Expanding Your Distribution Network Beyond the Transmission Pipeline

Slides:



Advertisements
Similar presentations
Methane Capture and Use: Current Practices vs. Future Possibilities.
Advertisements

The Gas Advantage ! Information contained in this document is the intellectual property of Venus Gas Products & Services (Mysore) Pvt. Ltd. (VGPSPL) and.
1. 1. Compressor site on pipeline2. Delivered in composite containers 3. Customer Off-Load Station4. Empty trailers return for refilling How Does.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
SMALL SCALE LNG PROSPECTS
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
FiberCo/WaveCo Update Joint Techs February 12, 2007 Minneapolis, Minnesota.
Chapter 5 Construction Tools and Equipment. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Differentiate.
Delivering LNG to remote sites to service pipeline interrupts on a temporary basis.
Mark Kempic President Columbia Gas of Maryland, Inc. Maryland-District of Columbia Utilities Association Fall Conference Fueling the Economic Engine.
Book 2: Chapter 1 Introduction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand commodities.
Corporate Profile. About Us Mission & Vision Our Values Business Units Our Agencies Our Capabilities Organizational Chart Core Competencies Logistics.
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
The Evolving Roles and Responsibilities of Gas Utilities In Today’s Markets Presented by: Hank Linginfelter Executive Vice President, Utility Operations.
Don’t Scrub When You Can Be Clean A Mobile CNG Pipeline Operational in 6-12 months Low capital expense Relatively short contract duration Phased-in approach.
Sage Timberline Hosting
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The strategy for improved electricity distribution maintenance 9 June 2008.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
Biomethane and the European gas infrastructure EBA Workshop 3 September 2015 Thierry Deschuyteneer Executive Secretary.
IEA Bioenergy Conference 2015 UK Biomethane Market Update 50 Plants Injecting Gas by End th October 2015 John Baldwin Managing Director CNG.
Who Pays for Safety? Who Should? November 19, 2015.
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
Resource Development Council 22nd Annual Conference November 29, 2001 Anchorage, Alaska Pipeliners Adding Value Wayne Sartore Vice President Northern Pipeline.
Development Authority of the North Country 317 Washington Street, Suite 414 Watertown, NY An Economic Development Initiative.
Boiler Operations, Maintenance and Performance Conference.
Southeast LDC Gas Forum Infrastructure Updates… Expanding Your Distribution Network Beyond the Pipeline April 12, 2016 Atlanta, Georgia David Lavoie Vice.
London 2062 Symposium London’s Energy Future Peter North 19 th March 2012.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
1 cleanenergyfuels.com State of Louisiana Briefing LNG Vehicle Fueling & Infrastructure Greg Roche Director of Business Development (562) 493 – 2804
Bringing Natural Gas to North Dakota EDND Summer Conference Doug Lee – CEO – Progress Solutions June 22, 2016.
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
. com Page 1 ENRON.COM Sketches for New Services Area May 18, 2000 *This presentation includes sample content from the Energy Transportation Services area.
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
Karratha, WA 3rd November 2016
North Georgia Water Resources Partnership
TriFuel Alternative Fueling Stations
Chairman of the Board and CEO,
Uniper Energy Services
FiberCo/WaveCo Update
Distributed Generation
Designed and Manufactured by
Infrastructure & Safety
Expanding Your Distribution Network Beyond the Transmission Pipeline
Electric Power Distribution: Matching Sources and Loads
Mini dairy plant construction
Emerging Energy Technologies
Achieving the Internal Gas Market The view of gas suppliers
Presentation by Shreenithi Lakshmi Narasimhan
St. Joseph’s CHP Plant Cogen Plant Location Why Cogen: What is Cogen:
Methane Capture and Use: Current Practices vs. Future Possibilities
Presentation to the MA Electric Restructuring Roundtable

COMMISSIONER SUSAN W. RABON NORTH CAROLINA UTILITIES COMMISSION
October 9, 2014 Kenneth W. Yagelski Managing Director Gas Supply
Allegheny Communications Connect
Transportation of oil BY DR. GHULAM ABBAS.
Partnering with Your Utility Companies for Economic Development
Transportation of oil BY DR. GHULAM ABBAS.
Mike Hachey Director, Power Marketing TransCanada Power Marketing Ltd
Compressed Natural Gas Supply Vehicles
Nicor Gas Economic Development
Review Group 166 End User Perspectives 20 September 2007 Julie Cox.
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Greater South East Energy Hub Community Energy and Neighbourhood Planning 24th January 2018 John Taylor.
Christian Rodrigues 2nd period poe
Meeting the challenge: Electrification and Climate Change
Hydrogen Developments
Local, decentralized power generation is the new paradigm
Presentation transcript:

Expanding Your Distribution Network Beyond the Transmission Pipeline

What is a “Virtual Pipeline”? Compressor site on pipeline Full trailer Customer offloading facility Empty trailer returns for refilling

What is a Gas Island? Isolated distribution network of pipeline connects users within a defined area Industrial Commercial Residential Offloading station feeds isolated distribution network that services end users “Virtual pipeline” of tractor trailers delivers compressed natural gas (CNG) to the offloading station

Gas Island Partnership LDC Responsibility Constructs, owns, and operates the gas island distribution network May or may not provide natural gas to the gas island Maintains relationship with customer, including direct billing

Gas Island Partnership Virtual Pipeline Provider Responsibility Constructs and operates the offloading station LDC or “virtual pipeline” provider may own offloading station Sources natural gas from LDC or independently Compresses natural gas, loads, and transports it by tractor trailer to offloading station Provides service 24/7 Removes offloading station equipment when or if gas island is connected to the rest of the pipeline network

Why Build a Gas Island? Serve new customers in advance of planned transmission pipeline extension Distribute to new customers not feasible to serve with traditional pipeline extension Encourage economic development and preserve jobs

Why Build a Gas Island? Generate revenue from customers in advance of transmission pipeline construction Reduce time to market

First-in-the-Nation Gas Island Vermont Gas Systems (VGS) developed a local distribution network to serve customers in advance of their planned transmission pipeline extension VGS chose NG Advantage (NGA) as its “virtual pipeline” service provider Gas island launched in 2015 - Middlebury, Vermont

First-in-the-Nation Gas Island VGS supplies natural gas to NGA NGA compresses natural gas and transports it to offloading site VGS bills customers and maintains direct relationship with them Almost six miles of low pressure piping connects a large dairy processing cooperative, a hard cider producer, a college, and hospital

What are the Logistical Challenges? Investing - capital requirements $5,000,000 - $10,000,000 per compressor station $500,000 for carbon fiber trailer Optimizing trailer capacity when filling trailers in heat and cold Emptying trailers completely Managing just-in-time routing of trailers

What are the Technological Challenges? Sophisticated real-time data management requirements SCADA tools for knowing when trailer is full or empty and when system needs to switch over to 2nd trailer Telemetry on trucks and compressors Telemetry to monitor customer sites Video to monitor and assist drivers

9/13/2016 Northeast Gas Association SCADA

What are the Reliability Challenges? Guarantee of firm service, when needed Adequate storage to cover several days of operation CNG , LNG Redundancy Backup supply contingent upon requirements of customer base

Contact Information David Lavoie Vice President, Business Development dlavoie@ngadvantage.com 617-848-9050