The workflow of module assembly for the CBM Silicon Tracking System

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

Marco Bregant Vertex05 - Nikko, November 2005 Dipartimento di Fisica Universit à di Trieste & Istituto Nazionale di Fisica Nucleare (INFN) - Trieste ALICE.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Open Charm Everard CORDIER (Heidelberg) Grako meeting HD, April 28, 2006Everard Cordier.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
1 J.M. Heuser et al. CBM Silicon Tracker Requirements for the Silicon Tracking System of CBM Johann M. Heuser, M. Deveaux (GSI) C. Müntz, J. Stroth (University.
V. Pugatch CBM Collaboration Meeting, Dubna, Oct CBM Silicon Tracking System. Results of the pre-prototype detector module test. V.M. Pugatch.
1 The 3-rd Work Meeting of the CBM -MPD STS Consortium “Technical challenges of the CBM and MPD Silicon Tracking Systems 2009” THE CABLES FOR THE CABLES.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Ooo Performance simulation studies of a realistic model of the CBM Silicon Tracking System Silicon Tracking for CBM Reconstructed URQMD event: central.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
1 A Digitizer for Monolithic Active Pixel Sensors Christina Dritsa 1,2,3, Michael Deveaux 3 1 IPHC, Strasbourg, France 2 GSI, Darmstadt, Germany 2 GSI,
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Performance simulations with a realistic model of the CBM Silicon Tracking System Silicon tracking for CBM Number of integration components Ladders106.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
Hybrid circuits and substrate technologies for the CMS tracker upgrade G. Blanchot 04/MAY/2012G. Blanchot - WIT
CBM Silicon Tracking System. First results of the detector module pre-prototype test. V.M. Pugatch Kiev Institute for Nuclear Research 11 th CBM Collaboration.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Muon detection in the CBM experiment at FAIR Andrey Lebedev 1,2 Claudia Höhne 1 Ivan Kisel 1 Anna Kiseleva 3 Gennady Ososkov 2 1 GSI Helmholtzzentrum für.
20/12/2011Christina Anna Dritsa1 Design of the Micro Vertex Detector of the CBM experiment: Development of a detector response model and feasibility studies.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
CBM Collaboration Meeting. GSI, Darmstadt CBM Silicon Tracking System. CBM-01 sensors characterization. V.M. Pugatch Kiev Institute for Nuclear.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Development of radiation hard Sensors & Cables for the CBM Silicon Tracking System Sudeep Chatterji On behalf of CBM-STS Collaboration GSI Helmholtz Centre.
ATHENA - Module Construction P. Riedler, J. Rochet.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
The Silicon Tracking System of the CBM experiment FAIR 2014, Worms, October 2014 requirements and detector concept system performance prototype.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
Simulation / reconstruction with GEMs at DAC A.Zinchenko, A.Kapishin, V.Vasendina for the collaboration VBLHEP, JINR, Dubna,
KHARKOV TEAM ACTIVITIES FOR CBM WITHIN THE STCU PROJECT P602 1 Representatives: Prof. Slava Borshchov.
Multi-Strange Hyperons Triggering at SIS 100
The STS-module-assembly:
n-XYTER Hybrid Developments
GSI, for the CBM Collaboration
Progress with System Integration of the CBM Silicon Tracking Detector
ATLAS pixel module assembly flow
Oleg Vasylyev, GSI Helmholtz Center, Darmstadt, Germany
FCAL R&D towards a prototype of very compact calorimeter
Evidence for Strongly Interacting Opaque Plasma
A heavy-ion experiment at the future facility at GSI
Simulated vertex precision
Adapting the via last Design
V.M. Pugatch Kiev Institute for Nuclear Research
Work packages status in Torino and perspectives
HCAL Modules -First Ideas
UNIZH and EPFL at LHCb.
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
LHCb VErtex LOcator ENGINEERING DEPARTMENT
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Setup for testing LHCb Inner Tracker Modules
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

The workflow of module assembly for the CBM Silicon Tracking System Carmen Simons, Daniel Soyk and Robert Visinka, GSI, for the CBM Collaboration explore QCD phase diagram the region of high baryon densities and moderate temperatures study of the equation-of-state of nuclear matter at high densities, search for the de-confinement & chiral phase transitions. measure both bulk observables & rare diagnostic probes (charmed particles, vector mesons) The STS Detector of the CBM Experiment @ FAIR STS with 8 tracking stations 106 detector ladders 896 detector modules The Silicon Tracking System (STS) is the core detector that provides track reconstruction and momentum determination of charged particles from beam-target interactions. It will consist of 8 tracking stations that are built from different types of basic functional modules which are mounted on carbon fiber ladders. STS module assembly STS module Step 1: TAB-bonding of the microcables to the STS-XYTER-ASIC (first and second layer), quality measurement and protection with Globtop A STS-module consists of a double-sided silicon microstrip sensor that is connected via microcables to two front-end-electronics PCB´s. connectivity test with Pogo pin socket Assembly material TAB-bonding 16 STS-XYTER- ASIC´s Step 2: TAB-bonding of the microcables to the silicon sensor (first and second layer), quality measurement and protection with Globtop 2 STS-XYTER-PCB´s connectivity tests will be performed with a Pogo pin socket that puts the STS-ASIC in minimal operation double-sided silicon microstrip sensors with 1024 stripes (4 different sizes: 22, 42, 62 and 124 mm length with a width of 62 mm) 2 shielding layers and spacers all in all 32 microcables (4 sets of 8 cables) aligning and TAB-bonding MVD microcables: Step 3: die- and wirebonding of 4 STS-XYTER-ASIC´s to the first row of the PCB, quality measurement and protection with Globtop; then procedure is repeated for the second row The 24 µm thick microcables (10 µm polyimide + 14 µm Aluminum), each with 64 aluminum traces of about 40 µm width, have to be connected on one side to an STS-XYTER-ASIC and on the other side to the P- or N-side of the sensor in two staggered layers with TAB-bonding. testfan of the microcable with bonding area, will be cut after connectivity tests aluminum traces, TAB-bonded to bond pads of a silicon sensor Step 4: glueing of shielding layers and spacers This semi-module then has to be turned to the other side of the sensor and the steps have to be repeated! Cable stack Additional spacers are placed between two signal layers to reduce the capacitance contributions from the adjacent connecting layers. Shielding layers reduce the noise level and prevent shorting between the stacks of cables. The developed fixtures fix the microcables with vacuum and allow alignment in x-, y- and theta-direction before bonding.