Transmission Planning in ERCOT- Overview

Slides:



Advertisements
Similar presentations
NERC Footnote b / 12 – Load Loss
Advertisements

RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
2015 RTP Update January, 2015.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
System Strength Discussion
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
ERCOT PUBLIC 10/21/ RTP Scope and Process Review October 21, 2014.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
2007 South DC-Tie Emergency Operation TPTF November 27, 2007.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
RPG Meeting Five Year Plan Extension Brad Schwarz.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Freeport Area Master Plan Project -
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2011 Five-Year Transmission Plan Update
ERCOT 2009 Five-Year Transmission Plan Update
Black Start Overview.
Southern Cross Directives Planning Items
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Representing Rainbow Energy Marketing Corporation
Grid Integration of Intermittent Resources
NERC TPL Standard Overview
Module 4 Smart Grid Implementation Issues
TVA RC 2017 Summer Outlook TVA RC July 27, 2017.
New England Resource Adequacy
Solar Energy Commercialization
Presentation transcript:

Transmission Planning in ERCOT- Overview Nemica Kadel System Planning Engineer September 12, 2017

Talk Outline ERCOT Quick Facts Regional Transmission Planning Long Term System Assessment Project Identification and Justification

ERCOT Quick Facts 75% of Texas land 90% of Texas load – 24 million consumers More than 46,500 miles of transmission lines 570+ generation units Source: ERCOT Quick Facts: http://www.ercot.com/about/profile

ERCOT Quick Facts >77,000 MW peak capacity 71,110 MW record peak demand (set August 11, 2016) Physical assets owned by transmission providers and generators No synchronous connections with other grids Source: ERCOT Quick Facts: http://www.ercot.com/about/profile

ERCOT Quick Facts 1,256 MW power transfers from non-synchronous ties DC North (with SPP), at Oklaunion – 220 MW DC East at Monticello (with SPP) – 600 MW DC South at Eagle Pass (with CFE) – 36 MW SPP: Southwest Power Pool CFE: Comisión Federal de Electricidad DC Ties: Direct Current ties – Asynchronous connections with neighboring grids VFT: Variable Frequency Transformer DC Laredo; VFT (with CFE) – 100 MW DC Railroad at McAllen; Sharyland Utilities (with CFE) – 300 MW

ERCOT Quick Facts Source: ERCOT Quick Facts: http://www.ercot.com/about/profile

Reliability ERCOT’s primary responsibility is to ensure the reliability of the grid. Match generation with system demand. Ensure the transmission system is operated within established limits.

Reliability: Energy and Capacity ERCOT dispatches energy to meet system demand. ERCOT must also ensure there is enough capacity on-line to meet forecasted demand. Forecast Capacity Generation Output System Demand

Reliability: Capacity Reserves ERCOT must also ensure the system can respond to sudden changes in demand. This is accomplished through additional capacity beyond the forecasted load Called Ancillary Services Reserved Ancillary Service Capacities Forecast System Capacity System Demand

Reliability: Transmission Congestion Generation and loads separated by physical distances connected by transmission lines Lines have ratings that cannot be exceeded ERCOT is responsible for adjusting generation levels to mitigate congestion on the transmission system

Transmission Planning at ERCOT Transmission Planning Assessment Regional Transmission Plan (RTP) Long Term System Assessment (LTSA) Dynamics Studies Group Ad-hoc System Stability Assessments Annual NERC stability assessments Subsynchronous Resonance Studies (SSR) Support Operations on stability issues System Development Group RPG Independent Reviews and Special Studies Quarterly Stability Assessment Screening Studies Screening Studies

Regional Transmission Planning Identify transmission projects to meet ERCOT System needs per ERCOT Planning Guide and NERC TPL-001-4 reliability standards. Annual Assessment for near-term needs for six years planning horizon. Coordinated planning process performed by ERCOT with extensive review and input by NERC registered Transmission Planners (TPs), Transmission Owners (Tos) and stakeholders.

Regional Transmission Planning Study Method Case Conditioning Future transmission and generation review and update Load review and adjustment Transmission Outages, Dispatch of variable generators and limit monitoring settings Basecase Reliability Analysis N-1 SCOPF Generator and Transformer outage analysis Contingency Analysis for certain EHV contingencies Add or improve transmission projects to mitigate overloads Additional Reliability Analysis Multiple element outage analysis and extreme event analysis Sensitivity analysis for at least 2 summer peak cases and 1 off-peak case Long-lead time equipment analysis Short circuit analysis Economic Analysis Perform economic analysis Add or improve transmission projects that meet the economic criteria

Long Term System Assessment Biennial evaluation of the potential needs of ERCOT’s extra-high voltage (345-kV) system in the 10 to 15 year planning horizon. Identify long-term transmission needs by analyzing the reliability and efficiency of the ERCOT system under various scenarios.

Long Term System Assessment Study Method LTSA

Challenges in Transmission Planning Load Forecast Generation Resource Mix New and Emerging Technologies Economic and Financial Constraints R-O-W Limitations Regulatory Uncertainty Various Uncertainties and Risks

Social Media ERCOT on Social Media iPhone and Android apps Provide alerts through push notifications Load curve, conservation tips, wholesale prices, general info More than 10,000 downloads Social Media Focus on timely information with frequent updates Twitter: Over 4,000 followers Facebook: Over 1,200 followers

Questions?