Cheap and efficient application of reliable

Slides:



Advertisements
Similar presentations
Antonella Fresa Vilnius, 4th October 2007 Antonella Fresa Technical Coordinator MinervaEC MInisterial NEtwoRk for Valorising Activities in digitisation,
Advertisements

Research Infrastructures WP 2012 Call 10 e-Infrastructures part Topics: Construction of new infrastructures (or major upgrades) – implementation.
Dr. Chantal Lacroix PROGRAMME MANAGER DEPUTY HEAD OF MISSION
Getting European Research Funds Dr Philip Griffiths Associate Head of School, Built Environment Centre for Sustainable Technologies University of Ulster.
Promoting Energy Efficiency in Buildings: the CEB’s Experience León Herrera Director of European Affairs Brussels - 19 June 2009.
CC PolandPlus Clean Coal Technologies Tomasz Szmuc EEC 2010, Katowice 1 June, 2010.
Previous Efforts in the Electricity Sector to Improve Energy Efficiency On Supply Side  Maximum use of natural gas.  Increase of generation efficiency.
Energy Efficiency & Renewable Energyeere.energy.gov Hidda Thorsteinsson Office of Energy Efficiency and Renewable Energy U.S. Department of Energy Hydrothermal.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
POLITECNICO DI TORINO TRIBUTE and DIMMER. DIMMER - The context One of the major challenges in today’s economy concerns the reduction in energy usage and.
Deliverable D 5.5: LCC and SEAPs Analysis Project meeting Brussels, Tuesday 16th June 2015 Eleonora Annunziata.
INTERIM MEETING/ VIENNA NEXT STEPS in the PROJECT IMPLEMENTATION.
Closing: discussion Tendencies of ESP and Language Learning Technologies Possibilities for Mutual Projects Cooperation Nadežda Stojković, Valentina Nejković,
Geological Survey of Slovenia Characteristics of geothermal potential, current utilization and its future (challenges) in Slovenia Andrej Lapanje, Nina.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
EuropeAid Development and Co-operation Eastern Partnership Flagship Initiative: Programme for the Prevention, Preparedness and Response to Man-Made and.
1 Noise and rail What about Belgium ? Martine Serbruyns Federal Public Service Mobility and Transport Brussels - 28 april 2014.
Outlook to FP7 Call3 in Energy Siegfried Loicht Division for European and International Programmes (EIP) Austrian Research Promotion Agency (FFG)
Disaster Preparedness and Prevention Initiative for South Eastern Europe DPPI SEE Seminar on Strengthening Cooperation with Candidate Countries and Western.
BUILD UP Skills Slovenia IEE Skills4SB.SI - Building Skills for Sustainable Building in Slovenia Slides created on:Nov. 15, 2013 Contract N°: IEE/11/BWI/519/SI ,
EU 2030 climate and energy update. Climate Action Network Europe over 120 member organisations in more than 25 European countries.
ENGINE LAUCHING CONFERENCE ORLEANS Geothermal energy and strategies to reduce greenhouse gas emissions C. Fouillac Research Direction.
Mr William Gillett European Commission Head of Unit, Intelligent Energy Executive Agency (IEEA) From Policy to Action “Supporting the development of CHP.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
1 Energy Efficient Buildings PPP: Results and outlook from an industry perspective On behalf Stefano Carosio D’Appolonia SpA/E2BA Coordinator EeB PPP AIAG.
Sustainable Places 2015 Savona, Italy A2PBEER – Affordable and Adaptable Public Buildings through Energy Efficient Retrofitting Jose Luis Izkara Tecnalia.
THE CIVITAS INITIATIVE IS CO-FINANCED BY THE EUROPEAN UNION Promoting Sustainable Urban Mobility with CIVITAS.
Workshop on Eurocodes: Training the trainers, Moscow, 9-10 December, European Legislation and Standardization: Benefits of International Cooperation.
Regulations of Geothermal HP systems at local and regional level in Europe - PROJECT OVERVIEW Contract nº: IEE/11/041-SI Project duration: 01/05/2012.
COST as a network instrument: Actions in Sustainable Construction and Energy Efficient Buildings S3 Platform on smart specialisation Workshop “Towards.
This project is supported by the European Commission under the Grant Agreement number: Energy Efficient Ventilated Façades for Optimal Adaptability.
Funding opportunities under Horizon 2020 Energy 23 rd June 2015 Helen Fairclough EU Energy Focus.
DISSEMINATION MEETING HEAT4U PROJECT Gas Absorption Heat Pump solution for existing residential buildings Luigi Tischer, Project Coordinator HEAT4U PROJECT.
R EHABILITATION OF R AILWAY T RANSPORT IN C ENTRAL AND E ASTERN E UROPE I NTRODUCTION
RIS & IWW TEN-T Calls 2012 Open Annual and Multi-annual Calls for Proposals Nadia Chellafa – Project Manager – Ten-T Executive Agency.
UNEP in collaboration with DISTRICT ENERGY IN CITIES A GLOBAL INITIATIVE TO UNLOCK THE POTENTIAL OF ENERGY EFFICIENCY AND RENEWABLE ENERGY Ms. Lily Riahi.
Horizon 2020 Energy Calls in 2014/15 – Scottish Outcomes and Experiences Edward Ricketts Scotland Europa.
OPENGIS for Water Management OPENGIS for Water Management in Developing Countries JRC Activities on Water Knowledge Management In Developing Countries.
Accelerating progress towards the Green Economy
EUROPEAN REGIONAL DEVELOPMENT FUND CLUE final conference, 24 September 2014, Turin EU Interregional Cooperation State of play and perspectives Johanna.
Workshop of H2020 geothermal research and innovation projects
Aerosols, Clouds and Trace gases Research Infrastructure
Greater Manchester Sustainable Urban Development Plan (SUD)
CEF Action n° 2016-EU-SA-0009 "CYnergy"
CEMCAP – retrofittable CO2 capture for cement plants
Venue: WIIW, Vienna Andrea Mervar, EIZ
Drilling, Stimulation, Completion, Monitoring
Fans & Heaters technical seminar
Barriers and enabling tools for renewable heating and cooling
2nd Steering Committee Meeting Smart Specialisation Platform for Industrial Modernisation 8th November 2017, Valencia.
Spanish Presidency: Priorities in the field of Cohesion Policy
TRAILBLAZER Transport and Innovation Logistics by Local Authorities with a Zest for Efficiency and Realization 1 July 2010 – 31 June 2013 „The sole responsibility.
ESS Cooperation: New Financial supporting frameworks?
AMICI WP1 – Management, coordination and dissemination
The EGI.eu Organisation
SCORES project presentation
ASTRONET Coordinating strategic planning for European Astronomy
Project GEOCOND: Advanced materials and processes to improve performance and cost-efficiency of Shallow Geothermal systems and UTES Javier Urchueguía,
European Innovation Council
KICK-OFF Overview and thematic approach 19th of June 2017
Kick off meeting for selected projects, Brussels 20th January 2015
Brussels, 16 February 2012 Andrea NAM DG Environment, Water Unit
EREK's Self-Assessment Tool Tourism sector (hotels and restaurants)
EGEC Webinar Wednesday 12th December 2018
Promotion of Agricultural Products
Chapter RESOURCE ACCESS AND DEVELOPMENT
Presentation and Discussion of the geothermal roadmap implementation: – which costs reduction and energy efficiency gain in geothermal ?
Reinhard Six, Energy Efficiency Division, European Investment Bank
Industrial Value Chain: A Bridge Towards a Carbon Neutral Europe
A Clean Planet for all A European strategic long term vision for a prosperous, modern, competitive and climate neutral economy.
Presentation transcript:

