Description of Project

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Regional Planning Group Charter Revisions May 2008.
Regional Planning Group Project
April 16, 2010 Regional Planning Group RMR Exit for Spencer 5 – Remedial Action Plans Chris Ngai Jay Teixeira.
2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
October 12, 2007 ERCOT Regional Planning Group Meeting RPG-CREZ Task Force Status Report Warren Lasher System Assessment.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Process Management  Identify and involve stakeholders  Find common vision and mission  Define roles and responsibilities  Monitor/evaluate team effectiveness.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
Kurten Switch Project ERCOT Board of Directors Bill Bojorquez System Planning December 13, 2005.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
SCR746 – Dynamic Rating Data to TSP Using ICCP Link Background for ERCOT Board February 21, 2006.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
1 TAC Report to the ERCOT Board February 21, 2006.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
ERCOT Independent Review
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
May 8, 2008 Technical Advisory Committee CenterPoint Energy Rothwood Substation Project Jay Teixeira Manager, Regional Planning.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
2009 ERCOT CSCs and Congestion Zones (10/8/08) C. Richard Ross American Electric Power Service Corporation.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management October 20, 2011.
Houston Import Project – ERCOT Independent Review
Houston Area Constraint Mitigation Project ERCOT Board of Directors March 15, 2005.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
RTWG Report to TAC January 6, 2010 Henry Durrwachter.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Houston Import Study Update
Freeport Area Master Plan Project -
Nacogdoches to Lufkin SS 345 kV Line Project
ERCOT Bylaws Amendments
ONCOR Electric Delivery/ Texas New Mexico Power East Bell County to TNP One 345 kV Line Upgrade Projects Board of Directors July 17, 2007.
Barrilla Junction Area Transmission Improvements Project
Transmission Planning in a Dynamic Environment
Set Point (GR enters the data)
ERCOT 2009 Five-Year Transmission Plan Update
Director, Transmission Services
TAC Report to the ERCOT Board
Warren Lasher Manager, Long-Term Planning and Policy
RMR Exit for Spencer 5 – Remedial Action Plans
Modifications to Planning Charter
ITP20 Flowgate Selection Introduction
Planning Meeting November 4, 2010 Marv Landauer.
Big Stone II Study Update
Main needs of electricity system of the Czech Republic
Presentation transcript:

TXU Electric Delivery Anna – Collin – NW Carrollton 345 kV Line Upgrades TAC – 03/08/2007

Description of Project Upgrade 13.2 mile Anna – Collin 345 kV line from 2-795 kcmil ACSR to 959.6 kcmil ACSS/TW for 3200 Amp capacity. Cost: Approx. $4 M. Upgrade 19.3 mile Collin – NW Carrollton 345 kV line by raising towers for 2292 Amp capacity. Cost: Approx $3 M.

Economic Analysis 1st Part of Project Anna – Collin 345 kV Upgrade Identified as economic in ERCOT 2006 5-Year Transmission Study. Confirmed as economic in this study saving $7.6 M in 2007-08. Part of Valley 345 kV SPS exit strategy.

Economic Analysis 2nd Part of Project Collin – NW Carrollton 345 kV Upgrade Insufficient economic savings to warrant upgrade unless additional low-cost generation is added in northeast. Only one minor overload for one contingency in SSWG case. Will be re-studied with revised DFW-area unit assumptions as part of Coal Plant Integration Study.

Stakeholder Review The Stakeholder review period for this project was held in October 2006 There were no dissenting comments on this package of projects and TXUED resolved all questions

ERCOT Support for the Project ERCOT supports the need for the Anna to Collin 345 kV line upgrade and will be requesting that it be endorsed by the Board.