Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016

Slides:



Advertisements
Similar presentations
Cryomodule Concepts & Cryogenics J.D. Fuerst SPX Technical Study Group Meeting 27-29JUL10.
Advertisements

February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
ESS Cryogenic System Design
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
Final Design Review (90-100%) Production 1.3 GHz CryoModule Marc Ross, Systems Manager for Cryogenic Systems, LCLS-II May 2015 Fermilab ICB.
LCLS-II Cryoplant Overview
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
LCLS-II Cryogenic Distribution System CDS Surface Components PDR Jerry Makara December 16, 2014.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Technical Requirements
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Cryoplant Installation Cost and Schedule Installation PDR
Cryoplant Controls Installation
4.5 K Cold Box Schedule Recovery Directors’ Review
Process Requirements and Design Approach
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
Process Simulation for the LCLS-II Cryogenic Systems
2K Cold Box PDR Introduction
FRIB Cryogenic Support
Cryoplant Installation Overview
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
LCLS-II 2K Cold Box Controls Design Review
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
BriXS – MariX WG 8,9 LASA December 13, 2017.
ESS Target Cryogenic System European Cryogenic Days CERN
Testing/Commissioning of 2 K Cold Box
2K CB FDR Overview:  Agenda, Charge, Review Process
2K Cold Box Process Design
SC1R Cold Box PDR: Process Requirements
SC1R Cold Box PDR Overview
Pressure Piping Analysis
Mathew C. Wright January 26, 2009
Cryoplant Installation Design Summary
ILC Experimental Hall Cryogenics An Overview
LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017.
ESR 2 Presented to Joint Hall A/C Summer Meeting
Scope, Requirements Deliverables & Schedule
Overarching Commissioning Plan
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
SNS PPU Cryomodule Instrumentation
CryoPlant Commissioning
CTF Users’ Perspective
ESR2 Process Cycle Design
SNS PPU Cryomodule Instrumentation
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
ESR2 Process Cycle Design
Presentation transcript:

Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016 4.5K Cold Box Overview Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016

Contractual Milestones Design Schedule Delays Outline 4.5K Cold Box Function Contractual Milestones Design Schedule Delays Schedule Recovery Actions Summary LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Cryoplant First Light & Normal Beam Operations 2 Cryomodule Strings U-Tube Connections 14 MV/m Gradient 2.0≤ Qo ≤3.0 Compressor System 4.5 K Coldbox LHe Dewar 2.0 K Normal Beam Operations 2 Cryoplants 2 Cryomodule Strings U-Tube Connections Removed Gradient - 16 MV/m 2.0≤ Qo ≤3.0 Compressor System He Gas Tanks 4.5 K Coldbox LHe Dewar LN 2 Dewar 2.0 K Coldbox U-TUBE JUMPER CONNECTIONS - IB IB Upstream Distribution Box Downstream Distribution Box Downstream Distribution Upstream String Box Downstream String LH BC 1 L L 1 L 2 L 3 FC 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 IB Cryogenic Cryogenic Transfer 3 . 9 GHz Cryomodule 1 . 3 GHz Cryomodule End / Feed Cap Vacuum Barrier Bypass Line Cryoplant Gas Header Interface Box LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Cryoplant Layout Overview LN2 storage CP1 4.5K Cold Box GHe storage CP1 Oil Removal CP2 4.5K Cold Box CP2 Oil Removal CP2 Compressors CP1 Compressors Oil processor 2K CBX Guard Vacuum CDS Interface Boxes LHe Dewar LHe Dewar Instrument Air Motor Control Center 4 LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Single Plant Operation (CP-1) for First Light, 14 MV/m First Light Design Heat Loads with Qo=2.7x1010 Steady State CW Operation @ 14 MV/m Mode 1: Max Capacity of the Cryoplant Temp Level Heat Load [kW] High Temperature Thermal Shield, (35K) 15.3 Low Temperature Thermal Shield, (5K) 1.3 Primary Temperature 2K 4 Variation in the 2.0 K Heat Loads of First Light for the Selected First Light Gradient with Qo Source: Jlab Refrigerator Specification 79220-S001 One cryoplant is sufficient to support the First Light Operation (Ref: SLAC LCLSII-4.5-EN-0179-R2) LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Two Plant Operation (CP-1 & CP-2) For Design Heat Loads Design Heat Loads with Qo=2.7x1010 Steady State CW Operations @ 16 MV/m Mode 1: Max Capacity of the Cryoplant Temp Level Heat Load [kW] High Temperature Thermal Shield, (35K) 15.3 Low Temperature Thermal Shield, (5K) 1.3 Primary Temperature 2K 4 Variation in the 2K Design Heat Loads with Variable Gradient and Qo Source: Jlab 4.5K Cold Box Specification 79220-S001 (Ref: SLAC LCLSII-4.5-EN-0179-R2) Two cryoplant operation to support variation in gradient and Qo LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

4.5K Cold Box Design Challenges Included in plant performance analysis: Large variation of operational design parameters First Light single plant load (heavy load) vs. Normal two plant operation (~50% load for each plant) Unknown final Qo determination, design basis 2.7x1010 Required extensive heat exchanger/turbine performance analysis for wide possible load variation Level of Seismic design criteria for California Subcontract requirement for CA Seismic licensed PE LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

JLab/SLAC/Air Liquide Engineering Coordination Weekly status and issue resolution meetings Attended by AL/SLAC/JLab engineering, vendor PM JLab procurement Not attended by AL subcontractors PHPK (cold box assembly engineering and fabrication) Sumitomo (heat exchanger manufacturer) Hopper (Seismic PE, Subcontractor to PHPK) LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

