Canyons Village Management Association Workforce Housing

Slides:



Advertisements
Similar presentations
Housing Types & Terminology One Dwelling per lot homes: –Bungalow Housing – Common-wall Dwellings – Accessory Apartments Two Dwellings per Lot: – Duplex.
Advertisements

IIT – Bailey Hall – Graduate Student Housing – Existing Conditions
CONSTRUCTION OF SPORTS AND TOURISM CENTER DOLI – VAREŠ Vareš, April MUNICIPALITY VAREŠ.
River Terrace The romance and elegance of a Tuscan Village A planned residential community Approved Vesting Tentative Map LOM 533 By C oastal V ision.
©2015 Mark Hamberg. All rights reserved.. A Town House In The Country Located in the picturesque village of Phinikaria, only fifteen minute’s drive.
Small Zone Lot Parking Exemption in all Mixed Use Commercial Zone Districts.
Information Technology Development Center FLAGLER COUNTY FLORIDA ENGAGING IN THE WORLD WIDE ECONOMY.
Smoke Alarm Placement Example #1 Single story house Laundry Garage Living Dining Kitchen Bedroom Bathroom.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
How to Evaluate a Proposed Project MHSA Small County TA Call Corporation for Supportive Housing Wednesday, November 17,
Trip Generation at the Site Level. Norman W. Garrick Trip Rate Analysis Typically used to estimate trips from sites rather than for whole cities or region.
Twinbrook Sector Plan A New Community in the Technology Corridor
Draft Zoning Code City Council Work Session June 21, 2007.
Indian Trail Town Council Planning Board January 17, 2012.
The SMART CHOICES PROGRAM and TRANSIT-ORIENTED DEVELOPMENT Presentation to ETS Annual Community Conference March 11, 2006.
Part II: Case Studies 1.Arlington, VA: Transit-oriented Development Boosts Economy County-wide. 2.Portland, OR: Streetcar Increases Investment and Redevelopment.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
Winter Park School Name. Equity Inspiring Learning Fully ABTA bonded with own ATOL licence Members of the School Travel.
CHICAGO NEIGHBORHOOD OFFICE SUB-MARKETS John Figlioli, President (773) Ext. 11 Garrett Realty & Development, Inc.
Draft Zoning Code Planning Commission Work Session June 20, 2007.
Draft Zoning Code Residential Focus Neighborhood Meeting May 8, 2007.
Kevin Behm – Addison County Regional Planning Commission Community Build-Out Analysis Nov 5, 2007 New techniques - for an old friend.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Legal Regulations for High School Road II BAINBRIDGE ISLAND MUNICIPAL CODES & COMPREHENSIVE PLAN CONDITIONAL USES.
Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008.
TOD Technical Assistance Panel June 21, rd STREET, San Pablo CA.
 Kevin Behm – Addison County Regional Planning Commission  Kevin Behm – Addison County Regional Planning Commission Community Build-Out.
Your Birchwood Park Golf Centre and Horizones Health and Fitness Club are changing...
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Features of Proposed Homes for Haiti City of God Villages International.
Underground Parking Garden Village Provided $1.27 million Traffic Reduction Strategy Package
Prepared by: Alex Fisch Planning Services Division.
Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site.
DeSoto Hampton Corridor Revitalization Overview of Mixed Use Development.
MOUNTAIN RECREATION FACILITIES MASTER PLAN Mountain Recreation Facilities Master Plan Summit County Council Briefing – June 8, 2016 Project Website:
FERNHURST NEIGHBOURHOOD PLAN Results of Questionnaire James Cottam Chairman Fernhurst Parish Council.
Urban Land Uses 6 Land Classifications. 1.0 Residential Land Uses includes all the places where people live often takes up to 40% or more of the developed.
Affordable Housing and Sustainable Communities (AHSC) Program
Reese A. Jarrett, President Civic San Diego
HOUSING SUMMARY Some of the questions we asked were about the type and amount of housing we might need to plan for in our neighbourhood plan We found out.
Presentation Preview Introductions Purpose for Zoning Code Rewrite
Facilities Committee Rootstown Local School District January 16, 2017.
Jeremy Area Transportation Plan
260 Seven Farms Drive #305 MLS# ~ $255,000
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Gateway Specific Plan Concepts
Background Information
Affordable Housing for the Senior Community
Valley & Third Streets Redevelopment
PROJECT PLANNING MEETING
2040 Comprehensive Plan Open House
Interior Zones and Floor Plans
Darlington Eastern Growth Zone.
Conservation Design for Subdivisions
225 Maple Avenue South Plainfield High Traffic County Road
Washoe County Board of Adjustment
Housing Models: Single Family with Secondary Units
Available for Lease 18,407 sq. ft. Zoned: General Commercial/Service Industrial Up to 4.1 Acres Available 1601 Hwy 395, Minden, Nevada Building.
EXCLUSIVE MULTI - FAMILY OFFERING
How do councils make decisions on where to build new homes?
Moulin de Chapitre tp://.
Athletic Alternate Opportunity
Fair Lawn BOE: Concept Planning
PAD Proposal.
Board Meeting Presentation February 20, 2018
Hotel Conversions Background
Proposed Development in Calne Town Centre
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Board Meeting Presentation February 20, 2018
DLF – The Crest Sector 54 Gurgaon Rental Property in Gurgaon.
Presentation transcript:

