CSC DETERMINATION PROCESS

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Houston Area Dynamic Reactive Project March 11,
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
West to North CSC Location Scenario 3b WMS August 20, 2008.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
December 2, 2004 Congestion Causes and Effects Presented to WMS January 14, 2005 Beth Garza.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
ERCOT CSC – Vote “Yes” to 3b Jan A. Bagnall Sr. Director Transmission, Reliability & Compliance October 2008.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
CREZ - Voltage Profiles on Series Compensated Lines Prepared by Paul Hassink with AEPSC ERCOT RPG, 11/11/11.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Nodal Planning Go Live Austin, TX February 3, 2011
NMT – Network Operations Modeling & Telemetry - Project
Black Start Study Report
Wind Management at MISO
2016 RTP Update November, 2016 RPG Meeting.
SYSTEM PLANNING THE KEY TO RELIABILITY AND A LIQUID ELECTRIC MARKET
Hurricane Rita.
SOLAR PROGRAMS Presented By Benjamin H. Jordan, P.E. 4/2016.
ERCOT 2009 Five-Year Transmission Plan Update
Director, Transmission Services
Review of Abnormal MCPEs
Oncor Electric Delivery Company LLC
ECEN 460 Power System Operation and Control
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August.
DEC System Voltage Planning - June 2018
Big Stone II Study Update
Presentation transcript:

CSC DETERMINATION PROCESS KENNETH A. DONOHOO MANAGER OF SYSTEM PLANNING,TECHNICAL OPERATIONS kdonohoo@ercot.com www.ercot.com

ERCOT Coincident Hourly Average Six Year Compound Growth PEAK DEMAND Year ERCOT Coincident Hourly Peak Demand MW Annual Growth 1994 43,588 -- 1995 46,668 7.07% 1996 47,683 2.17% 1997 50,150 5.17% 1998 53,689 7.06% 1999 54,849* 2.16% 2000 57,606 5.03% Average Six Year Compound Growth 4.85% *This value would have been greater if there had been no interruptible load curtailments at the time. 5/9/2001

SUMMER 2001 PROJECTIONS LSE MOR* HISTORIC Peak Demand (NCP) 56,759 MW 59,565 MW 60,198 MW Interruptible Load 3,008 MW Firm Peak Demand (NCP) 53,751 MW 56,648 MW 57,190 MW Generation Capacity 69,947 MW Summer Reserve w/o IL 13,188 MW 10,382 MW 9,749 MW Responsive Reserve 2,300 MW Remaining Reserve w/o IL 10,888 MW 8,082 MW 7,449 MW * Middle Of Road 5/9/2001

NEW MAJOR TRANSMISSION FOR 2001 SUMMER AUSTROP-LOST PINES-FPP 345 kV CIRCUIT LYTTON-HOLMAN-FPP 345 kV CIRCUIT MONTICELLO-FARMERSVILLE 345 kV CIRCUIT LIMESTONE-WATERMILL 345 kV DCKT MILITARY HIGHWAY STATCOM +/- 150 MVAR NEW MAJOR TRANSMISSION FOR 2001 SUMMER 5/9/2001

MAJOR TRANSMISSION PROJECTS UNDERWAY FARMERSVILLE-ANNA 345 kV COLETO CREEK–PAWNEE 345 kV LINE CCN DECEMBER 2000 IN SERVICE MARCH 2002 SAN MIGUEL–PAWNEE 345 kV LINE CCN NOVEMBER 2000 IN SERVICE MAY 2002 FARMERSVILLE-ANNA 345 kV CCN JANUARY 2001 IN SERVICE DEC 2002 MORGAN CREEK–SAN ANGELO–COMANCHE SWITCH 345 kV LINE CCN JUNE 2001 GRAHAM – JACKSBORO 345 kV LINE CCN FILED BY JUNE 2001 RIO GRANDE VALLEY SERIES CAPACITOR COMPENSATION IN SERVICE SEPTEMBER 2001 MAJOR TRANSMISSION PROJECTS UNDERWAY HOUSTON AREA UPGRADES 5/9/2001

