Mountain State Blue Cross Blue Shield Headquarters

Slides:



Advertisements
Similar presentations
ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Advertisements

Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Ann & Richard Barshinger Life Science & Philosophy Building Franklin & Marshall College – Lancaster, PA Michael A. Hebert Structural Option Spring 2006.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
Kirk Stauffer BAE / MAE - Structural Option Senior Thesis Project Life Sciences Building The Pennsylvania State University University Park Campus.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
CHINESE HOSPITAL NEW ACUTE CARE AND SKILLED NURSING FACILITY TIM ARIOSTO STRUCTURAL OPTION AE 482 – SENIOR THESIS DR. RICHARD BEHR – FACULTY ADVISOR.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
NEW VIRTUA VOORHEES HOSPITAL Voorhees, NJ Paul Stewart Structural Option Senior Thesis Presentation 2010 The Pennsylvania State University.
Computer Associates International, Regional Office
Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Coppin State University Physical Education Complex Baltimore, MD Todd Drager Faculty Consultant: Lepage Coppin State University Physical Education Complex.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
One South Dearborn Chicago, Illinois.
North Shore at Canton The Pennsylvania State University
RiverView Condominiums II Chicago, IL
Presentation transcript:

Mountain State Blue Cross Blue Shield Headquarters Parkersburg, WV Department of Architectural Engineering The Pennsylvania State University

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS

PRESENTATION OUTLINE THESIS GOALS THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS THESIS GOALS ADD FLOOR FOR MORE OFFICE SPACE RELOCATE THE BUILDING TO SALT LAKE CITY, UTAH REDESIGN LATERAL SYSTEM INVESTIGATE FOUNDATIONS SCHEDULE IMPACT COST ANALYSIS

PHOTO COURTESY OF ATLANTIC ENGINEERING SERVICES PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS BUILDING STATISTICS OFFICE BUILDING 4 FLOORS – 128,496 SQ. FT. TOTAL COST - 18 MILLION – DESIGN BID BUILD (ADDING FLOOR FOR THESIS REQUIREMENT) STRUCTURAL SYSTEM COMPOSITE STEEL FRAMING 4 CONCENTRICALLY BRACED FRAMES (2 IN EACH DIRECTION) TYPICAL BAY SIZE – 30’ X 30’ PROJECT TEAM OWNER: WOOD COUNTY DEVELOPMENT AUTHORITY ARCHITECT: BURT HILL STRUCTURAL: ATLANTIC ENGINEERING SERVICES CONTRACTOR: G.A. BROWN PHOTO COURTESY OF ATLANTIC ENGINEERING SERVICES

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION ORIGINAL WEST VIRGINIA (4 STORIES) FLOOR PLAN ORIGINAL WEST VIRGINIA (4 STORIES) 3D STRUCTURE PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS RAM STRUCTURAL SYSTEM

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION ADDITIONAL FLOOR FOR WEST VIRGINIA WEST VIRGINIA (5 STORIES) 3D STRUCTURE PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS RAM STRUCTURAL SYSTEM

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION RELATIVE STIFFNESS FOR X DIRECTION 2D MODEL FROM SAP 2000 PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS FRAME 1 FRAME 3 (30’ SPAN FOR EACH BRACED FRAME)

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION RELATIVE STIFFNESS FOR Y DIRECTION 2D MODEL FROM SAP 2000 PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS FRAME 4 FRAME 2 (30’ SPAN FOR EACH BRACED FRAME)

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION DIRECT AND TORSIONAL SHEAR ANALYSIS 5 STORY WEST VIRGINIA BUILDING DRIFTS PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS X DIRECTION X DIRECTION Y DIRECTION Y DIRECTION

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION DRILLED CAISSON CAPACITY AND LOADS CHANGES MADE TO FOUNDATIONS (5 STORY WV BLDG.) PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS 4% INCREASE

NEW GRAVITY FLOOR DESIGN FOR UTAH UTAH 3D STRUCTURE PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS

BRACED FRAME 1 –Y DIRECTION Y DIRECTION-BRACED FRAME 2 BRACED FRAME 3 PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS NEW DESIGN WV DESIGN NEW DESIGN WV DESIGN NEW DESIGN

