Exchange around motion control in radiation facilities

Slides:



Advertisements
Similar presentations
Workshop « HDF5 as hyperspectral data analysis format » ESRF January 11-13, 2010 Synchrotron SOLEIL Alain BUTEAU : Software for Controls and Data Acquisition.
Advertisements

Introduction on WP7/WP9 Dominique PORTE 29/05/2008 Menu What is WP7? What is WP9? Goal of the brainstorming Introduction on WP7/WP9.
Project Reference: FP7-ICT 2011: 6.6 Low carbon multi-modal mobility and freight transport) Project Duration: 1 Oct 2011 – 31 Sept /11/10.
1 3D printing ! The new rapid prototyping machine at the CERN polymer lab: Very interesting for custom made HV components + other potentials (mechanical,
The Future of TANGO or Quo Vadis TANGO ?. TANGO Future The future can be divided into 2 parts : The Realworld The Dreamworld.
First birds’ flyInstituteCity, Country Namedistance [Km]Accelerator Yingbing9329SSRFShanghai, China Om6227 Igor6227NSLS-2Brookhaven, USA Yuke6227 Frank.
ICALEPCS 2007 Summary Karen S. White Jefferson Lab.
Year# of visits Number of visits per year South African synchrotron useage:
CAC01 – April 2010B11 – Data Format and Data Reduction Synchrotron SOLEIL Alain BUTEAU : Head of Controls and Data Acquisition software group) The Data.
5-Oct-051 Tango collaboration status ICALEPCS 2005 Geneva (October 2005)
Informal ICT Management Workshop - OSS 1 Session 1 Open Source Software Software Strategy Challenges Peter Lübkert Informal ICT Management Workshop
1 Copyright © 2009, Oracle. All rights reserved. I Course Introduction.
The ESUO-wayforlight collaboration in 2015 and 2016 Cecilia Blasetti International Project Officer Umbrella 2016 Meeting - ALBA 23/09/16.
(1) REconsider Various contrOLlers for yoUr moTION
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
Opening Remarks Symposium E Substitution of Critical Raw Materials:
Laurent S. Nadolski Synchrotron SOLEIL
EPICS Collaboration Meeting Fall EPICS Training
Solaris status Wojciech Kitka, on behalf of CS&IT group and whole Solaris team Touluse,
Welcome to Computer Science
ESRF Status Report – part 1
Train-the-Trainer: Recruiter Module
Overview of TANGO Control system
The software side of the moon
J. Meyer European Synchrotron Radiation Facility (ESRF)
ESREF 2017 Photonics Reliability Workshop (PRW):
7th Umbrella Harmonisation Meeting
Welcome to the Workshop on
Survey Lead – Pier Valitutti Presented by – Nader Afshar
Guidelines for NSPRC Presentations
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
Project Context Different BeamLine Users
Conference overview DAY 1
MOCRAF Workshop at ICALEPCS 2017
Amanda Beaudoin & Frank Rittemann Bayer Sorghum – Sugarcane Aphid
Pandata Service Verification
Biology at Advanced Laser Light Sources
To the 21st TANGO Meeting!.
POCPA5 POwer Converters for Particle Accelerators
Deciphering symbiotic interactions with metabolomics
HOTEL REVENUE MANAGEMENT: PRICING, MARKETING AND DISTRIBUTION
Phase 4: Compelling Case for Change
Guidelines for NSPRC Presentations
HMIS 101: INTRODUCTION TO HMIS
Model Safe School Programme Training
Capital Investment Network Update on hub Programme
How to edit the title slide
Sébastien Gara, Tango meeting 2016
Introducing the Course: Power Up Your Students’ Research Projects
Essential Components.
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
H2020 – SCREEN 1st International Workshop
PROGRAM Wednesday, May 25th Thursday, May 26th Friday, May 27th
Physics - May 21-25, 2018 Welcome to Today’s webinar
Welcome and Logistics European Commission CEOS 2018 Chair team
Employee engagement Delivery guide
HPE-Microsoft Hybrid Cloud Summit Azure Stack Innovation Centers
Coordination Between Behind-the-Wheel Instruction and Classroom
Entry Guideline Template
Coordination Between Behind-the-Wheel Instruction and Classroom
Common Core Standards:
The MTCA/ATCA Workshop for Research and Industry
WP 10 Data treatment Software
Matter and Technologies
IT 19 SF 20 IT 19 SF 20 Bert Manzlac Enrico Cennini Andreas Hoppe
Visite of the Science Center Group project (Theme: Sustainability)
Umbrella ID Federated Identity for PaN facilities
Standardisation of BRIGHT Beamline Control Systems
Health Equity Strategic Meeting
Presentation transcript:

