Storm Water Phase II Permits

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

MS4 Permit and Storm Water Management Program Overview
SW101 Municipal Separate Storm Sewer Systems (MS4s)
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
When It Rains, It Drains An Overview of Pennsylvania’s New Storm Water Management Program.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
Upper Merion Township’s New Storm Water Management Program
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
Storm Water Phase II Permits. Federal Water Pollution Control Act (Clean Water Act) 1972 – NPDES permits added to CWA 1972 – NPDES permits added to CWA.
Measurable Goals and Assessment Tools Setting, Achieving, and Evaluating Measurable Goals and Assessment Tools.
NPDES Stormwater and the Town of Wrightsville Beach.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Introduction to MS4 Stormwater Requirements (2009)
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
The Foundation Developing and Implementing Your Storm Water Management Program.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
N.P.D.E.S. PHASE II Virginia Beach. Local Condition AREA 312 SQUARE MILES CHESAPEAKE BAY 98 SQUARE MILES WATERSHED SOUTHERN 209 SQUARE MILES WATERSHED.
An Overview of our Community’s Stormwater Management Program
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
North Hennepin Community College MS4 Plan October 24, 2014.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Briefing regarding the new State General Stormwater Pollution Control Permit.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
ODOT District MS4 Liaison Training: Why are we here?
Presentation to the Livingston City Council on the Phase II MS4 Permit
STORMWATER MANAGEMENT
Town of Melbourne Beach
Summit County MS4.
Sacramento County Stormwater Quality Program
Stormwater Management Program
John Tinger U.S. EPA Region IX
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Storm Water Phase II Permits

Federal Water Pollution Control Act (Clean Water Act) 1972 – NPDES permits added to CWA 1987 – Regulation of Storm Water Added 1990 – Phase I permits (MS4s) 1999 – Phase II permits (small MS4s) 2004 – NOI & Plan ???

Phase II Permits Based on the 1990 census. CSU’s originally fell into the Phase II group as “Non-Traditional MS4’s”. Based on the 1990 census. Campus population > 10,000. and/or Area population density > 1000 people per square mile.

Submittals Notice of Intent (NOI) & Campus Plans. Application deadline will be at least 365 days after the MS4 General Permit adoption date (scheduled for April 30, 2003 SWRB meeting). Submit NOI, SWMP, and Fee to RWQCB SD Region 9 : (858)467-2988

Best Management Practices www.cabmphandbooks.com

Annual MS4 Permit Costs State Water Resource Board fee schedule: Based on RWQB designation of CSU’s coverage. Populations (Faculty, Staff, Students & Visitors) Up to 10,000 = $2000.00 per year Over 10K = $3000.00 per year for the permit application fee

Generic Plan Minimalist Plan - Minimum possible Best Management Practices (BMP’s) Share writing- originated from CSUF, CSULB, CSUS, UC Presidents Office Cost saving Reduced operational workload Attainable goals over the 5 years Let SWRB or RWRB add BMP’s to plan after submittal. Recommendation-to contact Regional board and get them involved in our plan from the beginning.

BMPs Schedules of activities, prohibitions of practices, maintenance procedures, and other management practices to prevent or reduce the pollution of waters of the United States. BMPs also include treatment requirements, operating procedures, and practices to control site runoff, spillage or leaks, sludge or waste disposal, or drainage from raw material storage.

BMP Resources EPA’s BMP Toolbox CASQA’s BMP Handbooks http://cfpub.epa.gov/npdes/stormwater/menufo/bmps/menu.cfm CASQA’s BMP Handbooks www.cabmphandbooks.com/ ASCE’s BMP Database http://www.bmpdatabase.org Others www.swrcb.ca.gov/stormwtr/bmp_database.html

Requirements Reduce pollutants in storm water discharges to the Maximum Extent Practicable (MEP) by implementing a Storm Water Management Program (SWMP)

Vision Your SWMP is your vision for protecting water quality over the next five years and beyond

Along with BMPs, measurable goals, time schedules, and responsible persons define your program

SWMP 6 Minimum Control Measures as a basis for a SWMP BMPs to address 6 Minimum Control Measures Measurable Goals for each BMP Time Schedules for each Measurable Goal

Public Participation Requirements Comply with State and local public notice requirements Allow the public to review and comment on the permit and SWMP Involve the public in the implementation of SWMP Volunteers for stenciling, link on websites (PDC, RM&S and FAC) to the site that will be hosting the info on the implementation of the permit. RM&S will promote local household hazardous waste events.