BRACED FRAME 6 –(X DIRECTION) BRACED FRAME 4 (X DIRECTION) BRACED FRAME 5 BRACED FRAME 6 –(X DIRECTION) PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS NEW DESIGN WV DESIGN NEW DESIGN NEW DESIGN WV DESIGN

RELATIVE STIFFNESS FOR Y DIRECTION 2D MODEL FROM SAP 2000 PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS FRAME 1 FRAME 2 FRAME 3

RELATIVE STIFFNESS FOR X DIRECTION 2D MODEL FROM SAP 2000 PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS FRAME 4 FRAME 5 FRAME 6

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION DIRECT AND TORSIONAL SHEAR ANALYSIS 5 STORY UTAH BUILDING DRIFTS PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS X DIRECTION X DIRECTION Y DIRECTION Y DIRECTION

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION DRILLED CAISSON WV CAPACITY AND UT LOADS CHANGES MADE TO FOUNDATIONS (5 STORY UT BLDG.) PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS 29% INCREASE

ORIGINAL FIRST FLOOR PLAN NEW FIRST FLOOR PLAN PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS

ORIGINAL SECOND FLOOR PLAN NEW SECOND FLOOR PLAN PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION ORIGINAL REMAINING 3 FLOOR PLANS NEW REMAINING 3 FLOOR PLANS PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION CRITICAL SCHEDULE IMPACT OF ADDITIONAL FLOOR SCHEDULE FOR ORIGINAL BUILDING PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS TOTAL DURATION RESULTS 40 ADDITIONAL DAYS

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION BUILDING COMPARISON COST ANALYSIS PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS

CONSTRUCTION MANAGEMENT STRUCTURAL DESIGN ADDITIONAL GRAVITY FLOOR REDESIGN LATERAL SYSTEM FOR UTAH INVESTIGATE FOUNDATIONS PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS YES ARCHITECTURAL REDESIGN COLUMN GRID LAYOUT MINIMIZE CHANGES TO FLOOR PLAN YES CONSTRUCTION MANAGEMENT DETERMINE SCHEDULE IMPACT COST ANALYSIS RECOMMEND IF SITUATION WAS PRESENTED YES

PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS I WOULD LIKE TO EXTEND A SPECIAL THANKS AND ACKNOWLEDGEMENTS TO THE FOLLOWING FOR INPUT CONCERNING THIS THESIS: ATLANTIC ENGINEERING SERVICES: ROBERT BERTOCCHI TIMOTHY JONES ANDY VERRENGIA BURT HILL ARCHITECTS THE PENNSYLVANIA STATE UNIVERSITY: DR. ANDRES LEPAGE PROF. PARFITT PROF. HOLLAND ENTIRE AE FACULTY AND STAFF A SPECIAL THANKS TO MY FRIENDS, AND FELLOW STUDENTS. AN EXTRA SPECIAL THANKS TO MY MOTHER AND FATHER, FOR ALL THE OPPORTUNITIES THEY HAVE PROVIDED ME WITH AND ALWAYS MOTIVATING ME TO BE MY BEST. I WOULD ALSO LIKE TO STATE THAT BODYBUILDING REALLY HELPED ME STAY FOCUSED AND TAUGHT ME A LOT OF DISCIPLINE. STRICT WORKOUT SCHEDULES AND DIETING FOR 16 WEEKS IS A COMMITMENT IN ITSELF. I BELIEVE IT HELPED ME A GREAT DEAL TO STAY FOCUSED THROUGHOUT THIS THESIS AND ON TASK.

QUESTIONS ? PRESENTATION OUTLINE THESIS GOALS BUILDING INTRODUCTION STRUCTURAL DEPTH ADDITIONAL FLOOR RELOCATION TO UTAH ARCHITECTURAL BREADTH COLUMN GRID ADJUSTMENT CHANGES TO FLOOR PLAN CONSTRUCTION MANAGEMENT BREADTH SCHEDULE IMPACT COST ANALYSIS SUMMARY RECOMMENDATIONS THANKS QUESTIONS QUESTIONS ?