Arun Saini, N. Solyak Fermi National Accelerator Laboratory

Slides:



Advertisements
Similar presentations
Update on ILC ML Lattice Design Alexander Valishev, for the FNAL LET group FNAL AP Dept. Meeting March 7, 2007.
Advertisements

Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
ILC Accelerator School Kyungpook National University
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Issues in ILC Main Linac and Bunch Compressor from Beam dynamics N. Solyak, A. Latina, K.Kubo.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Update on ILC ML Lattice Design Alexander Valishev, for the FNAL LET group FNAL AP Dept. Meeting March 7, 2007.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
@ Fermilab May 15-17, 2006, FNAL KIRTI RANJAN – DOE Review1 ILC Simulation for RDR Kirti Ranjan Fermilab.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Failure modes & Beam loss studies in ILC Bunch compressor and main linac Arun Saini Fermi National Accelerator Laboratory ALCW’15, Tsukuba, KEK, Japan,
Jan Euro-TeV meeting 1 Integrated Simulation of DFS Paul Lebrun Fermilab CD/AMR.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Positron source beamline lattice Wanming Liu, ANL
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
Placet based DFS simulations in the ILC Main Linac. Some preliminary results of error scans open for discussion Javier Resta Lopez JAI, Oxford University.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
ML (BC) Studies update Nikolay Solyak Arun Saini.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
Progress in CLIC DFS studies Juergen Pfingstner University of Oslo CLIC Workshop January.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
ILC Main Linac Beam Dynamics Review K. Kubo.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
From Beam Dynamics K. Kubo
Dark Current and Radiation Shielding Studies for the ILC Main Linac
ILC DR Lower Horizontal Emittance, preliminary study
ILC BDS Alignment, Tuning and Feedback Studies
ILC-CR-0004 Main Linac extension: Implementation status
Correlated Misalignments Studies for LCLS-II SC Linac
Orthogonal Correctors in ILC Main Linac
Benchmarking MAD, SAD and PLACET Characterization and performance of the CLIC Beam Delivery System with MAD, SAD and PLACET T. Asaka† and J. Resta López‡
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
ILC Z-pole Calibration Runs Main Linac performance
Update on ILC ML Lattice Design
SC Quadrupole Magnets in ILC Cryomodules
DFS Simulations on ILC bunch compressor
Adaptive Alignment & Ground Motion
Large Booster and Collider Ring
Wakefield simulations for ILC cavity
Relaxing Quads Roll Alignment tolerance
Update on Dark current generation in ILC Main Linac
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Collider Ring Optics & Related Issues
Studies on orbit corrections
Start-to-End Simulations for the TESLA LC
Linear beam dynamics simulations for XFEL beam distribution system
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Main Linac Beam Optics and Tolerances
Presentation transcript:

ILC Main Linac Lattice Updates and LET Performance for Nominal Misalignments Arun Saini, N. Solyak Fermi National Accelerator Laboratory ALCWS’16, Morioka, Japan, 4-9th December 2016 LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Outline Layout of ILC Main Linac Implementation of Earth’s Curvature Low Emittance Transport and Alignment Tolerances Straight Linac Curved Linac Recent Updates Summary LCWS'16, Morioka, 5-9/12/2016 Arun Saini

ILC schematics Damping Rings Polarised electron source Polarised positron source Ring to Main Linac (RTML) e- Main Linac (incl. bunch compressor) Beam Delivery System (BDS) & physics detectors e+ Main Linac (incl. bunch compressor) Beam dump Total length (500 GeV) 30.5 km SCRF ML (RTML) 22.2 km RTML_BC 2.8 km Positron source 1.1 km BDS / IR 4.5 km Damping Rings 3.2 km In this presentation I will discuss only electron linac LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Main Linac Architecture Two type of CMs, Type A consists of nine, 1.3 GHz 9-cell cavities while Type B consists of 8 cavities and a quadrupole magnet package at the center. An arrangement of Type A Type B Type A makes a ML/RF unit. A total of 285 (282) ML units for e-linac (p-linac). Three RF units with a cold-box at the end makes a cryo-string. Periodic arrangement of cryo-string is interrupted due to insertion of 7.5 m long warm section. Number of cryo-strings between successive warm section forms a cryo unit. It may compose of 11 to 21 cryo-strings. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Twiss Functions Along the Linac V. Kapin, N. Solyak, AWLC ‘14 Transition between cryo unit Zoomed View Maximum periodic Twiss function (except at transition) in horizontal and vertical plane are 120 and 140m respectively. Minimum periodic Twiss function in horizontal and vertical plane are 31 and 40 m respectively. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Curved Linac A key feature of ILC linac is that it follows Earth’s Curvature It simplifies helium transport at 2K Incorporation of Earth’s Curvature requires: A dispersion matching with upstream (bunch compressor) and downstream (beam delivery section). Suppression of periodic dispersion resulting from the Earth’s curvature. Earth’s curvature in lattice can be switch on/off using a flag named CURVE (1/0) LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Implementation of Earth’s Curvature(1) Each straight CM is aligned at its center along a line perpendicular to Earth’s radius. Green blocks represents cryomodules, black block represents BPM while red and blue blocks represent quadrupole mag-net and corrector respectively. Solid black line represents the beam trajectory. Geometrical kink between the ends of CMs are implemented using special element in LUCRETIA named GKICK while in MAD8 it is done using a combination of thin corrector and dipole with same but opposite kicks. In curved linac, nominal trajectory is steered though the center of quads using vertical correctors. Reduce quadrupole kick. Flag STEER can be set on/off using value 1/0 for LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Implementation of Earth’s Curvature(2) Matching of the curved main linac with straight sections (zero dispersion) at both ends and dispersion suppression between the cryo-units are performed using additional kicks implemented using a flag BUMPS. Things to do to switch on/off Earth’s curvature: Straight Linac: CURVE = 0 STEER = 0 BUMPS= 0 Curved Linac : CURVE = 1 STEER = 1 BUMPS= 1 Flags are available in file: ilc007.ML_common.xsif LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Curved Linac: Dispersion Function Zoomed view Optimal period dispersion is achieved by minimizing its value at every defocusing quads. Maximum dispersion in linac is below 3mm. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

