Cryomdoule Test Stand.

Slides:



Advertisements
Similar presentations
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Advertisements

Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Progress and Plan for Superconducting RF Cavity RF Group.
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
ESS cavities interfaces
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
HD target.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
Installation of the T600 at Fermilab CSN2, September 22,
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain la Neuve 17-18/04/2013 Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Areal RF Station A. Vardanyan
Final Design Cryogenic and mechanical configurations
Installation of the T600 at Fermilab
S1G Experiment Schedule Plan
CERN – Zanon discussions
Stress and cool-down analysis of the cryomodule
WP5 Elliptical cavities
T5.2: Harmonization - Material and Component Reference
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
UK RFD Pre-Series cryomodule
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
IHEP Cryomodule Status
First High Power Test of the ESS Double Spoke Cavity package
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
CEPC-650MHz Cavity Cryomodule
Prototype cryomodule development
Double-Spoke Cavities
The spoke CM tests at FREIA
Magnetic Field Sensors and Measurements in Cryomodules
Magnetic shielding and thermal shielding
Cool Down Studies of LCLS-II Cryomodules
SNS PPU Cryomodule Instrumentation
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
HWR and Test Cryomodule for China ADS
Presentation transcript:

Cryomdoule Test Stand

Purpose of H.T After cavities string assembled in clean room with magnet and BPM, cavities string would be inserted into a cryostat along guiding trace,and mount power coupler, frequency tuner, HOM damper, all kinds of sensor and so on into the cryostat module. To be ensure all of above process is correct and performance still satisfy the design requirements, H.T should be done before final tunnel installation. It includes to measure the curve of Q0 vs gradient Eacc, coupler power level, tuning range, tuning backlash, characteristics of HOM and so on.

Includes Two radiation shielding room with safety interlock. Multi usage cryostat which can accommodated multi type cavities, such as QWR, HWR, spoke, elliptical cavities. Cryogenic system which can be operated at 2K or 4K with 2.5kW capacities at 4K. Power Supplies incl. 166.6MHz,325MHz,500MHz,650MHz and 1.3GHz. LLRF system for H.T. X-ray detector. Temperature measuring resistor. Residual magnetic field measuring device and demagnetizing tools.

Double Parallel Radiation Shielded Room Outside block size is 20m*15m*5m(L*W*H). Incl. two independent test stand room, during the period of one module be tested, the other can to do preparing tasks. Each stand room have 12 rectangular and 12 round hole for power waveguide inlet. A 3D bird view

Structure of the Radiation Shielded Room Surrounding wall is made by the high density concrete with one meter thickness. On the roof, each test stand room have 12 rectangular and 12 round hole for power WG inlet, neighboring hole is 1.5m separated. The main gate size is 2.3m*0.4m*3m(L*W*H).

For Shielding Door: It is made by iron. Size is 2.57m*0.4m*3.14m(L*W*H). Total Weight is 24.1ton, It supported by double parallel guide track. Equipped 10  trolley wheel  (2 line, each line 5 row) to distributed support the total weight. The track section at cross location can be detached and remounted by hand. A 6m motor driven linear guide is adopted to moving the door.

Question: Inside of test stand room, a movable crane is necessary or not? It’s safety enough to decay to the hazed radiation x-ray for one meter concrete wall or 0.4m iron door? Do you have any idea to simplize the structure of crossover of two track guide line.

Cryostat for H.T Cryostat is used to mount single cell cavity which will be test in horizontal, It can accommodated multi type cavities so as HWR, Spoke and common elliptical cavity with LHe vessel, assembled with tuner, coupler and HOM damper, cryogenic system. Temperature can be control during cooling down, quick temperature rise up during warming up, heat loss measurement. Pressure protection set three gradation level, overpressure should to be released by electric valve, spring valve and final rupture disk sequentially, set action point to 2 bar for rupture disk. Horizontal Test Stand Referance structure of the cryostat

Vacuum system configuration for H.T Inflation valve Pendulum Gate valve cryomodule Dry Pump 0.01m G TP flange For RGA 100L/s IP For leak detector The vacuum pressure at room temperature should be better than 1E-3Pa.

Vibration measuring system Vibration measuring of Cryomodule Vibration monitoring during transportation of Cryomodule Magnetic flux measurement

Vibration measuring system Vibration measuring of Cryomodule Pump LHe Power and Data acquisition Data analysis and display Measuring the frequency range of mechanical vibration : 1-200Hz

Vibration measuring system Vibration measuring of Cryomodule Y X Z audio system power amplifier Arbitrary wave generator

Function parameters about vibration system Working condition: Within cryomodule and outside of cryomodule Measuring the frequency range of mechanical vibration : 1 - 200Hz The sampling rate is greater than 1k/s; Monitor real-time display parameters: waveform, spectrum, data table, bar chart, etc The input signal type and sampling frequency of each channel can be set Signal time domain analysis: single (multi -) trace time domain analysis, analysis points optional Frequency domain analysis: frequency domain FFT analysis, with amplitude spectrum, effective value spectrum, power spectrum, power spectrum density four ways, analysis points can be selected; The vibration frequency, amplitude and natural frequency of the structure can be analyzed.

Vibration measuring system Vibration monitoring during transportation of Cryomodule

Magnetic flux measurement (bartington) Power switch Magnetic field probe Display area Magnetic offset

Magnetic flux measurement Charging Port

Magnetic flux measurement 0-5V The top flange feedthrough Display meter Acquisition card Labview display Control room The top flange 4+4+4 Magnetic field probe H —T—E—Q T—t(△T)

Measurement of Temperature and Magnetic Field 45-deg tilted fluxgate sensor Transverse fluxgate sensor measuring transverse field Cernox sensor Helium Inlet Helium Return cold shield Tank Cernox sensor Cernox sensor

Demagnetization Goal ① CM ambient mag. field spec. <5 mGs Binding wire onto the outer surface of cryostat Goal ① CM ambient mag. field spec. <5 mGs ② Achieve >4 K top to bottom temperature difference at the beginning of transition