Illicit Discharge Detection and Elimination Requirements Storm sewer system map. RM&S will seek assistance from Facility Services for this. An ordinance prohibiting non-storm water discharges Plan to detect and address non-storm water discharges Educate the public on the hazards of illicit discharges

Illicit Discharge Detection and Elimination Requirements Set up as program to identify pollutants, which will tell you what BMP’s to put in place. Prioritize these based on the type of community that you have. The EPA site has some good info about land use. Hotline or weblink to inform enforcement party as to illicit discharges. Follow up process on these calls. Touch base with local activities for consistency

Construction Site Control Requirements An enforce ordinance to require erosion and sediment controls at construction sites MS4 must require construction site operators to us BMPs Site plan and BMP review Public comments/complaints procedures Site inspections and enforcement procedures

Construction Site Control Boiler SWPP from CAL TRANS for BMP’s Incorporate NEPA and CEQA stormwater quality specifications into our programs. SWPP- should be part of bid package regardless of size of project. During bidding process of more than one acre have a brochure that mentions the state permit requirements Go to EPA site in regards to land use

Many communities are similar, look at what they are doing The permittee may rely on a SIE (e.g. Vallecitos Water District) to satisfy one or more of the permit obligations if the separate entity can appropriately and adequately address the storm water issues of the permittee.

Look at what you are already doing Restaurant inspections Household hazardous waste day Handling complaints Pollution Prevention Fair-outreach , distribute logo products not stuff that becomes trash.

Annual Reports due in 2004 Have you done what you said you would do? In light of water quality, have you seen noticeable changes? Are the BMPs you chose effective? Are they implemented well? Improvements? Reporting form

Is what you are doing working? Evaluation/Assessment Parameters Use the information that you are gathering to help tailor your program Ex: If you continually have to clean out a particular storm drains because of sediment, you should focus on construction activity in that drainage area

Iterative approach: Is what you are doing working? Develop Implement Assess Iterative approach: Is what you are doing working?

Activity Examples By the end of year one, we will cleanout 50% of the drop inlets. By the end of year two we will cleanout another 50%. By the end of year one, we will adopt an enforceable ordinance prohibiting non-storm water discharges

Output Examples By the end of year one we will produce two different brochures – one general and one targeting lawn and garden care By the end of year two, we will have collected 5 tons of sediment/wk through street sweeping

Outcome Examples There will be a 50% increase in the people surveyed who know the basics about MS4s between year one and year three There will be a 25% decrease in the number of reported localized flooding incidents between years two and three (with some evaluation of rain data)

Impact Examples 25% reduction in trash collected at creek cleanup between years 1 and 2 and between years 2 and 3 2 degree decrease in water temperature between years 1 and 5 due to re-vegetation of riparian corridor

Measurable Goals Reasonable - did you reach your goal Yes/No?. Do you have direct control over it? After implementation are they still reasonable? Relevant – Are they related to water quality? Are they producing a behavior change? Reaching- Do they meet the MEP?

Responsibilities at CSUSM RM&S – plan submittal, public education and outreach component of permit & training coordination. PD&C – construction project oversight & compliance (pre thru post construction). Facilities – annual review, reporting, hardscape & softscape maintenance Building Marshall (Recommendation)- compliance oversight & enforcement Funding – 1st year: VP FAS, 2nd yr Facilities or VPFAS Other sources that can be used: Utility budget, Parking, Projects.

Emergency Response Prevent any materials other than rainwater from entering the storm drain system. Fire Departments enjoy exemptions to this rule. Facilities and RM&S responsible New supplies have been purchased by RM&S for this purpose. Covers and dikes for storm drains

The Ultimate Goal Protect the Ocean

Board Contacts Jarma Bennett Pamela Barksdale 916)341-5532 bennj@dwq.swrcb.ca.gov Pamela Barksdale (916) 341-5280 pbarksdale@swrcb.ca.gov Risk Management and Safety