Cheap and efficient application of reliable Workshop Geothermal panel meeting 8th September 2016 Brussels, September 8th, 2016 Cheap and efficient application of reliable Ground Source Heat exchangers and Pumps Project number: 657982- Project duration: 4 years – Start 1 June 2015 Total project budget: 5.804,847,50 € - Project budget financed: 4.844.652,00 € Project presentation Coordinator: Adriana Bernardi National Research Council (CNR) Institute of Atmospheric Sciences and Climate (ISAC)

University of Valencia (Valencia, Spain) Workshop of H2020 geothermal research and innovation projects Brussels, September 9°, 2016 1. Concept (1/2) General objectives To reduce total cost of ownership of shallow geothermal systems by 25-30% To increase the deployment of this technology by 10% versus current estimates To contribute to the environment with an additional CO2 emission reduction of 1800 T/y To demonstrate the technologies in civil and historical buildings (6 real sites and 10 virtual cases) University of Valencia (Valencia, Spain) Private house (Bucarest, Romania Adriana Bernardi

Workshop of H2020 geothermal research and innovation projects Brussels, September 9°, 2016 1. Concept (2/2) Project innovations Thematic geothermal mapping at local scale for better planning of geothermal systems Drilling machine developments combined with new Ground Source Heat Exchanger (GSHE) designs to improve installation techniques, increase yield, increase safety, reduce permit needs Design software for GSHE and heat pumps and Decision Support System (DSS) for optimum selection, design and implementation of complete systems across different applications and soil conditions Novel heat pumps with improved performances at higher temperatures to avoid having to change heating terminals in retrofitting of existing/historical buildings and to increase efficiency Adriana Bernardi

Workshop of H2020 geothermal research and innovation projects Brussels, September 9°, 2016 2. Results (1/4) Work progresses Pan- European Geological data-set with drillability information realized Structure and costs of main types of GSHE’s defined as reference basis Heat basket developments achieved TRL 7 External diameter modification for more easy installation New drilling tool and installation method Two heat baskets installed in test field Adriana Bernardi

Workshop of H2020 geothermal research and innovation projects Brussels, September 9°, 2016 2. Results (2/4) Co-axial GSHE developments achieved TRL 6 New drilling head for piling manufactured Several simulations on design innovations Prototypes of new inner tube produced Innovations implemented in the field at full scale Adriana Bernardi

Workshop of H2020 geothermal research and innovation projects Brussels, September 9°, 2016 2. Results (3/4) Conceptual heat pump study completed DSS and Software design of building blocks progressing well Final selection of real and virtual demonstration sites made Pan-European legislative and regulatory analysis completed Adriana Bernardi

Technical Museum of Zagreb (Zagreb,Croatia) Workshop of H2020 geothermal research and innovation projects Brussels, September 9°, 2016 3. Barriers Demonstration case in historical site of balkans had to be changed due to unfavourable conditions to exploit shallow geothermal Finacing missing infrastructure like terminals and paying for operating costs (both not foreseen in Cheap-GSHPs budget) is under discussion in Eastern Europe Technical Museum of Zagreb (Zagreb,Croatia) Adriana Bernardi

Thank you for your attention! Workshop of H2020 geothermal research and innovation projects Brussels, September 9°, 2016 Thank you for your attention! www.cheap-gshp.eu Contact: Adriana Bernardi CNR-ISAC E-mail a.bernardi@isac.cnr.it