By Wilmer Arellano Spring 2010

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Chapter 10: Project Schedule Planning
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Management.
Project Planning Dr. Jane Dong Electrical and Computer Engineering.
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
Engineering Design Development. Turner College and Career High School.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Statement of the Work SOW By: Wilmer Arellano FIU Spring 2008.
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
 Engineers are regularly engaged in projects in their careers!  Middle management continues to shrink  Industry now organizes more around projects.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Progress Reports. Schedule m m.
Statement of the Work SOW By: Wilmer Arellano FIU Summer 2007 (Updated)
By Wilmer Arellano Fall 2009
SOW / Open Workbench By Wilmer Arellano Summer 2013.
Statement of the Work SOW
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
SOW / Open Workbench By Wilmer Arellano Fall 2010.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
SOW / Open Workbench By Wilmer Arellano Fall 2010 Wilmer Arellano © 2010.
SOFTWARE PROJECT MANAGEMENT
SOW / Open Workbench By Wilmer Arellano Spring 2008.
SOW / Open Workbench By Wilmer Arellano Fall 2008.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Open Workbench By Wilmer Arellano Spring This is just an example, you can customize as you like.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
A Brief intro to Project Management What can it do for you
Project Management Business Management.
Project Management MGT 30725
Copyright All Rights Reserved by
Project Management Chapter 3.
Procuring Professional Services
Studio 4. Project Planning and Literature Review
INT211-Information Technology II
Work Breakdown Structure
Software project mgt. session # 3– lab manual.

Project Controls: As-Built S-Curves
ECE2799 Project Management
System analysis and design
CHAPTER 6 PROJECT TIME MANAGEMENT
Work Breakdown Structure
Software Cost estimation
Guide to Project.
Software project mgt. session # 3– lab manual.
PROJECT MANAGEMENT Bill Biddle.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Studio 4. Project Planning and Literature Review
Information System Analysis
Modern Systems Analysis and Design Third Edition
Project management concepts
CAD DESK PRIMAVERA PRESENTATION.
CHAPTER 6 PROJECT TIME MANAGEMENT
By Wilmer Arellano Fall 2010
Progress Reports.
By Wilmer Arellano Summer 2013
Modern Systems Analysis and Design Third Edition
Information system analysis and design
Presentation transcript:

By Wilmer Arellano Spring 2010 SOW / Open Workbench By Wilmer Arellano Spring 2010

Please download and install http://open-workbench.en.softonic.com/

Project management Product development involves: many people many different tasks. Successful product development projects result in: Efficient use of time, Monetary savings high-quality; Saving in other resources. Project management is the activity of planning and coordinating resources and tasks to achieve the project goals.

Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development that organizes information about: Scope of Work (WBS), Describes the work to be done in detail and specifies the hardware and software involved and the exact nature of the work to be done. Location of Work, Describes where the work is to be performed. Specifies location of hardware and software and where people will meet to perform the work. Period of Performance, This specifies the allowable time for projects, such as start and finish times. Deliverables Schedule, This part list the specific deliverables, describing what and when it is due. Who is responsible for what. Similar to an estimate of somebody fixing your roof

Tasks A piece of work requiring effort, resources and having a concrete outcome (a deliverable). Although a task may be of any size (a project is a very large task), the term task is usually used to refer a smaller piece of work. Tasks are sometimes specified as activities. They take place over a period of time and generally consumes resources. We prefer tasks specified as deliverables. http://www.visitask.com/task-g.asp

Work Breakdown Structure (WBS) The WBS is the hierarchical list of the project's phases, tasks and milestones Phase: A group of related tasks that completes a major step in a project. Task: An activity that has a beginning and an end. Project plans are made up of tasks. Milestone: A reference point marking a major event in a project and used to monitor the project's progress. Scope: The combination of all project goals and tasks, and the work required to accomplish them. The scope translates into the timeline and budget. Budget: The estimated cost of a project. http://office.microsoft.com/en-us/assistance/HA011361531033.aspx#Step%201

Work Breakdown Structure (WBS) This is what we want Deliverables based WBS http://en.wikipedia.org/wiki/Work_breakdown_structure#Example_of_a_work_breakdown_structure

Work Breakdown Structure (WBS) The 100% rule The rule applies at all levels within the hierarchy: the sum of the work at the “child” level must equal 100% of the work represented by the “parent” and the WBS should not include any work that falls outside the actual scope of the project, that is, it cannot include more than 100% of the work The best way to adhere to the 100% Rule is to define WBS elements in terms of deliverables.

