Construction Department Meeting CURRENT STATUS – SEPTEMBER 2016

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Advertisements

Dennis L. Edwards Tunnel
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
CEM-512 Value Engineering Highway Project: South Interchange.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Introduction to a pit installation
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
Madison Avenue Reconstruction Department of Planning and Development.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.
Transportation Report
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Harrisburg Overpass Construction Update July 7, 2015.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Existing Interchange CC 215 Single bridge I 15
2nd Street Drainage and Paving Improvements
GARDEN PARK ESTATES Traffic Calming Circle Modifications February 7, 2013 Presented By: Ricky Templet, Jefferson Parish Councilman District 1.
Town of Brighton, Department of Public Works
Est. Begin Construction
PROJECT INFORMATION SESSION Small Business Enterprise
Lynnhaven Parkway Widening Project Update
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
June 5, 2017.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Hays County Commissioners Court
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
UTILITY DESIGN SERVICES
Interstate 15 North Phase 4 8/19/2015 Update
June 26, 2017.
District 6 – Safety Applications
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Region 4 Managers Meeting May 11, 2016
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
US26: Cornelius Pass Rd -185th Ave
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Transportation Projects
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
SW Gage Blvd - Street Repair Project
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Course Contents Culverts Bridges Buildings 20 November 2018.
CH 42 & TH 13 Construction Update
SE 12th Street Roadway Improvements February 8, 2005.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Adoption of the FY Capital Improvement Program Budget
projects update ATLANTA district
City Council March 18, 2014.
Contract 60X10 Informational Meeting Weber I-55
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
North Augusta High School – Phase 2A and 2B
Metropolitan District | mndot.gov
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
November Bond Election
Presentation transcript:

Construction Department Meeting CURRENT STATUS – SEPTEMBER 2016 Sea Isle Boulevard (CR625) Section II in the Township of Dennis, Cape May County Federal Project No. STP-0115(104) Construction Department Meeting CURRENT STATUS – SEPTEMBER 2016

Sea Isle Boulevard (CR625) - History Garden State Parkway to Ludlam Thorofare Bridge Need for Evacuation Route for Sea Isle Raise Existing Roadway 4.5 feet Construction – $12.73M Atlantic City Electric – Large Steel Poles Construction Start in 2014 - $5.7M to date 73,000 Cubic Yards of I-11 Material Traffic in both directions on southerly side Phase 1A – 2B (Partial) complete Left Turn to GSP Complete

Sea Isle Boulevard (CR625) – Current Status Easterly View Westerly View

Sea Isle Boulevard (CR625) – Current Status Easterly View

Sea Isle Boulevard (CR625) – Current Status Revised Traffic Control Plan for GSP Entrance

Sea Isle Boulevard (CR625) – Stage 2B Work South State Inc. (SSI) to excavate surcharge to subsurface elevation SSI to install DGA for Truck Traffic SSI to install reinforced concrete culverts South Jersey Gas to install 12” Gas Main Directional Drill – Old Sea Isle Blvd Verizon to Raise Existing Manholes SSI to construct roadway on elevated section with guiderail, centerline rumble strip & rpm SSI to install construction barrier on south side

Sea Isle Boulevard (CR625) – 2B Easterly View

Sea Isle Boulevard (CR625) – 2B Easterly View

Sea Isle Boulevard (CR625) – Stage 2D-3A South State Inc. (SSI) relocate traffic to north side of newly constructed roadway SSI to remove existing asphalt from existing south side roadway SSI to install I-11 material to surcharge grade SSI to finish bulkhead work SSI to install DGA Wait for settlement

Sea Isle Boulevard (CR625) – 2D-3A Easterly View

Sea Isle Boulevard (CR625) – 3A REVISED TRAFFIC CONTROL FOR GSP TO BE SUBMITTTED Traffic Control Plan for GSP Entrance – 3A

Sea Isle Boulevard (CR625) – Issues Schedule Osprey Habitat Restriction Marina Driveway Access Modifications Parkway Ramp Access Modifications

Questions?