Teknik Dasar Perkapalan

Slides:



Advertisements
Similar presentations
SOUTHBANK BUSINESS PARK PHASES 6 & 7 VISUALISATIONS May 2007.
Advertisements

MAINTENENCE AND REPAIR OF DVD PLAYER Competency : Improve signal reproduction means of audio video CD.
EXPLAIN THE LOGIC OPERATION APPLYING BASIC DIGITAL ENGINEERING By Sri Wahyuni, S.Pd.
CAPTURING THE RECORDING DO MAKE VIDEO DOCUMENTATION By SRI WAHYUNI.
INSTALATION OF DVD PLAYER Competency : Improve signal reproduction means of audio video CD.
Company Profiles and Introduction
Ancillary Services UNIT 10.
DUPLICATION PROCESS Competency : Making audio record in studio.
Accelerator Safety Workshop SLAC John Blaikie Health Physics Program Manager – SC Office of Science, U.S. Department of Energy Access Control and.
Ship and ship terms III A. Čulić-Viskota. Handling of cargo Shore cranes Ship’s cranes = derricks Lifting capacity Operated by winches In conjunction.
Port Pepard Docks New dock for car exports Review of car movements 1.
New dock for car exports Review of car movements Yukika Ono 1.
New dock for car exports Review of car movements.
OPERATION TOMODACHI HA/DR 22 MARCH March 2011 Mission Highlights: Crew located 3x possible helo landing zones IVO Yamada port N 14148E N.
Teknologi dan Rekayasa TOOLS Hydraulic Press Machine Leveling is a job of machinery maintenance that is very needed to be done to keeps the machinery run.
Sub:- Fluid Power Engineering Topic :- Hydraulic crane
Identifying of butt welds Teknologi Las kapal Teknologi dan Rekayasa Welded joints Butt Edge.
Arranging Bugdget Plan of Construction Cost (RAB) Calculating construction RAB of House Building, water building and Bridge By: SMK NEGERI 5 SURAKARTA.
Dasar Listrik Installing a simple home. Teknologi dan Rekayasa Switch  Connection single switch is a series of single switch that function to set and.
Tool Motorcycle Engineering (021) Applies Tool and Equipments at Work
DETERMINE PROCEDUREAND REPAIR PRISE CALCULATE REPAIR PRISE
REPAIR DOOR PANEL OR FENDER
Identify the science building
REPAIRING MAIN PANEL WHICH WELDED
Competency: Repairing of CD Player
CALCULATION NEEDS WORK CONSTRUCTION MATERIALS WOOD
IMPLEMENTING JOB OF SCAFOLDING
IDENTIFYING BUILDING CONSTRUCTION
DOING MASKING PROCEDURE
Technology and Engineering
SELECT THE TYPE OF CASSETTE APPROPRIATE FUNCTIONALITY
Cooling Sytem Motorcycle Engineering (021)
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING
Identifying House Building Science
Applying the basics of technical drawing
ENGINEERING PLUMBING AND SANITATION
Install Glass in frame / door / wood window
Make a connection and relationship of wood
WOOD AS BUILDING MATERIALS
Teknologi Dan Rekayasa
Applying the basics of technical drawing
Applying of Work Health and Work save
Identify the science building
Understanding Material of Building
DETERMINING PROCEDURE AND PRICE REPAIR
HYDRAULIC SYTEM AND AIR COMPRESSOR
Teknologi Dan Rekayasa
Technology And Engineering
LATHE MACHINE OPERATIONAL 1. Installing live centre in tail stock
BASIC VOCATIONAL BEARING BEARING Sliding bearing,
BASIC VOCATIONAL MACHINING TYPE MACHINERY : LATHE MACHINE MILL MACHINE
Teknologi Dan Rekayasa
Identifying House Building science
Teknik Kendaraan Ringan Dasar Kompetensi Kejuruan
WORKING PRINCIPLE OF CD PLAYER
Making Picture of Construction Application
Teknologi Dan Rekayasa
Applying Building Material Checking
Teknologi Dan Rekayasa
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING
Teknik Dasar Perkapalan
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING
Arranging Budget Planning of construction cost (RAB)
REPAIRING GLASS VEHICLE
Material Handling Material Handling –
Secret Message Let’s practice.
Ferrol Shipyard Total area : m² Dock equipment : m.
Machinery and equipment continued


Presentation transcript:

Teknik Dasar Perkapalan Galangan Kapal

Facilities And Infrastructure Dockyard Graving Dock Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Graving Dock Moving Crane Railway Workshop Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Graving Dock Centre Block Block Side Block Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Graving Dock Centre Block Tool Place Side Block Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Graving Dock Office and Parking Area House Pump Ram Door Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Syncrolift Dock Dock Plan Post / Lift Cradle Position Ship Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Synchrolift Dock Post / Lift Plateform Railway Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Syncrolift Dock Docking Area Post / Lift Cradle Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Syncrolift Dock Plateform Controller Post / Lift Dock Area and Raillway Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Syncrolift Dock Workshop Cradle Railway Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Syncrolift Dock The Ship on Docking Area Controller Post / Lift Dock Area Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Syncrolift Dock Lounching or Docking Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Syncrolift Dock Lounching Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Floating Dock Crane Centre Block Ponton Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Floating Dock Bridge Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Floating Dock Process Docking Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Floating Dock Ledder Stiffener Bollard Teknologi dan Rekayasa

Facilities And Infrastructure Dockyard Floating Dock Hoock House Pump Teknologi dan Rekayasa

The End