LET Studies for ILC Main Linac Beam tracking studies is performed using LUCRETIA A Gaussian distribution of 10k macro particles distributed in 4s are tracked through the lattice. Nominal Straight Linac Nominal Curved Linac No emittance growth in straight linac. Initial abrupt emittance in curved linac is consequence of initial matching. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Nominal ILC main linac: Trajectory Straight Linac Curved Linac Sudden changes in vertical beam trajectory occurs at transition between cryo-units and at both ends of the linac. Maximum excursion of vertical beam trajectory is ~0.5 mm. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Alignment tolerances in Linac Vertical (y) plane BPM Offset w.r.t. Cryomodule 300 μm Quad offset w.r.t. Cryomodule Quad Rotation w.r.t. Cryomodule 300 μrad Cavity Offset w.r.t. Cryomodule Cryostat Offset w.r.t. Survey Line 200 μm Cavity Pitch w.r.t. Cryomodule Cryostat Pitch w.r.t. Survey Line 20 μrad BPM Resolution 1.0 μm Nominal Pure Transverse Pitch/ Tilt. Misalignment is applied only in ‘Y’ plane. Short range wake fields are included in analysis. One to One steering is applied 50 Machines are used. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Random Misalignment implementation Random misalignments of elements are distributed in range of +/- 3s LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Misalignment Tolerances Studies Straight Linac Emittance growth without and with correction Distribution of Emittance after corrections Maximum normalized RMS Emittance without correction is ~4E+06. After one to one steering correction, max. emittance dilution is limited to 2500 nm LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Misalignment Tolerances Studies Curved Linac Emittance growth without and with correction Distribution of Emittance after corrections Final mean emittance growth after one to one steering is ~500nm. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Straight v/s Curved Linac Mean Emittance Growth for 50 seeds No Correction After One to One Correction Curved and straight linac shows same order of emittance growth without and with correction. Effectiveness of one to one steering is largely outlined by BPMs alignment. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Curved Linac: Trajectory Beam trajectories without and with correction Golden trajectories after correction Maximum excursion of beam trajectory without correction is 30mm. After applying one to one correction, excursion of beam trajectories are limited in +/- 3 s of BPMs offset. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Curved Linac: Mean trajectory Element misalignments result in an increase in amplitude of beam trajectory along the linac. LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Emittance growth in curved linac Recent Updates ILC2016 Lattices has been released. New requests had been incorporated in lattice. http://agenda.linearcollider.org/event/6662/timetable/#20151103.detailed (M.Woodley presentation) ILC2016b lattice is not matched for the Earth’s Curvature: Emittance growth in curved linac A significant emittance growth in nominal curved linac (no misalignment). Need to perform a dispersion matching between: Bunch compressor and Main Linac Main linac End to following section. Suppression of dispersion due to Earth’s curvature LCWS'16, Morioka, 5-9/12/2016 Arun Saini

Summary Earth’s curvature has been implemented in ILC main linac lattice. Developed several routines and scripts to implement Earth’s curvature in optics. LET studies have been performed. Curved linac and straight linac shows similar sensitivity against misalignment errors. One to one steering scheme reduces the emittance growth. However, its performance is largely outlined by BPMs offset. Study with more rigorous emittance compensation scheme to validate that emittance growth in main linac remains in allotted budget. Incorporation of Earth’s curvature for ILC2016 b lattice and performing a LET study. Correlated Misalignment Studies. Next Steps LCWS'16, Morioka, 5-9/12/2016 Arun Saini

ILC: Basic Parameters TDR Parameter Lists Arun Saini LCWS'16, Morioka, 5-9/12/2016 Arun Saini