Canyons Village Management Association Workforce Housing

Possible Scenarios:

1163 People, 900 Accommodated by 2021 (On-Site) Scenario “A” 1163 People, 900 Accommodated by 2021 (On-Site)

Scenario “A”

Possible Project Location Hwy 224 Canyons Resort Drive To Resort Core LV13 Road Lower Village Road Proposed Property Cabriolet Lift Terminus

Site Accessibility 100% of housing located in “Employment Center” Adjacent to Transit Center Pedestrian Access to the Village Direct Access to the Cabriolet Access to Mountain and Ski Trails Car and Bike – Sharing Programs 3.1 miles to Kimball Junction (access via transit) 4.2 miles to Historic Old Town (access via transit)

Possible Amenities Ski, Bike, & Golf Storage Community Kitchen/Dining Area Laundry Facilities Fitness Center Social Lounge Entertainment Room On-Site Property Management Office

Number of People Accommodated in Lower Village Anticipated Timeline: Estimated 900 @ 4 Floors Estimated 740 @ 3 Floors Start Construction in 2018 Complete Construction in 2021 Unit Configuration Density Initial Design Consists Of: Studio/1 Bedroom/2 Bedroom 340 to 640 sq. ft. Max Occupancy: Studio/1 Bedroom – 2 People 2 Bedroom – 4 people Estimated 160,000 plus amenity space * Accommodations for 263 to 423 tied to the development of the Red Pine Area when developed.

Remaining Workforce Housing Accommodations for an additional 263 to 423 will be tied to the development of “Red Pine Village”, and will be the obligation of the developer. Timeline Triggered in connection with the development of Red Pine Village Location The responsible developer may choose to locate these accommodations on-site, off-site, or a combination of both.

100% 100% 66% 33% Proposed WFH Timeline WFH W/SPA Buildout Timeline 90% 80% 70% 66% 60% Proposed WFH Timeline VS. WFH W/SPA Buildout Timeline 50% 50% 40% 30% 33% 20% 10% 0% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Anticipated Year Of Development

1107 People, 100% On-Site, 1107 Accommodated by 2021 Scenario “B” 1107 People, 100% On-Site, 1107 Accommodated by 2021

Scenario “B”

LV6 Parcel LV6

Benefits of the LV-6 Location Same Site Accessibility and Amenities as Scenario A with the addition of the following: Removes the potential of 400,000 sq. ft. of density Reduction of traffic associated with density reduction Parcel characteristics allow for improved site planning/configuration Larger parcel acreage potentially allows for multiple housing product types and additional outdoor amenities

Number of People Accommodated on LV6 Anticipated Timeline: Start Construction in 2018 Complete Construction in 2021 Estimated 1107 @ 3-4 Floors Unit Configuration Density Initial Design Consists Of: Studio/1 Bedroom/2 Bedroom 340 to 640 sq. ft. Max Occupancy: Studio/1 Bedroom – 2 People 2 Bedroom – 4 people Estimated 220,000 – 250,000 sq. ft. * Accommodations for 263 to 423 tied to the development of the Red Pine Area when developed.

100% 100% 66% 33% Proposed WFH Timeline WFH W/SPA Buildout Timeline 90% 80% 70% 66% 60% Proposed WFH Timeline VS. WFH W/SPA Buildout Timeline 50% 50% 40% 30% 33% 20% 10% 0% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Anticipated Year Of Development