Status of Implementation of PCR for Day-Ahead Price Coupling

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
Coordinated Market Coupling for GB. 2 Service Provision specified to create a GB Hub with open access to : All GB connected ICs to coordinate XB Capacity.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
09/12/2011 NWE Stakeholders Group meeting-London Getting to 2014 A contribution from the Regional Initiatives Process Christophe Gence-Creux Head of the.
FUI Feedback on PCG Target Model and roadmap propositions FUI Stakeholder Group Meeting Paris, 4 th November 2009 These comments reflect the general views.
Click to edit Master title style TITRE CEE IG – 20/02/2014 ACER Long-Term Rights Task Force Current status of the discussion with ENTSO-E.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Progress with coupling FUI and CWE region
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Implementation of PCR for Day-Ahead Price Coupling in NWE Andrew Claxton NWE Stakeholders’ Workshop 9 December 2012.
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Project Status Update 2 nd IG meeting NRA meeting October 26 th Joint Presentation from.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Date: 03/05/2007 Vendor Management and Metrics. 2 A.T. Kearney X/mm.yyyy/00000 AT Kearney’s IT/Telecom Vendor Facts IT/Telecom service, software and equipment.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
PCR Status report AESAG, September Supported by:
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
Gas Regional Initiative South South-East
NWE Day-Ahead Price Coupling
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Supported by: PCR Status report AESAG, September
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
SWE Day-ahead market coupling (Pre- and Post-Coupling project)
Information Sharing for Integrated care A 5 Step Blueprint
NWE Day-ahead price coupling project Cost Issue
SWE Day- Ahead market coupling
Coordinated Market Coupling for GB
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
IG meeting, December 5th, 2012, DERA premises, Copenhagen
Context 12 TSOs in North West Europe (NWE) have commenced a project to facilitate a single price coupling across a region covering CWE, Scandinavia and.
Continuous Cross-Border Implicit Intraday Trade Status update
Third package December,
Feedback on the SWE coupling Public Consultation
NWE Day-Ahead Price Coupling
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
SWE Day-ahead market coupling (Pre- and Post-Coupling project)
Supported by: PCR Status report AESAG, September
Global Social Venture Competition Pitch Deck
Performance Framework
Overall Project RAG Status
Structure of presentation
Anatomy of a Project A project has a beginning and an end.
Gas Regional Initiative South South-East
Portfolio, Programme and Project
Overall Project RAG Status:
General update on the status of the NEMOs’ proposals
XBID Overview ERI SWE region Madrid Supported by.
Gas Regional Initiative South South-East
Presentation transcript:

Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012

Price Coupling of Regions (PCR) PXs are fully committed to achieving the European Price Coupling and to the targets in the Cross-Regional Day- ahead Roadmap PCR project established in 2009 aims to deliver the core matching function required for the EPC Now involving all PXs in Europex operating day-ahead markets Design phase nearing completion; implementation to start early 2012 pending resolution of alternative implementation options and necessary validation/ approval by TSOs/NRAs/ACER

PCR: the target solution for coordinated matching

PCR is a key element of the EPC but not the only one! Europex supports the challenging Day-Ahead ACER‘s Roadmap PCR is a key element of the EPC but not the only one!

Progress report on PCR Design phase near completion Algorithm (the mathematical solution) Cosmos chosen as PCR starting point to evolve in to the PCR algorithm Good progress on development of PCR Algorithm prototype, able to support all known PCR requirements Decentralised solution design Simplified high-level architecture agreed Procedures progressed (normal and fallback scenarios) Quotes from system providers to develop the “broker/matcher” coupling systems are currently being requested, based on existing PCR specifications Joint PX agreements nearing finalisation: Co-ownership of common assets (i.e. algorithm) Enduring co-operation agreement

Next Steps The PCR parties are fully committed to the PCR complete solution development and implementation, and will do necessary efforts for its success The PCR parties fully support the ACER European roadmap objectives, where implementing the European price coupling (EPC) in NWE, with a target date of end 2012, is an important milestone The Roadmap targets are demanding and require a coherent and realistic plan with the full support of all involved PXs The PCR parties may put in place suitable temporary de-scoping arrangements of PCR, to avoid any risk of delay in the roadmap milestones (NWE and other implementations). The situation will be reviewed in January, as far as the systems procurement is concerned, when the quotes are received. Proposals for the sharing of PCR costs across European regions/countries are also being progressed Clear commitment that the PCR solution will be the day-ahead coordinated matching solution for Europe

Thank you for your attention! www.europex.org