INTRODUCTION to EUROFORM

Slides:



Advertisements
Similar presentations
Portal Framed Construction
Advertisements

Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
CASTING A CONCRETE WALL
FORMWORK Prof Awad S. Hanna.
Heavy Concrete Construction Formwork
Brief Introduction of 3D Construction System
Advanced Construction Technology
5. HEAVY TIMBER FRAME CONSTRUCTION
Chapter 12 Pricing Masonry Carpentry, and Finishes Work.
Foundation Systems.
Skilled Trades 1201 Floor Framing
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Chapter 7 Metals.
What have we accomplished? STRENGTH OF MATERIALS
Framed Building Structure Lectured By: Ms. Noorhidayah Sunarti 15/4/2010.
PRE-FABRICATED STRUCTURES
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
BUILDING CONSTRUCTION V ARCHITECTURAL FINISHING SYSTEMS
ASSIGNMENT Begin on page 197 “The Foundation”.
Wall and Ceiling Construction
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Extra Examples.
Roof and Ceiling Framing
Robotics – 8. Plates (2-sizes) Plate with holes on 0.500" increments and 1/8" diamonds in between. Can be cut on 0.500" increments. Available in two sizes.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
FORMS, SCAFFOLDING and STAGING
Section 2: Safety, Tools and Equipment, and Shop Practices
ET 201 – Architectural Drafting Dr. Dan Trent September 28, 2015
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Chapter 43 Common Commercial Construction Materials.
Marieclaire Monasterio Aracelis Cedeño
Chapter 23: Structural Drafting
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
LEGO Construction Tips.
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
BLUEPRINT READING The ability to do basic drawing and read blueprints are valuable skills needed in all areas of construction. Students do a simple sketch.
Learning Outcome Lesson Objective
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Installs, Dismantles. A. INSTALLS 1. The lower part of Beam should be installed by 2 Supports, which are proved safely. - Support should be maintained.
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
FORMWORK for Civil Engineering Construction Works
Common Components of a Traditional Wood Framed Building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Baby-MIND Modules & Services
ERECT AND DISMANTLE STEEL TUBULAR SCAFFOLDING WITHIN OSHA GUIDELINES.
BUILDING TECHNOLOGY IN CONSTRUCTION
12 Chapter Roof Framing. 12 Chapter Roof Framing.
Introduction Used for covering spaces in the form of roof or floor
INSTALLATION SEQUENCE
FORMWORK DR. Nabil Dmaidi.
FORMWORK FORMWORK COMPONENTS Scaffold frames Plywood
Building Construction Technology I
Warm-up 9/19/16 What template are we using?
Objective 6.02 part 1: Recognize components of construction
•Connecting to the Foundation & Bearing
MATERIALS AND CONSTRUCTION I
CONCRETE FORMWORK Formwork.
Common Components of a Traditional Wood Framed Building
Building Frame (Column & Beam)
Features of Structures
Tool ID Week 7 Clamps and Vises.
Concrete A structural material made by combining cement, sand, aggregate, and water.
Common Components of a Traditional Wood Framed Building
Common Components of a Traditional Wood Framed Building
5. HEAVY TIMBER FRAME CONSTRUCTION
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Chapter 13 Concrete Form Design.
Common Components of a Traditional Wood Framed Building
Presentation transcript:

INTRODUCTION to EUROFORM Euroform is a panel formed by steel frame and special plywood for reinforced concrete construction in any type Most common building material in construction site for experienced technician Euroform panels are systemized formwork, easy to install and dismantle -1-

SPECIFICATIONS (standard size) 600 A / B 1200mm 150mm 9.6kg 200mm 11.1kg 250mm 11.9kg 300mm 12.8kg 350mm 13.7kg 400mm 14.6kg 450mm 15.5kg 500mm 16.9kg 600mm 19.0kg Nail hole 300 Wedge pin hole 300 1200 Profile – F type 300 Tile hole Rivet 300 Gusset plate Cross-bar (Angle) -2-

CHARACTERISTICS Easy to build sheathing board by combination of Euroform to meet structure type – Does not require special tools Less construction workers and less time for construction… … therefore costless Reused for numerous times Therefore, again, costless Easy to get supply Excellent durability of frame Various sizes of Euroform are available for different types and sizes of constructions -3-

ACCESSORIES OUT CORNER product is installed temporarily outside the corner of the structure. It provides the connection between the concrete form panels. The right size Out Corner for the right size Euroform can be used for any connection, depending on the length of the concrete form panels to be connected. IN CORNER product is the part of the formwork, which is installed temporarily inside the corner of the structure. Installed at the corner of the structure, the product provides the connection between the concrete form panels. Various sizes of the product are available for the connection, depending on the space between the concrete form panels. WEDGE PIN product is the part of the formwork, used for connecting the Euroforms. -4-

ACCESSORIES (Cont’d) Flat-Tie is placed in between the Euroforms placed parallel to secure it firmly in place and to assure the thickness of the concrete reinforced. Pipe-Hook is used to fasten the vertical and horizontal pipes. Column-Band are parts that prevent the expansion of the Euroform when pouring cement into the pilar part of the structure. It is also easy to install and dismantle. -5-

INSTALLATION Euroform designed for workers to easily assemble and safely install guarantees high working efficiency to achieve economical construction. KCC World KPJV Inc. can supply Euroform together with the Korean workers (for training purposes, if found necesssary) to safely and easily produce any kind of structure based on extensive experiences in construction. -6-

ECONOMICS (Plywood vs. Euroform) Cost analysis of Plywood covering 100,000sqm Product Specifications Qty. Unit Price (PhP) Total Remarks Plywood 1200mm * 2400mm 17,000 Ea 1,280 21,760,000 re-uses 6 times Pipe 4m 7,730 M 868 6,709,640 I beam 25,000 400 10,000,000 Form oil 1,250 L 100 125,000 Accessories 5 % 132.4 1,929,732 Labor fee Skilled carpenter 19,200 Wage 800 15,360,000 Workers 9,000 500 4,500,000 Contingency 3 42.97 595,800 60,980,172 -7-

ECONOMICS (Cont’d) Cost analysis of Euroform covering 100,000sqm Product Specifications Qty. Unit Price (PhP) Total Remarks Euroform 600mm * 1200mm 7,100 Ea 1,750 12,425,000 Eurofrm re-uses 15 times Incorner (200+200) * 1200 200 1,083.5 216,700 Wedge pin L=200mm 190,020 3 570,060 Flat tie 4m 200,260 3.1 620,806 Pipe 7,730 M 868 6,709,640 Hook clamp 28,720 6 169,620 Form oil 1,250 L 100 125,000 Accessories 5 % 190.68 1,041,841 Labor fee Skilled carpenter 19,200 Wage 800 15,360,000 Workers 9,000 500 4,500,000 Contingency 44.72 595,800 42,334,467 -8-

ECONOMICS (Cont’d) Hence, savings could be as much as 30% The estimated construction cost for a 100,000sqm floor area when using plywood would cost around Php 60,980,172, whereby Euroform could only cost Php 42,334,467 Hence, savings could be as much as 30% -9-