Tigo SMART 3.1 This guide is interactive!
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Ethernet Gateway EGX200 - EGX400
Switching & Controlling LoB
Day 2 Training - Technical
724 Temperature Calibrator
DeviceNet Communication Solution for Discrete Devices
Orange box input.
Presentation transcript:

5708 startup and commissioning

Agenda Mechanical Installation Electrical Installation Power and Analog Output Configuration and Fine Tuning 3DVision customer training

Mechanical Installation The 3D Solids Scanner is mounted at the IPF-approved location (Please specify the direct distance from center or X,Y position) Set the 3D Solids Scanner’s 0 degrees mark to point towards the vessel’s center. Verify that there are no obstructions between the 3D Solids Scanner’s horns and the surface area (inside the vessel) Verify that the 3D Solids Scanner is mounted vertical (90 degrees) to the ground Verify that the 3D Solids Scanner protrudes at least 10mm (0.5”) out of its socket

Electrical Installation Verify that the RS485 two wires cable (shielded & twisted pair) is firmly connected to the RS485 terminal at the 3D Solids Scanner’s back panel. Multi-drop system: Verify that the RS485 2 wires (shielded & twisted pairs) are connected in daisy chain method. Multi-drop system: Verify that there are 2 resistors of 120Ω at both ends of the daisy chain. If using a convertor check if the resistor is built in. Check that the resistance is between 60Ω and 70Ω between D+ and D- . Multi-drop system: Set different polling addresses to each 3D Solids Scanner at the daisy chain. LinkPro: Verify that one of the 3D Solids Scanner’s polling addresses is set to 00. Perform an RS485 connection quality test using the 3DVision at the control room. Please specify the results.

Power and analog output Power: 24VDC power supply and connect the 2 wire cable to the PS in terminal at the Rosemount 3D Solids Scanner's back panel. Connect the ground wire if available. Analog 4-20mA Output: Use additional 2 wires to connect the 4-20mA terminal to the control room. Make sure that the PLC is passive. Note: this is not a loop powered device. Analog 4..20mA Output: Check that the 3D Solids Scanner ’s output signal is correct (use current simulation mode)

Configuration and Fine Tuning Updated firmware version to the newest available. Please specify the firmware version. Reset to factory default. Run Configuration wizard (F4) According to the AEF and the approved locator. upload to the scanner the material slope, filling rate and emptying rate. If needed, update other parameters as well. Map false echoes when silo is empty (if needed) and while filling until curve analysis is correct. Reset the scanner Verify readings

3DVision customer training Technical explanation on the 3D Solids Scanner capabilities and technology How to use 3DVision – basic features. How to set full and empty calibrations. Output settings – how to set the 3DVision volume/mass output (silo structure/ fixed bulk density or linearization tables).

Commissioning - Next Step At this point the commission has not been finished. During the 1-2 weeks after installation, remote monitor is mandatory, see “Commissioning – Remote monitoring” presentation.

More details For more details see Startup & Troubleshooting 5708 document