Exchange around motion control in radiation facilities WORKSHOP Exchange around motion control in radiation facilities

WELCOME to the workshop Exchange around motion control in radiation facilities  on 11th and 12th of May 2011 at Synchrotron SOLEIL site Organized by Synchrotron SOLEIL & MAX IV Laboratory

4 questions ? Summary WHAT WHY WHEN WHO Topics Beginning of a revolution and benefits expected Agenda Participants

A goal is to achieve a written synthesis WHAT ? Sharing information between radiation facilities and providing an overview in motion control Technical solutions used and features Experience and lessons learned Strategic choices Tomorrow : advanced features and new technologies A goal is to achieve a written synthesis

TECHNICAL COLLABORATION WHY ? Why the workshop is organized by SOLEIL and MAX IV ? SOLEIL starts an upgrade of its motion controller used since 2003, in order to maintain the facility at a high level of performance MAX IV needs to define an up-to-date motion system architecture and to select a motion controller. SOLEIL and MAX IV have similar requirements (reliable, performing, flexible) & guidelines (costs & time effective) TECHNICAL COLLABORATION called REVOLUTION : REconsider Various contrOLler for yoUr moTION The first step of the collaboration: workshop about motion control in radiation facilities.

WHY ? Why attend the workshop ? Subtitle : What are the benefits expected ? We know that motion control is a key element ,which takes part in radiation facility performance. Therefore, it is important to: Share information and experiences Share views on future challenges So we are ready to meet new requirements and improve our products (hardware & software)

WHEN ? Agenda Wednesday May, 11th Thursday May, 12th Start End main duration question duration Facility Ref Talk Speaker Chairman 13:30 13:45 00:15   In Welcome & Introduction D. Corruble 14:05 00:05 MaxIV Tl.01 MAXIV : Requirement in motion control for new facility M. Lindberg 14:25 SOLARIS Tl.02 SOLARIS : Requirement in motion control for new facility P Goryl 14:55 00:20 00:10 SOLEIL Tl.03 Status and Plans in Motion Control at SOLEIL 15:10 Br.1 Break / 15:40 DESY Tl.04 Motion control in DESY T. Kracht 15:55 ESRF Tl.05 Status and plans in positioning and motion control at ESRF J-M Clement & J. Lindon 16:25 ALBA Tl.06 Motion control Status in ALBA G. Cuni 16:55 DLS Tl.07 Motion control Status in DIAMOND B. Nutter 17:55 01:00 Vi SOLEIL Facility visit All P. Betinelli 19:15 01:20 Ds.1 Discussion : Experience in motion control & technical solutions used 19:30 Br.2 Di Departure for dinner at restaurant Thursday May, 12th 09:00 09:30 Tl.08 Epics Motor Interface E. Shepherd D. Spruce 10:00 Tl.09 Tango devices for motion and advanced features A. Buteau 10:30 SLS Tl.10 Advanced issues in SLS optics control M. Dach 10:45 Br.3 12:00 01:15 Ds.2 Discussion : Strategies, advanced features & motion control evolution K. Larsson 13:00 Lu Lunch at Soleil 14:00 Co Last round : Conclusion for a written synthesis

people from 7 european facilities WHO ? The participants people from 7 european facilities MAX IV DIAMOND SOLARIS DESY SOLEIL SLS ESRF ALBA Our colleagues from ELETTRA regret not being able to come.

The end of the beginning Any questions ? Enjoy the workshop!