4.5K Cold Box Contractual Milestone Schedule FDR Completion Plan: Nov 28th, Seismic Analysis Last Long Lead Item Ordered: 1-Nov-16 LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

4.5K Cold Boxes, 1.04.08.06/.16 Preliminary design review completed Heat exchanger sizing Absorber Beds Process cycle design verification Final Design Review 7-8th Sept ~90% of 92 required documents delivered 3-D modeling of internal piping completed Missing Piping Stress & Seismic Design Hold on top plate (upper cold box) and both cold box vacuum shells until analysis of piping stress and seismic analysis is complete (Note: Internal piping/vessel structure attached to vacuum shell) Missing analysis scheduled to be delivered ~28th November LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Schedule Recovery Action Items Implemented Notification of unsatisfactory schedule performance to vendor senior management Vendor schedule optimization study of remaining work to recover schedule implemented Continuation of weekly AL/Jlab/SLAC engineering coordination meetings Invitation by AL to JLab to attend weekly AL/Subcontractor coordination meeting for direct stakeholder communication PHPK Hopper LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Summary Heat exchanger analysis was longer than expected in completing PDR per contractual date and heat exchanger ordering Heat exchanger delay affected 3-D piping, piping stress and seismic analysis completion dates for FDR Lacking stress/seismic analysis, formal approval for cold box shell ordering (needed for CB fabrication) was delayed FDR Seismic analysis completion is scheduled for Nov 28th Schedule study implemented to recovery schedule slip Expanded JLab interaction with vendor subcontractors LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

MAY I ANSWER ANY QUESTIONS? LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Cryoplant Modes of Operation (1) *Tables from 4.5K Cold Box Procurement Specification 79220-S001 Table 3.4(A) – Mode 1, Max. Capacity Table 3.4(C) – Mode 3, Max. Liquefaction Supply Return Load w p T q [g/s] [atm] [K] [kW] Warm Shield 146 Note 1 35 2.5 55 15.2 Cold Intercept 37 3.25 5.5 1.29 7.50 1.3 4-K Refrigeration 4-K Liquefaction 15 3.2 4.5 1.10 300.0 Sub-Atmospheric 200 1.20 30.0 Supply Return Load w p T q [g/s] [atm] [K] [kW] Warm Shield 155 Note 1 44 2.3 56.5 10.1  Cold Intercept 20 3.2 5.8 1.23 10.8 0.9 4-K Refrigeration 4-K Liquefaction 40 4.5 1.10 300.0 Sub-Atmospheric Table 3.4(B) – Mode 2, Nominal turn down Table 3.4(D) – Mode 4, Max. Refrigeration Supply Return Load w p T q   [g/s] [atm] [K] [kW] Warm Shield 96.7  Note 1  35 2.5 55 10.10 Cold Intercept 27 3.2 5.5 1.29 7.50 0.9 4-K Refrigeration 4-K Liquefaction Sub-Atmospheric 157 4.5 1.20 30.0 Supply Return Load w p T q   [g/s] [atm] [K] [kW] Warm Shield 146  Note 1 35 2.5 55 15.2 Cold Intercept 31 3.2 5.3 1.23 9.0 1.3 4-K Refrigeration 481 4.5 4.45 4-K Liquefaction Sub-Atmospheric The specification requires the cryoplant to support a wide operational variable domain while maintaining plant efficiency. LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Cryoplant Modes of Operation (2) Table 3.4(E) – Mode 5, Max. Fill Table 3.4(F) – Mode 6, Standby Supply Return Load w p T q   [g/s] [atm] [K] [kW] Warm Shield 146  Note 1 35 2.7 55 15.2 Cold Intercept 3.2 5.3 1.23 7.8 1.3 4-K Refrigeration 4-K Liquefaction 45  4.5 1.10 300.0 Sub-Atmospheric 157 1.20 30.0 Supply Return Load w p T q   [g/s] [atm] [K] [kW] Warm Shield 96.7   Note 1 35 2.7 55 10.1 Cold Intercept 25 3.2 5.3 1.23 7.5 0.9 4-K Refrigeration 27 4.5 0.5 Mode 7, 50% Turn Down Supply Return Load w p T q   [g/s] [atm] [K] [kW] Warm Shield [Note 2] 35.0 [±5] 2.5 55 [±5] 7.5 Cold Intercept 3.2 5.0 [±0.5] 1.29 8.0 0.7 4-K Liq. 4.5 1.1 300 Sub-Atm. 100 1.2 30 1.9  A seventh operating point was checked and validated by the vendor for operation at 50% of maximum single plant operation mode as an additional operating point within the domain *Tables from 4.5K Cold Box Procurement Specification 79220-S001 LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Process Model Validation- JLAB/SLAC Calculation (Example: Mode 1- Max Capacity), All 7 Modes completed LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Validation of Heat Exchanger UAs Heat Exchanger Cooling Curve For the heat exchanger sizing, the mode yielding the maximum UA value is considered (highlighted in yellow). Integrated UAs were calculated and compared with the vendor calculated values. Good agreement in the UA and the NTU values LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

Safety Margin on UAs “A uniformly applied UA safety margin of 15% is required for all heat exchangers for the operating mode requiring the highest UA”. The UA provided by the Vendor is in compliance with the requirement for the Heat Exchangers LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016

4.5K CB Pressure Drop in Heat Exchangers-Vendor Data Pressure Drops in HXs for Mode 1: Max Capacity (Example for each Mode) “The ratio of the core pressure drop to the distributor pressure drop > 3.” “The ratio of the sum of the core and distributor pressure drops to the sum of the header and nozzle pressure drop > 3.” The pressure drop values provided by the vendor satisfy the above requirements LCLS-II 4.5K Cold Box Director’s Review, November 16, 2016