September 18, 2007 Regional Disturbance

Slides:



Advertisements
Similar presentations
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Advertisements

Goshen Area Bus Reconfiguration
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
August 14, 2003 Blackout Final Report
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
1539pk 2003 MAJOR POWER GRID BLACKOUTS IN NORTH AMERICA AND EUROPE Copyright © P. Kundur This material should not be used without the author's consent.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2014 New York Independent System Operator, Inc. All Rights Reserved. Emergency Transfer Criteria NYSRC Reliability.
1 If I were to give grades today… > 80A A B B B C C C D D D-1
1 Blackout 2003 See:
Review of BPA Voltage Control Conference
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
EnergyForward Fleet Transition 2014 AAPT Summer Meeting July 28, 2014 Minnesota Power David J. McMillan, Executive Vice President.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Houston Area Dynamic Reactive Project March 11,
Cognitive Task Analysis and its Application to Restoring System Security by Robin Podmore, IncSys Frank Greitzer, PNNL.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
Lyndonville Electric Department Feasibility Analysis Review December 2,
1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Managing of Limits during Loss of Analysis Tools/ EMS April 23, 2014.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Operating Topics Part 2 Mike Oatts May 9, 2008 Transmission Customer Forum Destin, Florida Part 2 Mike Oatts May 9, 2008 Transmission Customer Forum Destin,
Smart Grid Schneider Electric Javier Orellana
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Blackstart Hugh Francis Southern Company Transmission Customer Forum September 22, 2006 Hugh Francis Southern Company Transmission Customer Forum September.
PS ERC EC Meeting Systems Stem New Research Initiatives.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
Minnesota Renewable Energy Integration and Transmission
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Western Electricity Coordinating Council
Calvert City Power I, L.L.C. (“Calvert”) Purpose of Meeting
Transmission Planning in ERCOT- Overview
Utility Needs and Smart Grid for Major Storm Events
Impact of Hurricane Ike on
ECE 476 Power System Analysis
Phase Angle Limitations
A Future Oriented Data Platform for the Electric Power Grids
Ensuring Security of Supply in Estonian Transmission Grid
Next Steps in Load Modeling
Grid Integration of Intermittent Resources
ECEN 460 Power System Operation and Control
ISO New England System R&D Needs
Presented by: LADWP November 14, 2017
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
DEC System Voltage Planning - June 2018
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Jonathan young ColumbiaGrid
Interconnection of AES With The Grid
2017 WECC JSIS Report March 21, 2017.
TONBRIDGE POWER GREEN LINE
User Experience with New Solar PV Models California ISO
Palo Verde-COI RAS Retirement
POWER CHALLENGES Several Ways To Solve 7 CHALLENGES.
Palo Verde-COI RAS Retirement
Excelsior Energy’s Mesaba Energy Project
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Smart Grid is Coming Will Customers care?
Presentation transcript:

September 18, 2007 Regional Disturbance PSERC Project Proposal

Event Summary Violent storms moving through the Dakotas and Minnesota early on September 18 forced numerous transmission lines (mainly 345 kV) out of service. As a result, at about 6:20 am EDT, a large portion of the western Midwest Independent Transmission System Operator (MISO) system along with systems in Manitoba and Saskatchewan separated electrically from the rest of the Eastern Interconnection. MISO was able to restore the U.S. section of the grid within 10 minutes, and remained in conservative operation until the grid was stabilized and secure as a precaution. Saskatchewan Power also separated from the Eastern Interconnection when it lost its 230 kV tie lines into Manitoba and North Dakota. Generation outages totaling 896 MW occurred as well, resulting in customer outages. Saskatchewan Power reconnected to grid within an hour, and almost all customer load was restored within 2 hours.

Rough Sketch of Island

Challenges in Real Time Operations There is a need to identify current system margin from transient instability following a disturbance/fault: Current On-Line Transient Stability Assessment typically is setup where: A real time snapshot is taken from State Estimator The State Estimator Solution is solved in an off-line powerflow application And then transient stability analysis is performed using off line software such as PSS/E Dynamic or Power Tech TSAT for given fault scenarios. This approach requires large detailed modeling data for generators, load, and relays. This approach requires “scenario of faults” are pre-determined. This approach can also be time consuming and not viable in the real time operations

Challenges in Real Time Operations Detail Challenges in the model: MISO has a large EMS model that encompass almost all Eastern Interconnection. Creating a conventional dynamic model is not practical. The previously mentioned approach would require a good method of equivalencing. Challenges in determining fault scenario (i.e. Fault Screening): In the Sep 18 event, N-2 contingencies are the initiators of the event. The two line trips do not share any commonality (i.e. they are not common towers, not common breakers, not common right of way, etc)