STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING

Slides:



Advertisements
Similar presentations
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Advertisements

FUKUSHIMA RESPONSE George Attarian 1/21/2013. Fukushima Response Timeline: March 11: Event occurred March 18: INPO IER 11-1 issued (April 15) March 23:
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
February 26, August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement.
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
FSRUG Presentation – January 2014 Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 3 Reactor Feed Water (FW) Clean Up Piping Break.
California Energy Commission James Madigan April 27, 2015.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Chapter 12 Nuclear Energy.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
Oyster Creek [Exelon Nuclear] Oyster Creek: Operated at power Scheduled Maintenance Outage April 24 – May 13 NRC Assessment (ROP Action Matrix): Licensee.
Decommissioning San Onofre
On-site Storage of Spent Nuclear Fuel in the United States
Analysis of Low Activity Waste Streams and Volumes in Decommissioning NPPs  Lisa Edwards Sr. Program Manager, EPRI LLW Forum April 13-14, 2016.
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
State of the Plant Update
Diablo Canyon Power Plant: State of the Plant Update
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI)
DCPP Performance Based on NRC Performance Indicators
Spent Fuel Pool Instrumentation NRC Order EA
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Spent Nuclear Fuel and Waste Disposition Program Update
Joseph D. Anderson, Chief
Flooding Walkdown Guidance
Operating Experience - New to Licensee EP
STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING
CR3 and Crystal River Energy Complex
9.5 Nuclear Power Although nuclear power does not come from a fossil fuel, it is fueled by uranium, which is obtained from mining and is non-renewable.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Nuclear Waste Storage Current Status and Plans
DOE’s Centralized Storage Design Alternatives and Security Regulations Jeff Williams Project Director, Nuclear Fuels Storage and Transportation.
NRC Cyber Security Regulatory Overview
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
SONGS Past, Current, and Future State May 4, 2016
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Possible Transition from Operating to Decommissioning
NRC Event Number – Event Date
Energy Intensive User Group Generation Maintenance Update
Timeline of Key Events B&W Safety Assessment Indicates Head Inspection Being Performed, Sources of Leaks Identified, No Other Inspections Required D-B.
Session Name: Lessons Learned from Mega Projects
McDonald’s Kalender 2009.
Decommissioning Rulemaking
2300 (11PM) September 21 Blue line is meridian..
Spent Fuel Storage and Transport for Shutdown and Decommissioning Nuclear Plants Rod McCullum November 28, 2018.
National Tsing-Hua University
McDonald’s calendar 2007.
Japanese Nuclear Accident And U.S. Response
NuScale Micro-Reactor Technology
November , 2018 State Roundtable Reports Pennsylvania
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

STATUS OF NJ NUCLEAR PLANTS SINCE LAST MEETING Oyster Creek [Exelon Nuclear] Operated at power with exception of 5 day period in November following scram (turbine control system malfunction) NRC Assessment (ROP Action Matrix): Regulatory Response – White (Mitigating Systems) – 4th Q 2016 – Electromatic Relief Valve (EMRV) inoperable due to improper maintenance Oyster Creek’s Future: Permanent Plant Shutdown In Progress: Discussions with NRC about reductions in the Security Plan and plant components following fuel off load (BREs, EDGs, CST, SW components, etc.) June 2019: NRC Approval of Defueled E-Plan November 30, 2019: “Tentative” Final plant shutdown (comply with NJ plant discharge permit) – Economic alternatives being considered December 30, 2019: “Tentative” Full Core Offload Complete December 31, 2019: NJ/Exelon Consent Order - final shutdown 2020: SAFSTOR vs. Decontamination & Dismantlement Decision

NJ NUCLEAR PLANTS STATUS SINCE LAST MEETING (cont’d) Salem 1 & 2 [PSEG Nuclear] S1: November 9 - 12: Power reduction to 60% for main steam valve repair/steam generator feed-pump repair/500 KV line outage February 28 - March 2: Forced outage to repair reactor coolant sample line leakage May 15: Steam Generator Tube leak occurred (< 1 gpd & stable; EPRI guideline 75 gpd; TS = 150 gpd) NRC Assessment (ROP Action Matrix): Licensee Response S2: April 14 to Present: 22nd Refueling Outage – scheduled for 51 days due to Reactor Baffle-Former Bolt inspections (visual & ultrasonic) and replacement (832 inspected/9 suspect/129 replaced) – Actual outage length: 46 days NRC Assessment (ROP Action Matrix): Regulatory Response – White (Initiating Events) - 2nd Q 2016 - Unplanned Scrams

Hope Creek [PSEG Nuclear] NJ NUCLEAR PLANTS STATUS SINCE LAST MEETING (cont’d) Hope Creek [PSEG Nuclear] October 14 - November 11: 20th Refueling Outage (Fukushima changes – mitigating strategies for beyond-design-basis external events and reliable hardened containment vent) NRC Assessment (ROP Action Matrix): Regulatory Response – White (Mitigating Systems) – 3rd Q 2016 – High Pressure Coolant Injection (HPCI) system inoperable due to water intrusion into oil system

NJ INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS (ISFSI) Oyster Creek – Horizontal Storage [Transnuclear] Capacity: 34 Casks Present Storage: 27 Casks Last Campaign: 2016 (April/May – 4 Casks) Next Campaign: After Permanent Shutdown Salem & Hope Creek – Vertical Storage [Holtec] Capacity: 200 Casks Present Storage: 56 Casks (29 HC; 15 S1; 12 S2) Last Campaign: February 2016* Next Campaign: Summer 2017 (Salem) * Due to Co-60 Shipments

2017 DRILLS & EXERCISES February 28: Oyster Creek Quarterly Drill May 2: Oyster Creek Quarterly Drill May 23: Hope Creek State Graded Exercise June 20: Salem Quarterly Drill August 29: Oyster Creek FEMA Graded Rehearsal Drill Sept 26-28: Oyster Creek FEMA Graded Ingestion Pathway Exercise October 31: Oyster Creek Quarterly Drill December 14: Salem Quarterly Drill

RADIOACTIVE MATERIAL SHIPMENTS IN/OUT OF NJ 2016 (Total) HRCQ*: 11 Non-HRCQ: 10 2017 (YTD) HRCQ: 4 Non-HRCQ: 7 2017 Summer: Expect approximately nine (9) Co-60 shipments from Hope Creek to GE in California * Highway Route Controlled Quantity