Phase: A group of related tasks that completes a major step in a project. Task: An activity that has a beginning and an end. The end is marked by a deliverable

Documenting (WBS) Phase 1.1-Antenna Design Objective: To produce a 50 Ohm input impedance antenna with a power handling capability of 100 Watts with minimum cost and a minimum power gain of 3 dB Approach: Two method will be used and compared to select the more economical design. Method 1 will consist of the recently acquired Antenna Design Software and method 2 will be based on newly published formulas by A. Jones [4] Expected Results: A fully functional transmit antenna with accompanying literature and mounting hardware. This phase will consist of the following tasks: Antenna Design Antenna Construction Antenna Testing Remember this is a deliverable based description

Project Timeline/ Sequential Tasks Tasks are sequential when they are dependent on the output of another task. These because the dependencies impose a sequential order in which the tasks must be completed. We do not necessarily mean that the later task cannot be started before the earlier one has been completed

Project Timeline/ Parallel task Two tasks are parallel when they are both dependent on the same task but are independent of each other.

Project Timeline/ Coupled tasks Coupled tasks are mutually dependent; each task requires the result of the other tasks in order to be completed. Coupled tasks either must be executed simultaneously with continual exchanges of information or must he carried out in an iterative fashion.

Milestones Examples: Prototype Implementation. Testing. Documentation. Demonstration. Each Milestone should be explained with a sentence or two

PERT Charts / The Critical Path The dependencies among the tasks in a PERT chart, some of which may be arranged sequentially and some of which may be arranged in parallel, lead to the concept of a critical path. The critical path is the longest chain of dependent events.

Example 16

Example 17

Example 18

Example 19

Possible Research (Missing Percentages)

This is just an example, you can customize as you like.

In Favorites Gantt Charts, double-click the little square and enter: A new Phases with: Name Category And ID Make sure to select phase

The first phase has been created

In Favorites Gantt Charts, double-click the little square and enter: The Tasks with: Names Category And ID Duration Could leave blank Probably Better Make sure to select task

The first task has been entered

This is how it would look after all tasks for the first phase have been entered

To indicate task’s dependencies drag from the end of one task to the beginning of the next one

Click here to auto-schedule

This is how it would look like Red Color indicates the Critical Path

31

Project with two phases included It is a coincidence that the two phases have same duration

Click to see the PERT The zoom commands were used to fit the chart in the window

On planning, Resource assignment, double click the little square to enter the resources and their costs

Do the same for non labor resources Use Equipment for Space

You can add the cost of components as “material”

Right click on the tasks and select assignment to assign resources to the tasks

Select Resource and click on Assign Enter estimated hours in Estimate

As components were entered with a rate of $100, 1 As components were entered with a rate of $100, 1.5 will represent $150

If you need to add a new task or phase in between tasks or phases, right click the square and select insert task The yellow color indicates that the task is low in resources, more hours or space or equipment, etc are needed

There will be a problem if you click schedule again

As the Audio Interface Module and the Mixer Module were using the same resources, they were converted to sequential. You would need to add more resources to keep the tasks in parallel The zoom commands were used to fit the chart in the window

Another Low Frequency Engineer was included Two more Lab Spaces were included It was not necessary increase the project duration

Click on controlling and then Revise Schedule to see the budget

Updating The Project Status Set The base Line

Updating The Project Status

Updating The Project Status Double Click on the affected tasks and change the changes in estimated and actual time per Resource

Updating The Project Status The task bar changes colour to reflect status (Red / Blue – Not Started) (Purple – Started) (Grey – Progress completed) The task name changes colour to reflect status (Red – Not Started) (Purple – Started) (Green – Completed)

Updating The Project Status If the task is completed enter 0 in Estimate

Updating The Project Status We reduced 20 hours but because of the weekend it appears to be a longer time

Milestones

Milestones Drag the milestone to the desired location

Milestones

Copy and Paste Table cells can be copied and pasted into excel By the way, this is a representation of the WBS

You can use the information from Openworkbench to build your WBS

The Budget Even the Components are included here

& Questions Answers