Test beam check list Michael JECKEL EN-EA-EC.

Slides:



Advertisements
Similar presentations
HSE instruction REC B.V. Harlingen Safety starts with the man in the mirror Welcome Information: All employees VCA or SCC Emergency exit Telephones off.
Advertisements

Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
SETUP Chapter 6 Lead Abatement for Workers Course.
PROCEDURES AND REQUIREMENTS FOR THE SAFE USE OF RADIOACTIVE MATERIAL Indiana University - Bloomington.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
EHN1 Claude Pesce DGS/RP. Why TREC & buffer zones?  Radiological control of material leaving beam areas is a legal obligation.
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
You can customize your privacy settings. The privacy page gives you control over who can view your content. At most only your friends, their friends and.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Radiation Protection Instructions
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
WG7: 2014 RD51 Test Beam Brief introduction to the RD51 semi-permanent test beam area H4 (mostly for our Indians colleagues) News & Reminder ( mostly for.
Radiation Protection for the Beam Line 4 Schools project Robert Froeschl (DGS/RP)
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Access requirements D. Caforio Università di Bologna – INFN AFP Testbeam Organization meeting – October 18 th, 2012.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
S’Cool LAB Safety Julia Woithe 1.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
K.Gadow CALICE technical review 1 Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4.
Transport & Handling of Detectors TAN Workshop S. Prodon –
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
DAMPE has successfully completed 3 weeks of test beam campaign – 2 weeks in the PS T9, 1 week in SPS H4 – ~60 people participated in the setup and data.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
The Next Generation of a Gamma Irradiation Facility GIF++
Invigilating Cambridge exams
Hazard Recognition: Watch Out for Dangers
Some arrangements for personnel safety 1- Procedures for access
Safety in the Neutrino Platform Hall
NP Hall Visits Guides’ training
Identification of the unused cables
EHN 1 CO2 Leaks inside the beam lines
RD51-WG X June test beam experience: useful information for October
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
East Area Renovation Project team #6 Launch safety agreement
Nikhef/Bonn LepCol meeting
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
DAMPE Status (T9) Steadily taking data since last Thursday
Radiation Protection for the Beam Line 4 Schools project
Hazard Recognition: Watch Out for Dangers
Test beam check list Michael JECKEL EN-EA-EC EDMS:
Radiation Protection for the Beam Line 4 Schools project
LHCb & EYETS
Experimental Areas – LS2 planning
CHemical Inventory Management and
Presentation transcript:

Test beam check list Michael JECKEL EN-EA-EC

Michael JECKEL EN-EA-EC Test beam check list Content: Safety & Radiation Protection Arrival Access Installation Departure 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Safety Defibrillator in building 887 CERN fire brigade 7.44.44 +41.22.767.44.44 from non CERN mobile phones Central bridge 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Safety & Radiation Protection It is mandatory to wear a personal dosimeter in the experimental halls all the time It is mandatory to wear always a helmet and safety shoes in the experimental area It is prohibited to smoke, drink and eat in the experimental halls all the time “Only exception the cafeteria in building 887” Links: How to obtain a dosimeter Safety users guide Contact: ph-safety-office@cern.ch 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Arrival Fill out an Transport Request (Arrival) when the material comes from outside CERN Fill out an Transport Request when you need a crane or forklift to unload the material Request needs to be send five working days prior to the intervention 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Arrival 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Access Fill in an EDH- Access Request for the control room and for patrol rights. Link: Electronic locks instructions To enter the experimental hall the personal dosimeter is enough. Safety courses @ SIR: CERN Safety Introduction Electrical Safety – Awareness Radiation Protection - Supervised Area CERN - Beam Facilities 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Access Only for CERN services 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Installation What are your requirements ? Transport and crane Adjustable support / scanning table Electricity Gas EDMS 1604697 Geometer Magnet Additional beam instrumentation Vacuum pipe Cables IT services Be aware that the experimental area might not be the same as last time! 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Installation Our requirements ! Provide all relevant information of the set up: Dimensions (XYZ), weight and a photo of the detector Movement range of scanning stage Reservation of scanning stage (DESY / XSCA) Drawing of the setup Your requirements All information must be provided three weeks prior to the allocated beam time to the “Beam Line Physicist” & “User Technical Support” Link: SBA page XSCA ±200mm 80kg DESY ±500mm 1000kg 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Vacuum pipe Magnet Detector X.Y meters EDMS 1605378 G:\Workspaces\s\SBA\NORTH\EHN1\Drawings\Zones_PPE 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Installation After installation, remove all non-necessary equipment / material from the beam area to avoid (time- intensive) RP checks at the end 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Installation – patch panel Zone PPE 172 (H2B), 134 (H4A), 146 (H6A), 138 (H8A) & 158 (H8B) A: 36 x SHV B: 60 x BNC C: 10 x RJ45 D: 6 x Type D D: 2 x Profibus E: 2 x Burndy 12 E: 2 x Burndy 19 E: 2 x Burndy 28 F: DESY table control 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Installation Provide adequate attachment points for lifting operations ! Detector 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Departure Make sure that you take ALL your equipment and waste with you ! All equipment and waste that was present in the experimental area has to be considered as potentially activated and thus be registered in the TREC system to be checked by RP. Be aware that for SHIPPING/TRANSPORT requests out of CERN, a Ɣ-spectrometry is mandatory to coop with international RP regulations. In order to avoid that your equipment becomes blocked for weeks (or longer) at CERN, remove all unnecessary items from the beam area before taking beam. Link: TREC instructions TREC 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Departure Don’t forget to select 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list

Michael JECKEL EN-EA-EC Test beam check list Departure The shipment request will be created by the TREC system Never click here ! Dangers: Until RP gives the clearance the material is by definition Radioactive! CERN Location: Is the experimental hall and not an office 16.03.2016 Michael JECKEL EN-EA-EC Test beam check list