CSC STEPS SUMMER ON PEAK LOAD FLOW BASE CASE PERFORM EXTENSIVE EVALUATIONS TO IDENTIFY POTENTIAL CONSTRAINTS FORM WORKING GROUP REPRESENTING BROAD RANGE OF MARKET PARTICIPANTS (CSCWG) EXPECTED & ACTUAL ANNUAL CONGESTION COSTS SELECT PROPOSED CSC’S CALCULATE SHIFT FACTORS PERFORM CLUSTER ANALYSIS OF SHIFT FACTORS PREPARE ZONE MAPS BASED UPON CLUSTER ANALYSIS TAC & BOARD APPROVAL INSTALL DATA IN NETWORK MODEL & SETTLEMENTS 5/9/2001

CSC TOOLS PTI PSSE & MUST POWERWORLD SAS STATISTICAL SOFTWARE POWER FLOW ANALYSIS POWERWORLD INDIVIDUAL SHIFT FACTOR CALCULATIONS SAS STATISTICAL SOFTWARE CLUSTER ANALYSIS MS EXCEL & MS ACCESS AVERAGE WEIGHTED SHIFT FACTORS SORTING & MAPPING 5/9/2001

CSC STUDY REGIONS NOT CSC ZONES 5/9/2001

SIGNIFICANT CONSTRAINTS SUMMER 2001 BASED UPON THERMAL LIMITS ONLY Will Vary Based Upon System Conditions & Generation Dispatch WEST to EAST Stability Limit about 1,100 MW From SOUTH TEXAS Stability Limit about 1,250MW To SOUTH TEXAS Voltage Stab Limit about 900 MW Northeast Texas Stability Limits 5/9/2001

CSC CONCERNS ZONES SHOULD HAVE GOOD MARKET BASE MULTIPLE GENERATION ENTITIES WITHIN ZONE CSC’S MUST CROSS ZONE BOUNDARIES SMALL CLUSTERS NOT VALID INTERATIVE PROCESS 5/9/2001

PROPOSED COMMERCIALLY SIGNIFICANT CONSTRAINTS SUMMER 2001 GRAHAM-PARKER 345 kV DOUBLE CIRUIT LINE LIMESTONE-WATERMILL 345 kV DOUBLE CIRUIT LINE PROPOSED COMMERCIALLY SIGNIFICANT CONSTRAINTS SUMMER 2001 As selected by CSCWG 3/05/01 OPTION STP-DOW 345 kV DOUBLE CIRUIT LINE 5/9/2001

2 CSC’s & 3 ZONES CSC ZONES by County OPTION WAS SELECTED GRAHAM-PARKER 345 kV DOUBLE CIRCUIT LINE NORTH2001 LIMESTONE-WATERMILL 345 kV DOUBLE CIRCUIT LINE WEST2001 SOUTH2001 2 CSC’s & 3 ZONES OPTION WAS SELECTED BY TAC MARCH 8, 2001 SELECTED BY ERCOT BOARD MARCH 21, 2001 CSC ZONES by County Actual CSC ZONES will be BUS by BUS and vary slightly 5/9/2001

CSC EXPERIENCE COMMERCIAL MODEL DATA AGGREGATION DOES NOT SUPPORT SPLIT OF GENERATION UNITS SYSTEM CHANGE REQUIRED PHASE II ADDITION DEVELOP DETAILED PROCEDURES INCORPORATE IN PROTOCOLS HANDLING OF POSSIBLE EXCEPTIONS CSC MAY CHANGE EACH YEAR BASED GENERATION & TRANSMISSION CHANGES DEVELOP BETTER MAPPING POWER FLOW TO NETWORK MODEL GEOGRAPHIC MAPS 5/9/2001

QUESTIONS FOR MORE DETAILS AND ADDITIONAL SYSTEM DATA VISIT THE SYSTEM PLANNING TECHNICAL OPERATIONS WEBSITE AT: ftp://ftp.ercot.com/systemplanning/system_planning_department.htm 5/9/2001

LOAD & GENERATION WITHIN CM/CSC ZONES TTC BETWEEN CM/CSC ZONES NORTH2001 LOAD 20,700 MW GEN 22,000 MW 1200 MW WEST2001 LOAD 3,700 MW GEN 5,300 MW 720 MW 2200 MW 3750 MW 580 MW 310 MW SOUTH2001 LOAD 33,000 MW GEN 45,200 MW LOAD & GENERATION WITHIN CM/CSC ZONES TTC BETWEEN CM/CSC ZONES ON PEAK SUMMER 2001 5/9/2001