JANUARY 13, 2014 Controlling Vibrio Parahaemolyticus in Massachusetts SUZANNE K. CONDON, ASSOCIATE COMMISSIONER DIRECTOR, BUREAU OF ENVIRONMENTAL HEALTH.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
On Board Cooling (FDA Validated – Ice Slurry Method) Delivered at ≤55 o F with harvester’s time/temperature log and in processor’s refrigeration cooler.
Cooling Oysters Within the New 10 Hour Required Time Frame from the Environment to 50 ⁰F or Below in a Refrigerated Storage Area for ICSR 2010 November.
Exposure draft - Standard on Digital Recordkeeping Exposure draft - General Retention and Disposal Authority for Source Records that have been Migrated.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Work Related to Senate Bill 2202 (effective January 1, 2001)
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
SHUCKER-PACKER - Shucking-Packing As a shucker-packer, the dealers will be working with a large variety of processing activities that require control.
SHELLSTOCK SHIPPER – Shellstock Shipping As a shellstock shipper, the dealers will be working with a large variety of processing activities that require.
Question of the Day Question: Compare photosynthesis and cellular respiration. Answer: ……… 3’s Turn In: -p. 48 Analyzing Data #1, 2, 3 -Vocabulary Sheet.
 Effective July 1, 2005  USDA Interim Rule published June 15, 2005  Final rules to formalize food safety requirements published on August 8, 2008 form.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Isabelle Dufresne, Amalia Martinez and Enrico Buenaventura*
Connecticut Vibrio parahaemolyticus Update 2017
Dr. Ir. Yeffry Handoko Putra
KELLET’S WHELK Kelletia kelletii
Motor Carrier Operations
Compliance Report to ERCOT BOD December 2006
Deadline for Requisitions Payment Processing Date
FY16 Budget Build (Banner)
July 18, :00 PM Stony Brook University
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Year 2 Autumn Term Week 12 Lesson 1
NATA Foundation Building Blocks Process
Joint Moorage Facility Sizing
Dealing with your GDPR Challenges
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Julie Woosley, Division of Waste Management
McDonald’s Kalender 2009.
Training Schedule 2018 January February March
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
Training Schedule 2018 January February March
January MON TUE WED THU FRI SAT SUN
McDonald’s calendar 2007.
Year 2 Autumn Term Week 12 Lesson 1
1 - January - Sun Mon The Wed Thu Fri Sat
Barbour County Board of Education
Teacher name August phone: Enter text here.
Maine Vibrio Control Plan Online Annual Training
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Julie Woosley, Division of Waste Management
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Tropical cyclones movement
Maine Vibrio Control Plan New Meadows Lakes- 2018
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Habitat Changes and Fish Migration
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Four Seasons! By izabelle.
We’re Moving Sydney August edition Read online now.
College of Engineering
Presentation transcript:

Virginia’s Vp Control Plan

Virginia Vp Control Plan Governor’s news release November 10, 2015: "Over the past 11 years, the oyster harvest in Virginia has increased from 24,000 bushels in 2003 to an estimated 659,000 bushels last year"

VA labs have not routinely perform PFGE on clinical Vp isolates 1) Describe any strain or environmental data that your State has developed for assessing risks. VA labs have not routinely perform PFGE on clinical Vp isolates Though we do environmental monitoring for Vp, the data are limited and we do not use it in our risk assessment. Risk assessments use the FDA/ISSC risk model based on air/water temperatures.

2) Describe the Vp Control Plan in your State. General Concepts: The Vibrio plan is a joint assessment of Vp as well as Vv. Controls are in place from May 1 – October 31 Most of our harvest is subtidal, but because of the shallow nature of many areas, some harvesters must work on tides. Controls based on curfew times alone were not practical. The Vv controls tend to be more strict, and as such drive the controls in use.

3) Pre-harvest controls. Harvesters have four options to choose from: 1) Curfews. Harvest must be landed and under refrigeration by: May 1 - May 31: 11am June 1 – August 31: 10am September 1 – September 30: 12pm * All controls other than curfews require additional permits.

3) Pre-harvest controls. (continued) 2) On-board icing/refrigeration. Harvesters must continuously ice/refrigerate for the duration of harvest. 3) Dock-to-temperature control time limits with GPS tracking. Harvesters must carry a GPS timing device during harvest, and have their catch under temperature control by: May-5 hours; June-3 hours; July-August 2 hours

3) Pre-harvest controls. (continued) 4) Labeling For Shucking or PHP Only” The regulation requires that a Certified VA Shucker-Packer obtain the permit and shuck all green tagged product. VA regulations do not allow the product to be shipped into interstate commerce with a green tag.

3) Post-harvest controls. Cool to 55º F within 5 hours - The majority of oysters are iced starting on the boat. - Some use mechanical refrigeration, a few use the ice slurry method - HACCP recordkeeping is required to document cooling times

in 2004, our oyster harvest levels were around 20K bushels. 4. Share your assessment of the effectiveness of each control and provide rationale for your conclusions. in 2004, our oyster harvest levels were around 20K bushels. in 2016 we were at around 700k We have maintained single-source cases in the single digits throughout this time.

5. Assess industry compliance in your State. Not perfect, but very good. VMRC estimates 85-90 % compliance with harvest controls. Steadily improving. in 2013 VMRC issued 9 citations for WWHR violations, and the number has decreased each year since. in 2016, only 1 citation was issued. Dealer compliance: in 2016 our audit found 98% compliance with post-harvest controls.